Forwards Aug 1989 Progress Summary of Select Sys Assessment. Unit 4 Closeout Rept (is Mod 8966) Completed 890810
ML17347B347
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/21/1989
From: Goldberg J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-339, NUDOCS 8909280127
Download: ML17347B347 (6)


Text

',gC CELE RATED DI QR1BUTI ON DE M ON ST3$ TI ON SYSTEM C~

r REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 8909280127 DOC. DATE: 89/09/21 NOTARIZED: NO DOCKET N FACIAL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATXON GOLDBERG,J.H. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) R

SUBJECT:

Forwards Aug 1989 progress summary of select sys assessment. I DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution g ENCL J SIZE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 h EDXSON,G 5 5 INTERNAL: NRR/DEST/ADS 7E 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/I CS B 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/RSB 8E 1 1 NRR/DOEA/TSB 11 1 1 NUDOCS-ABSTRACT 1 1 OC/LFMB 1 0 OGC/HDS2 1 0 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR NSIC 1 1 R

S h

NOIR IO ALL rRIDSr'ECXPIKÃIS PIZASE HELP US IO REDUCE RUTE! COARCT 'IHE DOCUMENT CORAL DESK, TOTAL NUMBER SF'f RXM Pl-37 (EXT. 20079) TO XZrXKQQZE %SR MNE HKN DLSX%GBVPXQM

%%%0NlFRR55KMK ENCL 19

P.O. Box14000, Juno Beach, FL 33408-0420 SFPTEIHgfR 2 1 19SS L-89-339 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Select S stem Assessment Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the August 1989 progress summary of the Select System Assessment.

Should there be any questions regarding this information, please contact us.

J. H. Goldberg Executive Vice President JHG/TCG/gp Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 39 230127 390921 t PDR ADOCK 050002S0 A PDC R

an FPL Group company

~,

SELECT SYSTEM REVIEW AUGUST 1989 STATUS ORIGINAL 15 SYSTEMS WALKDOWN AS BUILT RECORDS Breaker List (IS Mod 1265) Scheduled to be completed January 1991 PAID's (IS Mod 1098) Scheduled to be completed December 29, 1989 COMPREHENSIVE REVIEW BY SEG Unit 4 Closeout Report (IS Mod 8966) Completed August 10, 1989.

CONFIGURATION MANAGEMENT Unit 4 Drawing Follow Up (IS Mod 8968) Scheduled completion October 9, 1989 (120 days following end of the recent Unit 4 Refueling Outage)

MISCELLANEOUS ITEMS Unit 3 RHR 887 Valve Replacement (IS Mod 519) Scheduled completion during the next Unit 3 Refueling Outage Unit 4 Outage Related Modifications RHR 887 Valve Replacement (IS Mod 565) Scheduled completion deferred until the next Unit 4 Refueling Outage EDG Redundant. Set of Air Start Motors (IS Mod 576)

Scheduled completion deferred to coincide with the Emergency Power System Upgrade Project Outage currently scheduled to begin in 1991

SELECT SYSTEM REVIEW AUGUST 1989 STATUS Page two ADDITIONAL SYSTEMS ARMS PRMS NCC WALKDOWNS P & ID's (IS Mod 1042) Scheduled for completion during next, Unit 3 Refueling Outage P & ID Update Schedule to be determined following walkdowns COMPREHENSIVE REVIEW BY SEG Phase II Review scheduled for completion by October 15, 1989