| {{#Wiki_filter:AC CELZRATZD DISI'RIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8809150297 DOC.DATE: 88/09/08 NOTARIZED: | | {{#Wiki_filter:AC CELZRATZD DISI'RIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) |
| NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION WATSON,R.A. | | ACCESSION NBR:8809150297 DOC.DATE: 88/09/08 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION WATSON,R.A. Carolina Power & Light Co. |
| Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) | | RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Suppl to special rept:on 880412,Vent Stack 5A WRGM 1WV-3547-1 declared inoperable. | | Suppl to special rept:on 880412,Vent Stack 5A WRGM 1WV-3547-1 declared inoperable. |
| DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73'Licensee Event Report (LER), Inci ent Rpt, etc.NOTES:Application for permit renewal filed.DOCKET 05000400 05000400 S RECIPIENT ID CODE/NAME PD2-1 LA BUCKLEY,B INTERNAL: ACRS MICHELSON ACRS WYLIE AEOD/DSP/NAS AEOD/DSP/TPAB DEDRO NRR/DEST/CEB 8H NRR/DEST/ICSB 7 NRR/DEST/MTB 9H NRR/DEST/RSB 8E NRR/DLPQ/HFB 10 NRR/DOEA/EAB 11 NRR/DREP/RPB 10 NUDOCS-ABSTRACT RES TELFORDiJ RES/DSIR/EIB EXTERNAL: EG&G WILLIAMS, S H ST LOBBY WARD NRC PDR NSIC MAYS,G COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 4 4 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD ACRS MOELLER AEOD/DOA AEOD/DSP/ROAB ARM/DCTS/DAB NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/MEB 9H NRR/DEST/PSB 8D NRR/DEST/SGB 8D NRR/DLPQ/QAB 10 NRR/DREP/RAB 10 NRR SIB 9A G 02 RES/DSIR DEPY RGN2 FILE Ol FORD BLDG HOY,A LPDR NSIC HARRIS,J COPIES LTTR ENCL 1 1 2 2 1 1 2 2 1 1 1.0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 j A jA-~A D 8 TOTAL NUMBER OF COPIES REQUIRED: LTTR 46 ENCL 45 Carolina Power&Light Company HARRIS NUCLEAR PROJECT P.0.Box 165 New Hill, North Carolina 27562 SEP 0 8 1988 File Number'SHF/10-13510C Letter Number'HO-880179 (0)U.S.Nuclear Regulatory Commission Attention.'ocument Control Desk Washington, DC 20555 HARRIS NUCLEAR PROJECT UNIT 1 DOCKET NO.50-400 LICENSE NO.NPF-63 SUPPLEMENTAL TO SPECIAL REPORT Gentlemen.'hearon Harris Nuclear Power Plant, Unit No.1, Carolina Power&Light Company, submitted a Special Report on May 2, 1988, in accordance with Technical Specifications 3.3.3.6 and 6.9.2.That report (Attachment 1)concerned an inoperable radiation monitor.This is a supplement to that Special Report providing additional information that was not available at the time of the initial report.Very truly yours, JRJ:vdj R.A.Watson Vice President Harris Nuclear Project Enclosure cc: Mr.W.H.Bradford (NRC-SHNPP)Mr.B.Buckley (NRR)Dr.J.Nelson Grace (NRC-RII)8809150297 S'090S Poli ADOCK 05000400 PDC MEM/HO-8801790/1/OS1 RADIOACTIVE GASEOUS EFFLUENT MONITOR Supplemental Report~Back round: Vent stack 5A wide Range Gas Monitor (WRGM), glWV-3547-1, was declared inoperable under Technical Specification 3.3.3.11, Radioactive Gaseous Effluent Monitoring Instrumentation, on April 12, 1988.Efforts to return the monitor to service within 7 days were unsuccessful due to problems with the low range sample flow transmitter calibration, and the event was reported in a Special Report on May 2, 1988 (Attachment 1).This supplemental report provides additional information about the flow transmitter problem.Su lemental Information.'t was initially thought that the sample flow transmitters were defective since they could not meet the specified tolerance in the calibration procedure (MST-I0377). | | DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE: |
| After repeated attempts to calibrate several spare flow transmitters were unsuccessful, a vendor representative was contacted. | | TITLE: 50.73 'Licensee Event Report (LER), Inci ent Rpt, etc. |
| An engineering representative from Sorrento Electronics, a subsidiary of General Atomics, manufacturer of the'radiation monitoring system, analyzed the sample flow problem and reviewed plant calibration procedures. | | NOTES:Application for permit renewal filed. 05000400 S |
| The Vendor representative recommended changes to the calibration procedure. | | ID RECIPIENT CODE/NAME PD2-1 LA COPIES LTTR ENCL 1 1 ID RECIPIENT CODE/NAME PD2-1 PD COPIES LTTR ENCL 1 1 j |
| The plant calibration procedure was revised incorporating changes recommended by the Vendor, and the sample flow transmitter.was successfully calibrated. | | BUCKLEY,B 1 1 A INTERNAL: ACRS MICHELSON 1 1 ACRS MOELLER 2 2 ACRS WYLIE 1 1 AEOD/DOA 1 1 AEOD/DSP/NAS 1 1 AEOD/DSP/ROAB 2 2 AEOD/DSP/TPAB 1 1 ARM/DCTS/DAB 1 1 DEDRO 1 1 NRR/DEST/ADS 7E 1. 0 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/ICSB 7 1 1 NRR/DEST/MEB 9H 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/PSB 8D 1 1 NRR/DEST/RSB 8E 1 1 NRR/DEST/SGB 8D 1 1 NRR/DLPQ/HFB 10 1 1 NRR/DLPQ/QAB 10 1 1 NRR/DOEA/EAB 11 1 1 NRR/DREP/RAB 10 1 1 NRR/DREP/RPB 10 2 2 NRR SIB 9A 1 1 NUDOCS-ABSTRACT 1 1 G 02 1 1 RES TELFORDiJ 1 1 RES/DSIR DEPY 1 1 RES/DSIR/EIB 1 1 RGN2 FILE Ol 1 1 EXTERNAL: EG&G WILLIAMS,S 4 4 FORD BLDG HOY,A 1 1 H ST LOBBY WARD 1 1 LPDR 1 1 NRC PDR 1 1 NSIC HARRIS,J 1 1 NSIC MAYS,G 1 1 jA-~ |
| The WRGM was restored to operation on August 20, 1988 at 2230.MEM/HO-8801790/2/Osl}} | | A D |
| | 8 TOTAL NUMBER OF COPIES REQUIRED: LTTR 46 ENCL 45 |
| | |
| | Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. 0. Box 165 New Hill, North Carolina 27562 SEP 0 8 1988 File Number'SHF/10-13510C Letter Number'HO-880179 (0) |
| | U.S. Nuclear Regulatory Commission Attention.'ocument Control Desk Washington, DC 20555 HARRIS NUCLEAR PROJECT UNIT 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 SUPPLEMENTAL TO SPECIAL REPORT Gentlemen.'hearon Harris Nuclear Power Plant, Unit No. 1, Carolina Power & |
| | Light Company, submitted a Special Report on May 2, 1988, in accordance with Technical Specifications 3.3.3.6 and 6.9.2. That report (Attachment 1) concerned an inoperable radiation monitor. |
| | This is a supplement to that Special Report providing additional information that was not available at the time of the initial report. |
| | Very truly yours, R. A. Watson Vice President Harris Nuclear Project JRJ:vdj Enclosure cc: Mr. W. H. Bradford (NRC SHNPP) |
| | Mr. B. Buckley (NRR) |
| | Dr. J. Nelson Grace (NRC RII) 8809150297 S '090S Poli ADOCK 05000400 PDC MEM/HO-8801790/1/OS1 |
| | |
| | RADIOACTIVE GASEOUS EFFLUENT MONITOR Supplemental Report |
| | ~Back round: |
| | Vent stack 5A wide Range Gas Monitor (WRGM), glWV-3547-1, was declared inoperable under Technical Specification 3.3.3.11, Radioactive Gaseous Effluent Monitoring Instrumentation, on April 12, 1988. Efforts to return the monitor to service within 7 days were unsuccessful due to problems with the low range sample flow transmitter calibration, and the event was reported in a Special Report on May 2, 1988 (Attachment 1). This supplemental report provides additional information about the flow transmitter problem. |
| | Su lemental Information.'t was initially thought that the sample flow transmitters were defective since they could not meet the specified tolerance in the calibration procedure (MST-I0377). After repeated attempts to calibrate several spare flow transmitters were unsuccessful, a vendor representative was contacted. An engineering representative from Sorrento Electronics, a subsidiary of General Atomics, manufacturer of the 'radiation monitoring system, analyzed the sample flow problem and reviewed plant calibration procedures. The Vendor representative recommended changes to the calibration procedure. |
| | The plant calibration procedure was revised incorporating changes recommended by the Vendor, and the sample flow transmitter .was successfully calibrated. The WRGM was restored to operation on August 20, 1988 at 2230. |
| | MEM/HO-8801790/2/Osl}} |
|
---|
Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO
MONTHYEARML18022B0421998-05-14014 May 1998 Special Rept:On 970719,declared Channel 751 of Digital Metal Impact Monitoring Sys Monitors Inoperable.Caused by Noise Originating in Channel 751 pre-amplifier/accelerometer Sensor Located in Containment.Channel 751 in Containment ML18012A4101996-10-23023 October 1996 Ro:On 960916,fish Kill Occurred in Harris Lake.Caused by Heavy Precipitation That Accompanied Hurricane Fran.Will Perform Monitoring of Dissolved Oxygen Concentrations to Document Return of Sufficient Oxygen to Aquatic Life ML18011B1271996-02-0505 February 1996 Special Rept:On 951105,actuation of ECCS & Subsequent Injection of Water Into RCS Occurred.Unusual Event (Ue) Declared Due to ECCS Actuation & Ue Exited Based on Termination of SI & Stabilization of Plant in Mode-3 ML18022A9751995-10-0505 October 1995 Special Rept,Identifying Number of SG Tubes Plugged as Result of Recent SG Tube ISI Conducted During Refueling Outage 6 ML18011B0091995-09-0505 September 1995 Special Rept:On 950817,WPB Stack 5A WRGM Was Declared Inoperable to Allow for Testing of Associated Stack 5A Exhaust Flow Rate Monitor.Monitor Returned to Svc on 950825 ML18011A2241993-10-27027 October 1993 Special Rept:On 930928,identified That 10 Used Incore Detectors Not Accounted For.Most Probable Disposition Is That Detectors Inadvertently Mixed W/Other LLW Matl & Shipped to Seg in Apr 1993.Procedures FMP-108 & 109 Revised ML18010B1291993-07-12012 July 1993 Special Rept:On 930621,violation of TS 3.3.3.6 Occurred Due to Time Required to Install New Operating System for Inoperable RCS Subcooling Margin Monitor & Pressurizer Safety Valve Position Indication Sys ML18010A6311992-05-0808 May 1992 Special Rept:On 920420,RCS Subcooling Monitor Declared Inoperable to Install New & Improved Disk Drives in ERF Info Sys.Monitor Out of Svc for More than 7 Days.New Disk Drives & Circuit Board Upgrade Completed by Vendor on 920412 ML18010A3671991-08-15015 August 1991 Special Rept:On 910706,seismic Monitoring Sys Declared Inoperable.Caused by Unsatisfactory Surveillance Test Results.Maint Calibration Procedure & Operations Surveillance Test Performed Satisfactorily ML18009A9391991-06-14014 June 1991 Special Rept:On 910528,stack 5 Exhaust Sys Radiation Monitor Declared Inoperable When Monitor Removed from Svc to Perform Test Procedure.Caused by Failed Capacitor.Capacitor Replaced ML18009A9361991-06-14014 June 1991 Special Rept:On 910516,plant Experienced LTOP Event While RCS Operated Under Solid Water Conditions.Actuation of LTOP Sys Resulted from Pressure Induced by Start of Reactor Coolant Pump ML18009A7041990-10-11011 October 1990 Special Rept:On 900922,main Steam Line Radiation Monitor Declared Inoperable Due to Communication Failure ML18022A7541990-01-15015 January 1990 Special Rept:On 891223,reactor Coolant Subcooling Monitor Declared Inoperable Due to Erratic Indications & Out of Svc Beyond 7-day Time Limit in Spec 6.9.2.Caused by Normal End of Life of Data Isolator Board.Board Replaced on 900103 ML18009A3331990-01-0505 January 1990 Special Rept:On 891220,plant Vent High Range Noble Gas Monitor RM-21AV-3509-1SA Declared Inoperable When Monitor Found to Be Out of Calibr During Performance of Test Procedure.Caused by Detector Being Out of Calibr ML18005B1201989-10-13013 October 1989 Special Rept:On 890904,seismic Monitor Sys Declared Inoperable Due to Seismic Annunciator Panel in Main Control Room Had Annunciators Lit for No Apparent Reason.Cause Believed to Be Defective Logic Board.Repairs Made by Vendor ML18005A6051988-09-19019 September 1988 Special Rept:On 880912,first Inservice Insp of Steam Generators Completed,Per Tech Specs 4.4.5.5.a & 6.9.2. Reporting Requirements of IE Bulletin 88-002 Will Be Submitted Under Separate Cover ML18005A5861988-09-0808 September 1988 Suppl to Special Rept:On 880412,vent Stack 5A Wide Range Gas Monitor 1WV-3547-1 Declared Inoperable.Initially Reported on 880502.Plant Calibr Procedure Revised Incorporating Changes Recommended by Vendor & Sample Flow Transmitter Calibr ML18022A6441988-05-0202 May 1988 Special Rept:On 880412,vent Stack 5A wide-range Gas Monitor Declared Inoperable.Caused by Loss of Sample Flow That Would Occur While Attempting Calibr of Sample Flow Transmitter. Correct low-range Flow Transmitter Ordered ML18005A2861988-02-0505 February 1988 Special Rept:On 880118,main Steam Line Radiation Monitor C Failed to Adequately Respond to Routine Source Check.Caused by Source Sticking in Partially Inserted Position.Work Request Initiated to Repair Monitor ML18022A6001988-01-0404 January 1988 Special Rept:On 871102,vent Stack 5A Wide Range Gas Radiation Monitor Inoperable.Caused by Potential Loss of Sample Flow Due to Calibr of Transmitter & iso-kinetic Sampling Skid.Mass Flow Meter Replaced ML18022A6011988-01-0404 January 1988 Special Rept:On 871212,waste Processing Bldg Vent Stack 5 Wide Range Gas Monitor Declared Inoperable in Excess of 7 Days.Caused by Defective photo-multiplier Tube on Low Range Channel.Tube Replaced ML18022A5731987-10-15015 October 1987 Special Rept:On 870924,vent Stack Wide Range Gas Monitor RM-3536-1 Declared Inoperable Due to Loss of Process Control.Caused by Equipment Failure.Flow Sensing Elements Removed & Cleaned to Remove Corrosion ML18004B8551987-06-15015 June 1987 Special Rept:On 870523,turbine Bldg Vent Stack wide-range Gas Monitor RM-35361-1 Declared Inoperable Due to Loss of Process Flow.Caused by Shorted Sensing Element.Element & Current Card Adjusted & Calibr ML18004B7541987-04-0303 April 1987 Special Rept:On 870305,util Notified by Sorrento Electronics of Environ Qualification Problem W/Interconnecting Cable on Digital high-range Radiation Monitors.Caused by Misapplication of Cable by Vendor.Alternate Monitor Used 1998-05-14
[Table view] Category:LER)
MONTHYEARML18022B0421998-05-14014 May 1998 Special Rept:On 970719,declared Channel 751 of Digital Metal Impact Monitoring Sys Monitors Inoperable.Caused by Noise Originating in Channel 751 pre-amplifier/accelerometer Sensor Located in Containment.Channel 751 in Containment ML18012A4101996-10-23023 October 1996 Ro:On 960916,fish Kill Occurred in Harris Lake.Caused by Heavy Precipitation That Accompanied Hurricane Fran.Will Perform Monitoring of Dissolved Oxygen Concentrations to Document Return of Sufficient Oxygen to Aquatic Life ML18011B1271996-02-0505 February 1996 Special Rept:On 951105,actuation of ECCS & Subsequent Injection of Water Into RCS Occurred.Unusual Event (Ue) Declared Due to ECCS Actuation & Ue Exited Based on Termination of SI & Stabilization of Plant in Mode-3 ML18022A9751995-10-0505 October 1995 Special Rept,Identifying Number of SG Tubes Plugged as Result of Recent SG Tube ISI Conducted During Refueling Outage 6 ML18011B0091995-09-0505 September 1995 Special Rept:On 950817,WPB Stack 5A WRGM Was Declared Inoperable to Allow for Testing of Associated Stack 5A Exhaust Flow Rate Monitor.Monitor Returned to Svc on 950825 ML18011A2241993-10-27027 October 1993 Special Rept:On 930928,identified That 10 Used Incore Detectors Not Accounted For.Most Probable Disposition Is That Detectors Inadvertently Mixed W/Other LLW Matl & Shipped to Seg in Apr 1993.Procedures FMP-108 & 109 Revised ML18010B1291993-07-12012 July 1993 Special Rept:On 930621,violation of TS 3.3.3.6 Occurred Due to Time Required to Install New Operating System for Inoperable RCS Subcooling Margin Monitor & Pressurizer Safety Valve Position Indication Sys ML18010A6311992-05-0808 May 1992 Special Rept:On 920420,RCS Subcooling Monitor Declared Inoperable to Install New & Improved Disk Drives in ERF Info Sys.Monitor Out of Svc for More than 7 Days.New Disk Drives & Circuit Board Upgrade Completed by Vendor on 920412 ML18010A3671991-08-15015 August 1991 Special Rept:On 910706,seismic Monitoring Sys Declared Inoperable.Caused by Unsatisfactory Surveillance Test Results.Maint Calibration Procedure & Operations Surveillance Test Performed Satisfactorily ML18009A9391991-06-14014 June 1991 Special Rept:On 910528,stack 5 Exhaust Sys Radiation Monitor Declared Inoperable When Monitor Removed from Svc to Perform Test Procedure.Caused by Failed Capacitor.Capacitor Replaced ML18009A9361991-06-14014 June 1991 Special Rept:On 910516,plant Experienced LTOP Event While RCS Operated Under Solid Water Conditions.Actuation of LTOP Sys Resulted from Pressure Induced by Start of Reactor Coolant Pump ML18009A7041990-10-11011 October 1990 Special Rept:On 900922,main Steam Line Radiation Monitor Declared Inoperable Due to Communication Failure ML18022A7541990-01-15015 January 1990 Special Rept:On 891223,reactor Coolant Subcooling Monitor Declared Inoperable Due to Erratic Indications & Out of Svc Beyond 7-day Time Limit in Spec 6.9.2.Caused by Normal End of Life of Data Isolator Board.Board Replaced on 900103 ML18009A3331990-01-0505 January 1990 Special Rept:On 891220,plant Vent High Range Noble Gas Monitor RM-21AV-3509-1SA Declared Inoperable When Monitor Found to Be Out of Calibr During Performance of Test Procedure.Caused by Detector Being Out of Calibr ML18005B1201989-10-13013 October 1989 Special Rept:On 890904,seismic Monitor Sys Declared Inoperable Due to Seismic Annunciator Panel in Main Control Room Had Annunciators Lit for No Apparent Reason.Cause Believed to Be Defective Logic Board.Repairs Made by Vendor ML18005A6051988-09-19019 September 1988 Special Rept:On 880912,first Inservice Insp of Steam Generators Completed,Per Tech Specs 4.4.5.5.a & 6.9.2. Reporting Requirements of IE Bulletin 88-002 Will Be Submitted Under Separate Cover ML18005A5861988-09-0808 September 1988 Suppl to Special Rept:On 880412,vent Stack 5A Wide Range Gas Monitor 1WV-3547-1 Declared Inoperable.Initially Reported on 880502.Plant Calibr Procedure Revised Incorporating Changes Recommended by Vendor & Sample Flow Transmitter Calibr ML18022A6441988-05-0202 May 1988 Special Rept:On 880412,vent Stack 5A wide-range Gas Monitor Declared Inoperable.Caused by Loss of Sample Flow That Would Occur While Attempting Calibr of Sample Flow Transmitter. Correct low-range Flow Transmitter Ordered ML18005A2861988-02-0505 February 1988 Special Rept:On 880118,main Steam Line Radiation Monitor C Failed to Adequately Respond to Routine Source Check.Caused by Source Sticking in Partially Inserted Position.Work Request Initiated to Repair Monitor ML18022A6001988-01-0404 January 1988 Special Rept:On 871102,vent Stack 5A Wide Range Gas Radiation Monitor Inoperable.Caused by Potential Loss of Sample Flow Due to Calibr of Transmitter & iso-kinetic Sampling Skid.Mass Flow Meter Replaced ML18022A6011988-01-0404 January 1988 Special Rept:On 871212,waste Processing Bldg Vent Stack 5 Wide Range Gas Monitor Declared Inoperable in Excess of 7 Days.Caused by Defective photo-multiplier Tube on Low Range Channel.Tube Replaced ML18022A5731987-10-15015 October 1987 Special Rept:On 870924,vent Stack Wide Range Gas Monitor RM-3536-1 Declared Inoperable Due to Loss of Process Control.Caused by Equipment Failure.Flow Sensing Elements Removed & Cleaned to Remove Corrosion ML18004B8551987-06-15015 June 1987 Special Rept:On 870523,turbine Bldg Vent Stack wide-range Gas Monitor RM-35361-1 Declared Inoperable Due to Loss of Process Flow.Caused by Shorted Sensing Element.Element & Current Card Adjusted & Calibr ML18004B7541987-04-0303 April 1987 Special Rept:On 870305,util Notified by Sorrento Electronics of Environ Qualification Problem W/Interconnecting Cable on Digital high-range Radiation Monitors.Caused by Misapplication of Cable by Vendor.Alternate Monitor Used 1998-05-14
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18017A9181999-10-0808 October 1999 LER 99-008-00:on 991008,CR Emergency Filtration Sys Tech Specs Occurred.Caused by Site Personnel Failed to Recognize That Blocking Open CR Emergency Filtration Sys.Procedures Revised.With 991008 Ltr ML18017A9151999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with 991012 Ltr ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML18017A8671999-09-10010 September 1999 LER 99-007-00:on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With 990910 Ltr ML18017A8621999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With 990908 Ltr ML18016B0481999-08-0404 August 1999 LER 99-006-01:on 981124,noted Failure to Comply with TS 4.0.4 & TS 3/4.6.3, Civs. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Was Revised ML18017A8361999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With 990811 Ltr ML18016B0151999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Shearon Harris Npp. with 990713 Ltr ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18016A9801999-06-0404 June 1999 LER 99-006-00:on 981124,failed to Comply with TS 4.0.4 & TS 3/4.6.3, Civ. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Will Be Revised.With 990604 Ltr ML18016A9851999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990614 Ltr ML18017A8981999-05-12012 May 1999 Technical Rept Entitled, Harris Nuclear Plant-Bacteria Detection in Water from C&D Spent Fuel Pool Cooling Lines. ML18016A9581999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990513 Ltr ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML18016A9111999-04-12012 April 1999 LER 99-005-00:on 990313,plant Exceeded ESFAS TS 3.3.2,Action 21.Caused by Inadequate Procedure Rev Preparation.Licensee Revised Applicable Maint Surveillance Test Procedure (MST-10072) to Identify TS Required Actions.With 990412 Ltr ML18016A8971999-04-0808 April 1999 LER 99-004-00:on 990312,unit Trip Was Noted.Caused by Degraded Condition of SG Water Level Flow Control Valve. Replaced Positioners on All Three FW Regulating Valves.With 990408 Ltr ML18016A8941999-04-0505 April 1999 Revised Pages 20-25 to App 4A of non-proprietary Version of Rev 3 to HI-971760 ML18016A9101999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr ML18016A8661999-03-31031 March 1999 Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept. ML18017A8931999-02-28028 February 1999 Risks & Alternative Options Associated with Spent Fuel Storage at Shearon Harris Nuclear Power Plant. ML18016A8551999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with 990312 Ltr ML18016A8261999-02-22022 February 1999 LER 99-003-00:on 990123,noted That Plant Was Outside Design Basis Due to Isolation of Fire Protection Containment Sprinkler Sys.Caused by Human Error.Restored Containment Sprinkler Sys to Operable Status.With 990222 Ltr ML18016A8531999-02-18018 February 1999 Non-proprietary Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFP 'C' & 'D'. ML18016A8111999-02-12012 February 1999 LER 99-002-00:on 990114,RT Due to Not Removing Temporary Device from Relay Following Calibration Was Noted.Caused by Human Error.Counseled Personnel Involved in Event.With 990212 Ltr ML18016A7971999-02-0505 February 1999 LER 99-001-00:on 990106,SF Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Fasteners Bending Under Specific Circumstances.Increased Water Level.With 990205 Ltr ML18022B0631999-02-0404 February 1999 Rev 0 to Nuclear NDE Manual. with 28 Oversize Uncodable Drawings of Alternative Plan Scope & 4 Oversize Codable Drawings ML20202J1161999-02-0101 February 1999 SER Accepting Relief Requests Associated with Second 10-year Interval Inservice Testing Program ML18016A8041999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With 990211 Ltr ML18016A7941999-01-29029 January 1999 LER 98-004-01:on 980313,identified Design Deficiency Re Potential Runout of Tdafwp.Caused by Inadequate Original AFW Sys Design.Operability Evaluation Was Completed on 980313 & Addl Engineering Analysis Was Performed by Vendor ML18016A7801998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Shearon Harris Npp. with 990113 Ltr ML18016A7671998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With 981215 Ltr ML18016A9731998-11-28028 November 1998 Changes,Tests & Experiments, for Harris Nuclear Plant.Rept Provides Brief Description of Changes to Facility & Summary & of SE for Each Item That Was Implemented Under 10CFR50.59 Between 970608-981128.With 990527 Ltr ML18016A8351998-11-28028 November 1998 ISI Summary 8th Refueling Outage for Shearon Harris Power Plant,Unit 1. ML18016A7411998-11-25025 November 1998 Rev 1 to Shnpp Cycle 9 Colr. ML18016A7211998-11-17017 November 1998 LER 98-007-00:on 981023,turbine Control Anomaly Caused Manual Rt.Caused by Failure to Incorporate Verbal Vendor Guidance in Operating Procedures.Addl Vendor Guidance Will Be Verified & Added to Procedures.With 981117 Ltr ML18016A7071998-11-0303 November 1998 Rev 0 to Harris Unit 1 Cycle 9 Colr. ML18016A7201998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With 981113 Ltr ML20154F8701998-10-0606 October 1998 Safety Evaluation Authorizing Proposed Alternative to Requirements of OMa-1988,Part 10,Section 4.2.2.3 for 21 Category a Reactor Coolant Sys Pressure Isolation Valves ML18016A6201998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With 981012 Ltr ML18016A5971998-09-21021 September 1998 Rev 1 to Harris Unit 1 Cycle 8 Colr. ML18016A5881998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Shnpp,Unit 1.With 980914 Ltr ML18016A5071998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Shearon Harris Nuclear Plant.W/980811 Ltr ML18016A9431998-07-0707 July 1998 Rev 1 to QAP Manual. ML18016A4841998-07-0707 July 1998 LER 97-002-01:on 970207,determined That Cold Weather Conditions Resulted in Mfiv Being Potentially Inoperable During Period 970117-20.Caused by Inadequate Design of HVAC Sys.Implemented Mods to Steam Tunnel HVAC Sys ML18016A9371998-06-30030 June 1998 Technical Rept on Matl Identification of Spent Fuel Piping Welds at Hnp. ML18016A4861998-06-30030 June 1998 Monthly Operating Rept for June 1998 for SHNPP.W/980715 Ltr ML18016A4701998-06-30030 June 1998 LER 97-021-03:on 980210,discovered That SFP Water Level Had Not Been Verified Greater than 23 Feet Above BWR Fuel Assemblies.Caused by Misinterpretation of TS Requirements. Will Submit TS Change Request to Revise TS 3.9.1.11 ML18016A4491998-06-0808 June 1998 LER 98-006-00:on 980508,failure to Perform Insp & Preventive Maint on MCCB as Required by TS Was Noted.Caused by Inadequate Sps.Tested 9 Pressurizer Heater Bank Breakers by Cycling each.W/980608 Ltr ML18016A4521998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Shearon Harris Nuclear Power Plant.W/980612 Ltr ML18016A7711998-05-26026 May 1998 Non-proprietary Rev 2 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris Spent Fuel Pools 'C' & 'D'. 1999-09-30
[Table view] |
Text
AC CELZRATZD DISI'RIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8809150297 DOC.DATE: 88/09/08 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION WATSON,R.A. Carolina Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Suppl to special rept:on 880412,Vent Stack 5A WRGM 1WV-3547-1 declared inoperable.
DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: 50.73 'Licensee Event Report (LER), Inci ent Rpt, etc.
NOTES:Application for permit renewal filed. 05000400 S
ID RECIPIENT CODE/NAME PD2-1 LA COPIES LTTR ENCL 1 1 ID RECIPIENT CODE/NAME PD2-1 PD COPIES LTTR ENCL 1 1 j
BUCKLEY,B 1 1 A INTERNAL: ACRS MICHELSON 1 1 ACRS MOELLER 2 2 ACRS WYLIE 1 1 AEOD/DOA 1 1 AEOD/DSP/NAS 1 1 AEOD/DSP/ROAB 2 2 AEOD/DSP/TPAB 1 1 ARM/DCTS/DAB 1 1 DEDRO 1 1 NRR/DEST/ADS 7E 1. 0 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/ICSB 7 1 1 NRR/DEST/MEB 9H 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/PSB 8D 1 1 NRR/DEST/RSB 8E 1 1 NRR/DEST/SGB 8D 1 1 NRR/DLPQ/HFB 10 1 1 NRR/DLPQ/QAB 10 1 1 NRR/DOEA/EAB 11 1 1 NRR/DREP/RAB 10 1 1 NRR/DREP/RPB 10 2 2 NRR SIB 9A 1 1 NUDOCS-ABSTRACT 1 1 G 02 1 1 RES TELFORDiJ 1 1 RES/DSIR DEPY 1 1 RES/DSIR/EIB 1 1 RGN2 FILE Ol 1 1 EXTERNAL: EG&G WILLIAMS,S 4 4 FORD BLDG HOY,A 1 1 H ST LOBBY WARD 1 1 LPDR 1 1 NRC PDR 1 1 NSIC HARRIS,J 1 1 NSIC MAYS,G 1 1 jA-~
A D
8 TOTAL NUMBER OF COPIES REQUIRED: LTTR 46 ENCL 45
Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. 0. Box 165 New Hill, North Carolina 27562 SEP 0 8 1988 File Number'SHF/10-13510C Letter Number'HO-880179 (0)
U.S. Nuclear Regulatory Commission Attention.'ocument Control Desk Washington, DC 20555 HARRIS NUCLEAR PROJECT UNIT 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 SUPPLEMENTAL TO SPECIAL REPORT Gentlemen.'hearon Harris Nuclear Power Plant, Unit No. 1, Carolina Power &
Light Company, submitted a Special Report on May 2, 1988, in accordance with Technical Specifications 3.3.3.6 and 6.9.2. That report (Attachment 1) concerned an inoperable radiation monitor.
This is a supplement to that Special Report providing additional information that was not available at the time of the initial report.
Very truly yours, R. A. Watson Vice President Harris Nuclear Project JRJ:vdj Enclosure cc: Mr. W. H. Bradford (NRC SHNPP)
Mr. B. Buckley (NRR)
Dr. J. Nelson Grace (NRC RII) 8809150297 S '090S Poli ADOCK 05000400 PDC MEM/HO-8801790/1/OS1
RADIOACTIVE GASEOUS EFFLUENT MONITOR Supplemental Report
~Back round:
Vent stack 5A wide Range Gas Monitor (WRGM), glWV-3547-1, was declared inoperable under Technical Specification 3.3.3.11, Radioactive Gaseous Effluent Monitoring Instrumentation, on April 12, 1988. Efforts to return the monitor to service within 7 days were unsuccessful due to problems with the low range sample flow transmitter calibration, and the event was reported in a Special Report on May 2, 1988 (Attachment 1). This supplemental report provides additional information about the flow transmitter problem.
Su lemental Information.'t was initially thought that the sample flow transmitters were defective since they could not meet the specified tolerance in the calibration procedure (MST-I0377). After repeated attempts to calibrate several spare flow transmitters were unsuccessful, a vendor representative was contacted. An engineering representative from Sorrento Electronics, a subsidiary of General Atomics, manufacturer of the 'radiation monitoring system, analyzed the sample flow problem and reviewed plant calibration procedures. The Vendor representative recommended changes to the calibration procedure.
The plant calibration procedure was revised incorporating changes recommended by the Vendor, and the sample flow transmitter .was successfully calibrated. The WRGM was restored to operation on August 20, 1988 at 2230.
MEM/HO-8801790/2/Osl