{{#Wiki_filter:AC CELZRATZD DISI'RIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8809150297 DOC.DATE: 88/09/08 NOTARIZED:
{{#Wiki_filter:AC CELZRATZD         DISI'RIBUTION       DEMONSTRATION           SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION WATSON,R.A.
ACCESSION NBR:8809150297       DOC.DATE: 88/09/08   NOTARIZED: NO       DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina       05000400 AUTH. NAME         AUTHOR AFFILIATION WATSON,R.A.       Carolina Power & Light Co.
Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
RECIP.NAME         RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Suppl to special rept:on 880412,Vent Stack 5A WRGM 1WV-3547-1 declared inoperable.
Suppl to special rept:on 880412,Vent Stack 5A WRGM 1WV-3547-1 declared inoperable.
DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73'Licensee Event Report (LER), Inci ent Rpt, etc.NOTES:Application for permit renewal filed.DOCKET 05000400 05000400 S RECIPIENT ID CODE/NAME PD2-1 LA BUCKLEY,B INTERNAL: ACRS MICHELSON ACRS WYLIE AEOD/DSP/NAS AEOD/DSP/TPAB DEDRO NRR/DEST/CEB 8H NRR/DEST/ICSB 7 NRR/DEST/MTB 9H NRR/DEST/RSB 8E NRR/DLPQ/HFB 10 NRR/DOEA/EAB 11 NRR/DREP/RPB 10 NUDOCS-ABSTRACT RES TELFORDiJ RES/DSIR/EIB EXTERNAL: EG&G WILLIAMS, S H ST LOBBY WARD NRC PDR NSIC MAYS,G COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 4 4 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD ACRS MOELLER AEOD/DOA AEOD/DSP/ROAB ARM/DCTS/DAB NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/MEB 9H NRR/DEST/PSB 8D NRR/DEST/SGB 8D NRR/DLPQ/QAB 10 NRR/DREP/RAB 10 NRR SIB 9A G 02 RES/DSIR DEPY RGN2 FILE Ol FORD BLDG HOY,A LPDR NSIC HARRIS,J COPIES LTTR ENCL 1 1 2 2 1 1 2 2 1 1 1.0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 j A jA-~A D 8 TOTAL NUMBER OF COPIES REQUIRED: LTTR 46 ENCL 45 Carolina Power&Light Company HARRIS NUCLEAR PROJECT P.0.Box 165 New Hill, North Carolina 27562 SEP 0 8 1988 File Number'SHF/10-13510C Letter Number'HO-880179 (0)U.S.Nuclear Regulatory Commission Attention.'ocument Control Desk Washington, DC 20555 HARRIS NUCLEAR PROJECT UNIT 1 DOCKET NO.50-400 LICENSE NO.NPF-63 SUPPLEMENTAL TO SPECIAL REPORT Gentlemen.'hearon Harris Nuclear Power Plant, Unit No.1, Carolina Power&Light Company, submitted a Special Report on May 2, 1988, in accordance with Technical Specifications 3.3.3.6 and 6.9.2.That report (Attachment 1)concerned an inoperable radiation monitor.This is a supplement to that Special Report providing additional information that was not available at the time of the initial report.Very truly yours, JRJ:vdj R.A.Watson Vice President Harris Nuclear Project Enclosure cc: Mr.W.H.Bradford (NRC-SHNPP)Mr.B.Buckley (NRR)Dr.J.Nelson Grace (NRC-RII)8809150297 S'090S Poli ADOCK 05000400 PDC MEM/HO-8801790/1/OS1 RADIOACTIVE GASEOUS EFFLUENT MONITOR Supplemental Report~Back round: Vent stack 5A wide Range Gas Monitor (WRGM), glWV-3547-1, was declared inoperable under Technical Specification 3.3.3.11, Radioactive Gaseous Effluent Monitoring Instrumentation, on April 12, 1988.Efforts to return the monitor to service within 7 days were unsuccessful due to problems with the low range sample flow transmitter calibration, and the event was reported in a Special Report on May 2, 1988 (Attachment 1).This supplemental report provides additional information about the flow transmitter problem.Su lemental Information.'t was initially thought that the sample flow transmitters were defective since they could not meet the specified tolerance in the calibration procedure (MST-I0377).
DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR           ENCL   SIZE:
After repeated attempts to calibrate several spare flow transmitters were unsuccessful, a vendor representative was contacted.
TITLE: 50.73 'Licensee Event Report (LER), Inci ent Rpt, etc.
An engineering representative from Sorrento Electronics, a subsidiary of General Atomics, manufacturer of the'radiation monitoring system, analyzed the sample flow problem and reviewed plant calibration procedures.
NOTES:Application for permit renewal filed.                             05000400 S
The Vendor representative recommended changes to the calibration procedure.
ID RECIPIENT CODE/NAME PD2-1 LA COPIES LTTR ENCL 1    1 ID RECIPIENT CODE/NAME PD2-1 PD COPIES LTTR ENCL 1    1 j
The plant calibration procedure was revised incorporating changes recommended by the Vendor, and the sample flow transmitter.was successfully calibrated.
BUCKLEY,B             1    1                                            A INTERNAL: ACRS MICHELSON         1    1    ACRS MOELLER          2    2 ACRS WYLIE           1    1    AEOD/DOA              1    1 AEOD/DSP/NAS         1    1    AEOD/DSP/ROAB        2    2 AEOD/DSP/TPAB         1    1    ARM/DCTS/DAB          1    1 DEDRO                 1    1    NRR/DEST/ADS    7E    1. 0 NRR/DEST/CEB 8H      1    1    NRR/DEST/ESB    8D    1    1 NRR/DEST/ICSB 7      1    1    NRR/DEST/MEB    9H    1     1 NRR/DEST/MTB 9H      1    1    NRR/DEST/PSB    8D   1    1 NRR/DEST/RSB 8E      1    1    NRR/DEST/SGB    8D   1    1 NRR/DLPQ/HFB 10      1    1    NRR/DLPQ/QAB   10   1    1 NRR/DOEA/EAB 11      1    1    NRR/DREP/RAB   10   1    1 NRR/DREP/RPB 10      2     2   NRR        SIB 9A    1     1 NUDOCS-ABSTRACT      1     1       G            02    1     1 RES  TELFORDiJ        1     1   RES/DSIR DEPY        1     1 RES/DSIR/EIB          1     1   RGN2    FILE  Ol    1     1 EXTERNAL: EG&G WILLIAMS,S        4    4    FORD BLDG HOY,A      1     1 H ST LOBBY WARD      1     1   LPDR                  1     1 NRC PDR              1     1   NSIC HARRIS,J        1     1 NSIC MAYS,G          1     1 jA-~
The WRGM was restored to operation on August 20, 1988 at 2230.MEM/HO-8801790/2/Osl}}
A D
8 TOTAL NUMBER OF COPIES REQUIRED: LTTR       46   ENCL   45
 
Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. 0. Box 165 New Hill, North     Carolina     27562 SEP 0 8 1988 File Number'SHF/10-13510C Letter Number'HO-880179 (0)
U.S. Nuclear Regulatory Commission Attention.'ocument Control                 Desk Washington,           DC 20555 HARRIS NUCLEAR PROJECT UNIT 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 SUPPLEMENTAL TO SPECIAL REPORT Gentlemen.'hearon Harris Nuclear   Power Plant, Unit No. 1, Carolina Power &
Light             Company, submitted a Special Report on May 2, 1988, in accordance with Technical Specifications 3.3.3.6 and 6.9.2. That report (Attachment 1) concerned an inoperable radiation monitor.
This is a supplement to that Special Report providing additional information that was not available at the time of the initial report.
Very   truly yours, R. A. Watson Vice President Harris Nuclear Project JRJ:vdj Enclosure cc:         Mr. W. H. Bradford (NRC SHNPP)
Mr. B. Buckley (NRR)
Dr. J. Nelson Grace (NRC RII) 8809150297 S '090S Poli ADOCK 05000400 PDC MEM/HO-8801790/1/OS1
 
RADIOACTIVE GASEOUS EFFLUENT MONITOR Supplemental Report
~Back round:
Vent stack     5A               wide Range   Gas Monitor (WRGM), glWV-3547-1, was declared     inoperable               under   Technical Specification 3.3.3.11, Radioactive Gaseous                   Effluent Monitoring Instrumentation, on April 12, 1988. Efforts to return the monitor to service within 7 days were unsuccessful due to problems with the low range sample flow transmitter calibration, and the event was reported in a Special Report on May 2, 1988 (Attachment 1). This supplemental report provides additional information about the flow transmitter problem.
Su   lemental   Information.'t was initially thought that the sample flow transmitters were defective since they could not meet the specified tolerance in the calibration procedure (MST-I0377). After repeated attempts to calibrate several spare flow transmitters were unsuccessful, a vendor     representative                 was   contacted.     An engineering representative from Sorrento Electronics, a subsidiary of General Atomics, manufacturer of the 'radiation monitoring system, analyzed the   sample                 flow problem and reviewed plant calibration procedures.           The Vendor representative recommended changes to the calibration procedure.
The plant calibration procedure was revised incorporating changes recommended by the Vendor, and the sample flow transmitter .was successfully calibrated.                   The WRGM was restored to operation on August 20, 1988 at 2230.
MEM/HO-8801790/2/Osl}}

Latest revision as of 05:54, 22 October 2019

Suppl to Special Rept:On 880412,vent Stack 5A Wide Range Gas Monitor 1WV-3547-1 Declared Inoperable.Initially Reported on 880502.Plant Calibr Procedure Revised Incorporating Changes Recommended by Vendor & Sample Flow Transmitter Calibr
ML18005A586
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/08/1988
From: Watson R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
HO-880179-(O), NUDOCS 8809150297
Download: ML18005A586 (3)


Text

AC CELZRATZD DISI'RIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8809150297 DOC.DATE: 88/09/08 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION WATSON,R.A. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Suppl to special rept:on 880412,Vent Stack 5A WRGM 1WV-3547-1 declared inoperable.

DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73 'Licensee Event Report (LER), Inci ent Rpt, etc.

NOTES:Application for permit renewal filed. 05000400 S

ID RECIPIENT CODE/NAME PD2-1 LA COPIES LTTR ENCL 1 1 ID RECIPIENT CODE/NAME PD2-1 PD COPIES LTTR ENCL 1 1 j

BUCKLEY,B 1 1 A INTERNAL: ACRS MICHELSON 1 1 ACRS MOELLER 2 2 ACRS WYLIE 1 1 AEOD/DOA 1 1 AEOD/DSP/NAS 1 1 AEOD/DSP/ROAB 2 2 AEOD/DSP/TPAB 1 1 ARM/DCTS/DAB 1 1 DEDRO 1 1 NRR/DEST/ADS 7E 1. 0 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/ICSB 7 1 1 NRR/DEST/MEB 9H 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/PSB 8D 1 1 NRR/DEST/RSB 8E 1 1 NRR/DEST/SGB 8D 1 1 NRR/DLPQ/HFB 10 1 1 NRR/DLPQ/QAB 10 1 1 NRR/DOEA/EAB 11 1 1 NRR/DREP/RAB 10 1 1 NRR/DREP/RPB 10 2 2 NRR SIB 9A 1 1 NUDOCS-ABSTRACT 1 1 G 02 1 1 RES TELFORDiJ 1 1 RES/DSIR DEPY 1 1 RES/DSIR/EIB 1 1 RGN2 FILE Ol 1 1 EXTERNAL: EG&G WILLIAMS,S 4 4 FORD BLDG HOY,A 1 1 H ST LOBBY WARD 1 1 LPDR 1 1 NRC PDR 1 1 NSIC HARRIS,J 1 1 NSIC MAYS,G 1 1 jA-~

A D

8 TOTAL NUMBER OF COPIES REQUIRED: LTTR 46 ENCL 45

Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. 0. Box 165 New Hill, North Carolina 27562 SEP 0 8 1988 File Number'SHF/10-13510C Letter Number'HO-880179 (0)

U.S. Nuclear Regulatory Commission Attention.'ocument Control Desk Washington, DC 20555 HARRIS NUCLEAR PROJECT UNIT 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 SUPPLEMENTAL TO SPECIAL REPORT Gentlemen.'hearon Harris Nuclear Power Plant, Unit No. 1, Carolina Power &

Light Company, submitted a Special Report on May 2, 1988, in accordance with Technical Specifications 3.3.3.6 and 6.9.2. That report (Attachment 1) concerned an inoperable radiation monitor.

This is a supplement to that Special Report providing additional information that was not available at the time of the initial report.

Very truly yours, R. A. Watson Vice President Harris Nuclear Project JRJ:vdj Enclosure cc: Mr. W. H. Bradford (NRC SHNPP)

Mr. B. Buckley (NRR)

Dr. J. Nelson Grace (NRC RII) 8809150297 S '090S Poli ADOCK 05000400 PDC MEM/HO-8801790/1/OS1

RADIOACTIVE GASEOUS EFFLUENT MONITOR Supplemental Report

~Back round:

Vent stack 5A wide Range Gas Monitor (WRGM), glWV-3547-1, was declared inoperable under Technical Specification 3.3.3.11, Radioactive Gaseous Effluent Monitoring Instrumentation, on April 12, 1988. Efforts to return the monitor to service within 7 days were unsuccessful due to problems with the low range sample flow transmitter calibration, and the event was reported in a Special Report on May 2, 1988 (Attachment 1). This supplemental report provides additional information about the flow transmitter problem.

Su lemental Information.'t was initially thought that the sample flow transmitters were defective since they could not meet the specified tolerance in the calibration procedure (MST-I0377). After repeated attempts to calibrate several spare flow transmitters were unsuccessful, a vendor representative was contacted. An engineering representative from Sorrento Electronics, a subsidiary of General Atomics, manufacturer of the 'radiation monitoring system, analyzed the sample flow problem and reviewed plant calibration procedures. The Vendor representative recommended changes to the calibration procedure.

The plant calibration procedure was revised incorporating changes recommended by the Vendor, and the sample flow transmitter .was successfully calibrated. The WRGM was restored to operation on August 20, 1988 at 2230.

MEM/HO-8801790/2/Osl