ML18037A287: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/10/1980
| issue date = 09/10/1980
| title = Forwards LER 80-019/04T-0
| title = Forwards LER 80-019/04T-0
| author name = BARTLETT J
| author name = Bartlett J
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
| addressee name = GRIER B H
| addressee name = Grier B
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000220
| docket = 05000220
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:Ie NMP-2506 NIAGARA MOHAWK POWER CORPORATION/300 ERIE BOULEVARD WEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-I511 September    10, 1980 Mr. Boyce H. Grier, Director United States Nuclear Regulatory Commis s ion - Region I 631 Park Avenue King of Prussia, Pennsylvania        19406 Re:  Docket No. 50-220 LER 80-19
==Dear Mr. Grier:==
In accordance with Nine Mile Point Nuclear Station Unit $P1 Technical Specification, we hereby submit the following Licensee Event Report in accordance with Section 6.9.2a(6), Personnel error or procedural inadequacy which prevents or could prevent, by itself, the fulfillment of the functional requirements of systems required to cope with accidents analyzed in the FSAR.
This report was completed in the format designated            in NUREG-0161, dated July 1977.
Very  truly yours, NIAGARA MOHAWK POWER CORPORATION James  Bartlett Executive Vice President Attachments (3 copies) xc:  Director, Office of I6E (30 copies)
Director, Office of MIPC (3 copies)}}

Latest revision as of 23:07, 21 October 2019

Forwards LER 80-019/04T-0
ML18037A287
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/10/1980
From: Bartlett J
NIAGARA MOHAWK POWER CORP.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18037A288 List:
References
NMP-2506, NUDOCS 8009180268
Download: ML18037A287 (2)


Text

Ie NMP-2506 NIAGARA MOHAWK POWER CORPORATION/300 ERIE BOULEVARD WEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-I511 September 10, 1980 Mr. Boyce H. Grier, Director United States Nuclear Regulatory Commis s ion - Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Re: Docket No. 50-220 LER 80-19

Dear Mr. Grier:

In accordance with Nine Mile Point Nuclear Station Unit $P1 Technical Specification, we hereby submit the following Licensee Event Report in accordance with Section 6.9.2a(6), Personnel error or procedural inadequacy which prevents or could prevent, by itself, the fulfillment of the functional requirements of systems required to cope with accidents analyzed in the FSAR.

This report was completed in the format designated in NUREG-0161, dated July 1977.

Very truly yours, NIAGARA MOHAWK POWER CORPORATION James Bartlett Executive Vice President Attachments (3 copies) xc: Director, Office of I6E (30 copies)

Director, Office of MIPC (3 copies)