| issue date = 07/31/1996
| issue date = 07/31/1996
| title = Operating Data Rept for July 1996 for Palisades
| title = Operating Data Rept for July 1996 for Palisades
| author name = KOBIATA K A
| author name = Kobiata K
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name =  
| addressee name =  
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:I *m rwar:-:m*m
{{#Wiki_filter:I *m rwar:-:m*m
* rm *OPERATING*
* rm OPERATING DATA REPORT DOCKET NO      50-255 DATE    07-02-96 COMPLETED BY  KAKobiata TELEPHONE  (616)764-2572
STATUS: 1. UNIT NAME 2. REPORTING PERIOD: 3. LICENSED THERMAL POWER (MWt) 4. NAMEPLATE RATING (GROSS MWe) 5. .DESIGN ELECTRICAL RATING (NET MWe) 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) OPERATING DATA REPORT Palisades 960601-960630 2530 811. 7 805 **770 **730 DOCKET NO 50-255 DATE 07-02-96 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 NOTES: 8. IF CHANGES OCCu"R Ii"i*CAPCITY RATINGS (ITEM NU"rlBERS 3 THROUGH 7At:O 7) SINCE LAST REPORT, GIVE REASONS: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe) : 10. REASONS FOR RESTRICTIONS, IF ANY: 11. HOURS IN REPORTING PERIOD 12. NUMBER OF HOURS REACTOR WAS CRITICAL 13. REACTOR RESERVE SHUTDOWN HOURS 14. HOURS GENERATOR ON:LINE 15. UNIT !IBSERVE SHUTDOwN HOURS 16. GROSS THERMAL ENERGY GENERATED (MWH) 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 18. NET ELECTRICAL ENERGY GENERATE;D
    *OPERATING* STATUS:
{MWH) 19. UNIT SERVICE FACTOR 20. UNIT AVA*ILABILITY FACTOR 21. UNIT CAPAC,ITY FACTOR (USING MDC NET) 22. UNIT CAPACITY FACTOR* ('JS!NG DER.NET) 23. UNIT FORCED OUTAGE RATE This Month. 744.0 705.7 688.5 1694i85.4*
NOTES:
525724 499739' 92.5% 92.5% 91.8% 83 .. 3., 7.5% 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): A 51 refueling outage is scheduled to begin on November 2, 1996. 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
: 1. UNIT NAME                                                                 Palisades
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure
: 2. REPORTING PERIOD:                                                  960601-960630
* Weighted Average (635 MWe used as MDC Net prior to October 1985) 9608210229 960813 PDR ADOCK 05000255 R 'PDR Yr-to-Date 5111. 0 4752.0 4726 .1 11699187.6 3752428 3568496 92.5% 92.5% 95.6%' 86'.'7' 7.5% Forecast cumulative 215798.0 125703.3 120880.8 265817878.1 84228682 79521915 . 56.0% 56.0% 54.2%* :45. 8%* 28. 1'r Achieved ! I i}}
: 3. LICENSED THERMAL POWER (MWt)                                                   2530                                                  !
4.
5.
NAMEPLATE RATING (GROSS MWe)
      .DESIGN ELECTRICAL RATING (NET MWe) 811. 7 805 I
i
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)                                       **770
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe)                                         **730
: 8. IF CHANGES OCCu"R Ii"i*CAPCITY RATINGS (ITEM NU"rlBERS 3 THROUGH 7At:O 7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe) :
: 10. REASONS FOR RESTRICTIONS, IF ANY:
This Month.        Yr-to-Date                cumulative
: 11. HOURS IN REPORTING PERIOD                                                       744.0            5111. 0                  215798.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                                           705.7            4752.0                  125703.3
: 13. REACTOR RESERVE SHUTDOWN HOURS
: 14. HOURS GENERATOR ON:LINE                                                         688.5            4726 .1                  120880.8
: 15. UNIT !IBSERVE SHUTDOwN HOURS
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                                       1694i85.4*        11699187.6                265817878.1
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                       525724          3752428                  84228682
: 18. NET ELECTRICAL ENERGY GENERATE;D {MWH)                                       499739'          3568496                  79521915 .
: 19. UNIT SERVICE FACTOR                                                             92.5%            92.5%                      56.0%
: 20. UNIT AVA*ILABILITY FACTOR                                                       92.5%            92.5%                      56.0%
: 21. UNIT CAPAC,ITY FACTOR (USING MDC NET)                                           91.8%            95.6%'                      54.2%*
: 22. UNIT CAPACITY FACTOR* ('JS!NG DER.NET)                                           83.. 3.,          86'.'7'                    :45. 8%*
: 23. UNIT FORCED OUTAGE RATE                                                          7.5%               7.5%                     28. 1'r
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
A 51 da~ refueling outage is scheduled to begin on November 2, 1996.
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast                    Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure
* Weighted Average (635 MWe used as MDC Net prior to October 1985) 9608210229 960813 PDR ADOCK 05000255 R                           'PDR}}

Latest revision as of 16:57, 21 October 2019

Operating Data Rept for July 1996 for Palisades
ML18065A869
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/31/1996
From: Kobiata K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18065A868 List:
References
NUDOCS 9608210229
Download: ML18065A869 (1)


Text

I *m rwar:-:m*m

  • rm OPERATING DATA REPORT DOCKET NO 50-255 DATE 07-02-96 COMPLETED BY KAKobiata TELEPHONE (616)764-2572
  • OPERATING* STATUS:

NOTES:

1. UNIT NAME Palisades
2. REPORTING PERIOD: 960601-960630
3. LICENSED THERMAL POWER (MWt) 2530  !

4.

5.

NAMEPLATE RATING (GROSS MWe)

.DESIGN ELECTRICAL RATING (NET MWe) 811. 7 805 I

i

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
8. IF CHANGES OCCu"R Ii"i*CAPCITY RATINGS (ITEM NU"rlBERS 3 THROUGH 7At:O 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe) :
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month. Yr-to-Date cumulative

11. HOURS IN REPORTING PERIOD 744.0 5111. 0 215798.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 705.7 4752.0 125703.3
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON:LINE 688.5 4726 .1 120880.8
15. UNIT !IBSERVE SHUTDOwN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH) 1694i85.4* 11699187.6 265817878.1
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 525724 3752428 84228682
18. NET ELECTRICAL ENERGY GENERATE;D {MWH) 499739' 3568496 79521915 .
19. UNIT SERVICE FACTOR 92.5% 92.5% 56.0%
20. UNIT AVA*ILABILITY FACTOR 92.5% 92.5% 56.0%
21. UNIT CAPAC,ITY FACTOR (USING MDC NET) 91.8% 95.6%' 54.2%*
22. UNIT CAPACITY FACTOR* ('JS!NG DER.NET) 83.. 3., 86'.'7' :45. 8%*
23. UNIT FORCED OUTAGE RATE 7.5% 7.5% 28. 1'r
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

A 51 da~ refueling outage is scheduled to begin on November 2, 1996.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure

  • Weighted Average (635 MWe used as MDC Net prior to October 1985) 9608210229 960813 PDR ADOCK 05000255 R 'PDR