ML18065A869: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 07/31/1996 | | issue date = 07/31/1996 | ||
| title = Operating Data Rept for July 1996 for Palisades | | title = Operating Data Rept for July 1996 for Palisades | ||
| author name = | | author name = Kobiata K | ||
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | | author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | ||
| addressee name = | | addressee name = | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:I *m rwar:-:m*m | {{#Wiki_filter:I *m rwar:-:m*m | ||
* rm *OPERATING* | * rm OPERATING DATA REPORT DOCKET NO 50-255 DATE 07-02-96 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 | ||
*OPERATING* STATUS: | |||
{MWH) 19. UNIT SERVICE FACTOR 20. UNIT AVA*ILABILITY FACTOR 21. UNIT CAPAC,ITY FACTOR (USING MDC NET) 22. UNIT CAPACITY FACTOR* ('JS!NG DER.NET) | NOTES: | ||
: 1. UNIT NAME Palisades | |||
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure | : 2. REPORTING PERIOD: 960601-960630 | ||
* Weighted Average (635 MWe used as MDC Net prior to October 1985) 9608210229 960813 PDR ADOCK 05000255 R 'PDR | : 3. LICENSED THERMAL POWER (MWt) 2530 ! | ||
4. | |||
5. | |||
NAMEPLATE RATING (GROSS MWe) | |||
.DESIGN ELECTRICAL RATING (NET MWe) 811. 7 805 I | |||
i | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730 | |||
: 8. IF CHANGES OCCu"R Ii"i*CAPCITY RATINGS (ITEM NU"rlBERS 3 THROUGH 7At:O 7) SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe) : | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | |||
This Month. Yr-to-Date cumulative | |||
: 11. HOURS IN REPORTING PERIOD 744.0 5111. 0 215798.0 | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 705.7 4752.0 125703.3 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS | |||
: 14. HOURS GENERATOR ON:LINE 688.5 4726 .1 120880.8 | |||
: 15. UNIT !IBSERVE SHUTDOwN HOURS | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1694i85.4* 11699187.6 265817878.1 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 525724 3752428 84228682 | |||
: 18. NET ELECTRICAL ENERGY GENERATE;D {MWH) 499739' 3568496 79521915 . | |||
: 19. UNIT SERVICE FACTOR 92.5% 92.5% 56.0% | |||
: 20. UNIT AVA*ILABILITY FACTOR 92.5% 92.5% 56.0% | |||
: 21. UNIT CAPAC,ITY FACTOR (USING MDC NET) 91.8% 95.6%' 54.2%* | |||
: 22. UNIT CAPACITY FACTOR* ('JS!NG DER.NET) 83.. 3., 86'.'7' :45. 8%* | |||
: 23. UNIT FORCED OUTAGE RATE 7.5% 7.5% 28. 1'r | |||
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): | |||
A 51 da~ refueling outage is scheduled to begin on November 2, 1996. | |||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | |||
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure | |||
* Weighted Average (635 MWe used as MDC Net prior to October 1985) 9608210229 960813 PDR ADOCK 05000255 R 'PDR}} |
Latest revision as of 16:57, 21 October 2019
ML18065A869 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 07/31/1996 |
From: | Kobiata K CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | |
Shared Package | |
ML18065A868 | List: |
References | |
NUDOCS 9608210229 | |
Download: ML18065A869 (1) | |
Text
I *m rwar:-:m*m
- rm OPERATING DATA REPORT DOCKET NO 50-255 DATE 07-02-96 COMPLETED BY KAKobiata TELEPHONE (616)764-2572
- OPERATING* STATUS:
NOTES:
- 1. UNIT NAME Palisades
- 2. REPORTING PERIOD: 960601-960630
- 3. LICENSED THERMAL POWER (MWt) 2530 !
4.
5.
NAMEPLATE RATING (GROSS MWe)
.DESIGN ELECTRICAL RATING (NET MWe) 811. 7 805 I
i
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
- 8. IF CHANGES OCCu"R Ii"i*CAPCITY RATINGS (ITEM NU"rlBERS 3 THROUGH 7At:O 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe) :
- 10. REASONS FOR RESTRICTIONS, IF ANY:
This Month. Yr-to-Date cumulative
- 11. HOURS IN REPORTING PERIOD 744.0 5111. 0 215798.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 705.7 4752.0 125703.3
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON:LINE 688.5 4726 .1 120880.8
- 15. UNIT !IBSERVE SHUTDOwN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1694i85.4* 11699187.6 265817878.1
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 525724 3752428 84228682
- 18. NET ELECTRICAL ENERGY GENERATE;D {MWH) 499739' 3568496 79521915 .
- 19. UNIT SERVICE FACTOR 92.5% 92.5% 56.0%
- 20. UNIT AVA*ILABILITY FACTOR 92.5% 92.5% 56.0%
- 21. UNIT CAPAC,ITY FACTOR (USING MDC NET) 91.8% 95.6%' 54.2%*
- 22. UNIT CAPACITY FACTOR* ('JS!NG DER.NET) 83.. 3., 86'.'7' :45. 8%*
- 23. UNIT FORCED OUTAGE RATE 7.5% 7.5% 28. 1'r
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
A 51 da~ refueling outage is scheduled to begin on November 2, 1996.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure