ML18066A235: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REPORT MONTH FEBRUARY 1998 -Revised No. Date Type1 Duration Reason 2 (Hours) 1. 02/06/98 s 69.3 B 1. F: Forced S: Scheduled
{{#Wiki_filter:' L REPORT MONTH     FEBRUARY 1998 - Revised                                                                                                             DOCKET NO      50-255 UNIT      Palisades DATE    07/08198 COMPLETED BY  RFSchmidt TELEPHONE  616-764-2185 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date       Type1     Duration       Reason 2 Method of        Licensee      System          Component    Cause & Corrective (Hours)                 Shutting        Event        Code 4          Code 5              Action to Down Reactor3    Report#                                    Prevent Recurrence
: 2. Reason: A-Equipment Failure (Explain)
: 1.     02/06/98   s         69.3           B                                                                     Primary Coolant Pump Motor Oil refill, leak inspect
B-Maintenance or Test C-Refueling 0-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
: 1.               2.                                3.                        4.                            5.
H-Other (Explain)
F: Forced       Reason:                          Method:                    Exhibit G - Instructions      Exhibit I - Same Source S: Scheduled   A-Equipment Failure (Explain)     1-Manual                  for Preparation of Data B-Maintenance or Test             2-Manual Scram            Entry Sheets for Licensee C-Refueling                       3-Automatic Scram          Event Report (LER) File 0-Regulatory Restriction         4-0ther (Explain)          (NUREG-0161)
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Shutting Down Reactor3 3. Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
Licensee Event Report# 4. System Code 4 Component Code 5 Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
H-Other (Explain)}}
: 5. Cause & Corrective Action to Prevent Recurrence Primary Coolant Pump Motor Oil refill, leak inspect Exhibit I -Same Source ' L DOCKET NO 50-255 UNIT Palisades DATE 07/08198 COMPLETED BY RFSchmidt TELEPHONE 616-764-2185}}

Latest revision as of 16:49, 21 October 2019

Revised MOR for Feb 1998 for Palisades Nuclear Plant
ML18066A235
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/28/1998
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18066A230 List:
References
NUDOCS 9807150173
Download: ML18066A235 (1)


Text

' L REPORT MONTH FEBRUARY 1998 - Revised DOCKET NO 50-255 UNIT Palisades DATE 07/08198 COMPLETED BY RFSchmidt TELEPHONE 616-764-2185 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type1 Duration Reason 2 Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Code 4 Code 5 Action to Down Reactor3 Report# Prevent Recurrence

1. 02/06/98 s 69.3 B Primary Coolant Pump Motor Oil refill, leak inspect
1. 2. 3. 4. 5.

F: Forced Reason: Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File 0-Regulatory Restriction 4-0ther (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)