ML18066A235: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REPORT MONTH FEBRUARY 1998 -Revised No. Date Type1 Duration Reason 2 (Hours) 1. 02/06/98 s 69.3 B 1. F: Forced S: Scheduled  
{{#Wiki_filter:' L REPORT MONTH     FEBRUARY 1998 - Revised                                                                                                             DOCKET NO      50-255 UNIT      Palisades DATE    07/08198 COMPLETED BY  RFSchmidt TELEPHONE  616-764-2185 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date       Type1     Duration       Reason 2 Method of        Licensee      System          Component    Cause & Corrective (Hours)                 Shutting        Event        Code 4          Code 5              Action to Down Reactor3    Report#                                    Prevent Recurrence
: 2. Reason: A-Equipment Failure (Explain)
: 1.     02/06/98   s         69.3           B                                                                     Primary Coolant Pump Motor Oil refill, leak inspect
B-Maintenance or Test C-Refueling 0-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
: 1.               2.                                3.                        4.                            5.
H-Other (Explain)
F: Forced       Reason:                          Method:                    Exhibit G - Instructions      Exhibit I - Same Source S: Scheduled   A-Equipment Failure (Explain)     1-Manual                  for Preparation of Data B-Maintenance or Test             2-Manual Scram            Entry Sheets for Licensee C-Refueling                       3-Automatic Scram          Event Report (LER) File 0-Regulatory Restriction         4-0ther (Explain)          (NUREG-0161)
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Shutting Down Reactor3 3. Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
Licensee Event Report# 4. System Code 4 Component Code 5 Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
H-Other (Explain)}}
: 5. Cause & Corrective Action to Prevent Recurrence Primary Coolant Pump Motor Oil refill, leak inspect Exhibit I -Same Source ' L DOCKET NO 50-255 UNIT Palisades DATE 07/08198 COMPLETED BY RFSchmidt TELEPHONE 616-764-2185}}

Latest revision as of 16:49, 21 October 2019

Revised MOR for Feb 1998 for Palisades Nuclear Plant
ML18066A235
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/28/1998
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18066A230 List:
References
NUDOCS 9807150173
Download: ML18066A235 (1)


Text

' L REPORT MONTH FEBRUARY 1998 - Revised DOCKET NO 50-255 UNIT Palisades DATE 07/08198 COMPLETED BY RFSchmidt TELEPHONE 616-764-2185 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type1 Duration Reason 2 Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Code 4 Code 5 Action to Down Reactor3 Report# Prevent Recurrence

1. 02/06/98 s 69.3 B Primary Coolant Pump Motor Oil refill, leak inspect
1. 2. 3. 4. 5.

F: Forced Reason: Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File 0-Regulatory Restriction 4-0ther (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)