OF OPERATING EXPERIENCE FOR OCTOBER 1997 The Unit began the month offline, continuing the forced outage. Following the repair on the primary coolant pump leakoff line, the reactor went critical on October 15 at 1300 hours. The Unit went online October 15 at 2339 hours. The Unit reached 80 percent power while repairs were made on a heater drain pump. Repairs were made and the power escalation resumed on October 21. The Unit was at full power on October 22. 9711130014 971104 PDR ADOCK 05000255 R PDR
OF OPERATING EXPERIENCE FOR OCTOBER 1997 The Unit began the month offline, continuing the forced outage. Following the repair on the primary coolant pump leakoff line, the reactor went critical on October 15 at 1300 hours. The Unit went online October 15 at 2339 hours. The Unit reached 80 percent power while repairs were made on a heater drain pump. Repairs were made and the power escalation resumed on October 21. The Unit was at full power on October 22.
') AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT ealisades DATE 11 l04l9Z COMPLETED BY KAKobiata MONTH October TELEPHONE (616)164-2512 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1. 17. 580 2. 18. 584 3. 19. 584 4. 20. 585 5. 21. 632 6. 22. zzo 7. 23. 710 8. 24. 169 9. 25. 168 10. 26. 114 11 . 27. 186 12. 28. 186 13. 29. 184 14. 30. 183 15. 31. ZZ9 16. 345 INSTRUCTIONS:
9711130014 971104 PDR ADOCK 05000255 R                       PDR
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.  
 
*. *. ¥ REPORT MONTH OCTOBER 1997 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type' Duration Reason 2 Method of Shutting Licensee System Code 4 Component Code 5 Cause & Corrective (Hours) 5. Continued from 9/'29/97 359.6 1. 2. F: Forced Reason S: Scheduled A-Equipment Failure (Explain)
                                                                                                        *. *. ~ ¥
B-Maintenance or Test C-Refueling D-Regulatory Restrictio E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
                                                                                                    ')
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO         50-255 UNIT     ealisades DATE     11 l04l9Z COMPLETED BY KAKobiata MONTH         October                                                     TELEPHONE (616)164-2512 AVERAGE DAILY POWER LEVEL                           DAY     AVERAGE DAILY POWER LEVEL (MWe Net)                                                     (MWe Net)
: 1.                                                           17.             580
: 2.                                                           18.             584
: 3.                                                           19.             584
: 4.                                                           20.             585
: 5.                                                           21.             632
: 6.                                                           22.             zzo
: 7.                                                           23.             710
: 8.                                                           24.             169
: 9.                                                           25.             168
: 10.                                                           26.             114 11 .                                                         27.             186
: 12.                                                           28.             186
: 13.                                                           29.             184
: 14.                                                           30.             183
: 15.                                                           31.             ZZ9
: 16.             345 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
 
REPORT MONTH     OCTOBER 1997                                                                                                                 DOCKET NO    50-255 UNIT    Palisades DATE    11104/97 COMPLETED BY KAKobiata TELEPHONE 616-764-2572 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date         Type'     Duration     Reason 2     Method of           Licensee       System Component         Cause & Corrective (Hours)                   Shutting          Event          Code4  Code5                  Action to Down Reactor        Report#                                  Prevent Recurrence
: 5.       Continued from 9/'29/97       359.6
: 1.               2.                             3.                  4.                            5.
F: Forced         Reason                       Method:              Exhibit G - Instructions      Exhibit I - Same Source S: Scheduled     A-Equipment Failure (Explain)     1-Manual              for Preparation of Data B-Maintenance or Test         2-Manual Scram        Entry Sheets for Licensee C-Refueling                   3-Automatic Scram      Event Report (LER) File D-Regulatory Restrictio         4-0ther (Explain)      (NUREG-0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
H-Other (Explain)
Event Down Reactor Report# 3. Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)
 
: 4. Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
**-,,
Action to Prevent Recurrence
OPERATING DATA REPORT
: 5. Exhibit I -Same Source DOCKET NO 50-255 UNIT Palisades DATE 11104/97 COMPLETED BY KAKobiata TELEPHONE 616-764-2572
            *,
**-,, *, -* OPERATING STATUS: l. UNIT NAME 2. REPORTING PERIOD: 3. LICENSED THERMAL POWER (MWt) 4. NAMEPLATE RATING (GROSS MWe) 5. DESIGN ELECTRICAL RATING (NET MWe) 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) OPERATING DATA REPORT Palisades 971001-971031 2530 811. 7 805 **770 **730 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe).: 10. REASONS FOR RESTRICTIONS, IF ANY: 11. HOURS IN REPORTING PERIOD 12. NUMBER OF HOURS REACTOR WAS CRITICAL 13. REACTOR RESERVE SHUTDOWN HOURS 14. HOURS GENERATOR ON-LINE 15. UNIT RESERVE SHUTDOWN HOURS 16. GROpS. THERMAL ENERGY GENERATED (MWH) 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 18, NET ELECTRICAL ENERGY GENERATED (MWH) 19. UNIT SERVICE FACTOR 20. UNIT AVAILABILITY FACTOR 21. UNIT CAPACITY FACTOR (USING MDC NET) 22. UNIT CAPACITY FACTOR (USING DER NET) 23. UNIT FORCED OUTAGE RATE. This Month 745.0 396 .. 0 385.4 891761. 9 281622 266677 51. 7% 51.7\ 49.0% 44.5\ 4S. 3% 24 .. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYJ;>E, DATE AND DURATION OF EACH): Refueling Outage 4/25/98 39 days long 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTU 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
                    -*                                                                                            DOCKET NO       50-255 DATE     11-4-97 COMPLETED BY   KAKobiata TELEPHONE   (616)764-2572 OPERATING STATUS:
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure
NOTES:
* Weighted Average (635 MWe used as MDC Net prior to October 1985) Yr-to-Date 7296.0 6408.4 6251.8 15388066.9 4894106 4650874 85.7% 85.7\ 87.3\ 79.2\ 14 .3'1: Forecast DOCKET NO 50-255 DATE 11-4-97 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 NOTES: ------*--.**>>--
: l. UNIT NAME                                                           Palisades
Cumulative 226767.0 1J4505.6 129477.3 286992065.
: 2. REPORTING PERIOD:                                              971001-971031
4 90960841 85918634 57 .l\ 57. l\ 55.H* 47 .l\ 27.l\ Achieved}}
: 3. LICENSED THERMAL POWER (MWt)                                             2530
: 4. NAMEPLATE RATING (GROSS MWe)                                             811. 7
: 5. DESIGN ELECTRICAL RATING (NET MWe)                                         805
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)                                 **770
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe)                                   **730
: 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS:                                                                                          ------*--.**>>--
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe).:
: 10. REASONS FOR RESTRICTIONS, IF ANY:
This Month        Yr-to-Date                  Cumulative
: 11. HOURS IN REPORTING PERIOD                                                 745.0            7296.0                    226767.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                                       396.. 0          6408.4                    1J4505.6
: 13. REACTOR RESERVE SHUTDOWN HOURS
: 14. HOURS GENERATOR ON-LINE                                                   385.4            6251.8                    129477.3
: 15. UNIT RESERVE SHUTDOWN HOURS
: 16. GROpS. THERMAL ENERGY GENERATED (MWH)                                 891761. 9        15388066.9                286992065. 4
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                 281622            4894106                    90960841 18, NET ELECTRICAL ENERGY GENERATED (MWH)                                   266677            4650874                    85918634
: 19. UNIT SERVICE FACTOR                                                         51. 7%            85.7%                        57 .l\
: 20. UNIT AVAILABILITY FACTOR                                                   51.7\            85.7\                        57. l\
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                                       49.0%            87.3\                        55.H*
: 22. UNIT CAPACITY FACTOR (USING DER NET)                                       44.5\            79.2\                        47 .l\
: 23. UNIT FORCED OUTAGE RATE.                                                   4S. 3%           14 .3'1:                    27.l\
24 .. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYJ;>E, DATE AND DURATION OF EACH):
Refueling Outage 4/25/98 39 days long
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTU
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast                      Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure
* Weighted Average (635 MWe used as MDC Net prior to October 1985)}}

Revision as of 16:30, 21 October 2019

Revised MOR for Oct 1997 for Palisades Nuclear Plant
ML18067A766
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/31/1997
From: Kobiata K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18067A767 List:
References
NUDOCS 9711130014
Download: ML18067A766 (4)


Text

" 'u

SUMMARY

OF OPERATING EXPERIENCE FOR OCTOBER 1997 The Unit began the month offline, continuing the forced outage. Following the repair on the primary coolant pump leakoff line, the reactor went critical on October 15 at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />. The Unit went online October 15 at 2339 hours0.0271 days <br />0.65 hours <br />0.00387 weeks <br />8.899895e-4 months <br />. The Unit reached 80 percent power while repairs were made on a heater drain pump. Repairs were made and the power escalation resumed on October 21. The Unit was at full power on October 22.

9711130014 971104 PDR ADOCK 05000255 R PDR

  • . *. ~ ¥

')

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT ealisades DATE 11 l04l9Z COMPLETED BY KAKobiata MONTH October TELEPHONE (616)164-2512 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)

1. 17. 580
2. 18. 584
3. 19. 584
4. 20. 585
5. 21. 632
6. 22. zzo
7. 23. 710
8. 24. 169
9. 25. 168
10. 26. 114 11 . 27. 186
12. 28. 186
13. 29. 184
14. 30. 183
15. 31. ZZ9
16. 345 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

REPORT MONTH OCTOBER 1997 DOCKET NO 50-255 UNIT Palisades DATE 11104/97 COMPLETED BY KAKobiata TELEPHONE 616-764-2572 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type' Duration Reason 2 Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Code4 Code5 Action to Down Reactor Report# Prevent Recurrence

5. Continued from 9/'29/97 359.6
1. 2. 3. 4. 5.

F: Forced Reason Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restrictio 4-0ther (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

    • -,,

OPERATING DATA REPORT

  • ,

-* DOCKET NO 50-255 DATE 11-4-97 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 OPERATING STATUS:

NOTES:

l. UNIT NAME Palisades
2. REPORTING PERIOD: 971001-971031
3. LICENSED THERMAL POWER (MWt) 2530
4. NAMEPLATE RATING (GROSS MWe) 811. 7
5. DESIGN ELECTRICAL RATING (NET MWe) 805
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS: ------*--.**>>--
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe).:
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date Cumulative

11. HOURS IN REPORTING PERIOD 745.0 7296.0 226767.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 396.. 0 6408.4 1J4505.6
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE 385.4 6251.8 129477.3
15. UNIT RESERVE SHUTDOWN HOURS
16. GROpS. THERMAL ENERGY GENERATED (MWH) 891761. 9 15388066.9 286992065. 4
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 281622 4894106 90960841 18, NET ELECTRICAL ENERGY GENERATED (MWH) 266677 4650874 85918634
19. UNIT SERVICE FACTOR 51. 7% 85.7% 57 .l\
20. UNIT AVAILABILITY FACTOR 51.7\ 85.7\ 57. l\
21. UNIT CAPACITY FACTOR (USING MDC NET) 49.0% 87.3\ 55.H*
22. UNIT CAPACITY FACTOR (USING DER NET) 44.5\ 79.2\ 47 .l\
23. UNIT FORCED OUTAGE RATE. 4S. 3% 14 .3'1: 27.l\

24 .. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYJ;>E, DATE AND DURATION OF EACH):

Refueling Outage 4/25/98 39 days long

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTU
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure

  • Weighted Average (635 MWe used as MDC Net prior to October 1985)