ML18067A766: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:" 'u | {{#Wiki_filter:" 'u | ||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE FOR OCTOBER 1997 The Unit began the month offline, continuing the forced outage. Following the repair on the primary coolant pump leakoff line, the reactor went critical on October 15 at 1300 hours. The Unit went online October 15 at 2339 hours. The Unit reached 80 percent power while repairs were made on a heater drain pump. Repairs were made and the power escalation resumed on October 21. The Unit was at full power on October 22. 9711130014 971104 PDR ADOCK 05000255 R PDR | OF OPERATING EXPERIENCE FOR OCTOBER 1997 The Unit began the month offline, continuing the forced outage. Following the repair on the primary coolant pump leakoff line, the reactor went critical on October 15 at 1300 hours. The Unit went online October 15 at 2339 hours. The Unit reached 80 percent power while repairs were made on a heater drain pump. Repairs were made and the power escalation resumed on October 21. The Unit was at full power on October 22. | ||
') AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT ealisades DATE 11 l04l9Z COMPLETED BY KAKobiata MONTH October TELEPHONE (616)164-2512 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1. 17. 580 2. 18. 584 3. 19. 584 4. 20. 585 5. 21. 632 6. 22. zzo 7. 23. 710 8. 24. 169 9. 25. 168 10. 26. 114 11 . 27. 186 12. 28. 186 13. 29. 184 14. 30. 183 15. 31. ZZ9 16. 345 INSTRUCTIONS: | 9711130014 971104 PDR ADOCK 05000255 R PDR | ||
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt. | |||
*. *. ~ ¥ | |||
B-Maintenance or Test C-Refueling D-Regulatory Restrictio E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) | ') | ||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT ealisades DATE 11 l04l9Z COMPLETED BY KAKobiata MONTH October TELEPHONE (616)164-2512 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) | |||
: 1. 17. 580 | |||
: 2. 18. 584 | |||
: 3. 19. 584 | |||
: 4. 20. 585 | |||
: 5. 21. 632 | |||
: 6. 22. zzo | |||
: 7. 23. 710 | |||
: 8. 24. 169 | |||
: 9. 25. 168 | |||
: 10. 26. 114 11 . 27. 186 | |||
: 12. 28. 186 | |||
: 13. 29. 184 | |||
: 14. 30. 183 | |||
: 15. 31. ZZ9 | |||
: 16. 345 INSTRUCTIONS: | |||
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. | |||
Compute to the nearest whole megawatt. | |||
REPORT MONTH OCTOBER 1997 DOCKET NO 50-255 UNIT Palisades DATE 11104/97 COMPLETED BY KAKobiata TELEPHONE 616-764-2572 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type' Duration Reason 2 Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Code4 Code5 Action to Down Reactor Report# Prevent Recurrence | |||
: 5. Continued from 9/'29/97 359.6 | |||
: 1. 2. 3. 4. 5. | |||
F: Forced Reason Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restrictio 4-0ther (Explain) (NUREG-0161) | |||
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) | |||
H-Other (Explain) | H-Other (Explain) | ||
**-,, | |||
OPERATING DATA REPORT | |||
*, | |||
-* DOCKET NO 50-255 DATE 11-4-97 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 OPERATING STATUS: | |||
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure | NOTES: | ||
* Weighted Average (635 MWe used as MDC Net prior to October 1985) | : l. UNIT NAME Palisades | ||
: 2. REPORTING PERIOD: 971001-971031 | |||
: 3. LICENSED THERMAL POWER (MWt) 2530 | |||
: 4. NAMEPLATE RATING (GROSS MWe) 811. 7 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWe) 805 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730 | |||
: 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS: ------*--.**>>-- | |||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe).: | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | |||
This Month Yr-to-Date Cumulative | |||
: 11. HOURS IN REPORTING PERIOD 745.0 7296.0 226767.0 | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 396.. 0 6408.4 1J4505.6 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS | |||
: 14. HOURS GENERATOR ON-LINE 385.4 6251.8 129477.3 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS | |||
: 16. GROpS. THERMAL ENERGY GENERATED (MWH) 891761. 9 15388066.9 286992065. 4 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 281622 4894106 90960841 18, NET ELECTRICAL ENERGY GENERATED (MWH) 266677 4650874 85918634 | |||
: 19. UNIT SERVICE FACTOR 51. 7% 85.7% 57 .l\ | |||
: 20. UNIT AVAILABILITY FACTOR 51.7\ 85.7\ 57. l\ | |||
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 49.0% 87.3\ 55.H* | |||
: 22. UNIT CAPACITY FACTOR (USING DER NET) 44.5\ 79.2\ 47 .l\ | |||
: 23. UNIT FORCED OUTAGE RATE. 4S. 3% 14 .3'1: 27.l\ | |||
24 .. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYJ;>E, DATE AND DURATION OF EACH): | |||
Refueling Outage 4/25/98 39 days long | |||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTU | |||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | |||
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure | |||
* Weighted Average (635 MWe used as MDC Net prior to October 1985)}} |
Revision as of 16:30, 21 October 2019
ML18067A766 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 10/31/1997 |
From: | Kobiata K CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | |
Shared Package | |
ML18067A767 | List: |
References | |
NUDOCS 9711130014 | |
Download: ML18067A766 (4) | |
Text
" 'u
SUMMARY
OF OPERATING EXPERIENCE FOR OCTOBER 1997 The Unit began the month offline, continuing the forced outage. Following the repair on the primary coolant pump leakoff line, the reactor went critical on October 15 at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />. The Unit went online October 15 at 2339 hours0.0271 days <br />0.65 hours <br />0.00387 weeks <br />8.899895e-4 months <br />. The Unit reached 80 percent power while repairs were made on a heater drain pump. Repairs were made and the power escalation resumed on October 21. The Unit was at full power on October 22.
9711130014 971104 PDR ADOCK 05000255 R PDR
- . *. ~ ¥
')
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT ealisades DATE 11 l04l9Z COMPLETED BY KAKobiata MONTH October TELEPHONE (616)164-2512 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)
- 1. 17. 580
- 2. 18. 584
- 3. 19. 584
- 4. 20. 585
- 5. 21. 632
- 6. 22. zzo
- 7. 23. 710
- 8. 24. 169
- 9. 25. 168
- 10. 26. 114 11 . 27. 186
- 12. 28. 186
- 13. 29. 184
- 14. 30. 183
- 15. 31. ZZ9
- 16. 345 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
REPORT MONTH OCTOBER 1997 DOCKET NO 50-255 UNIT Palisades DATE 11104/97 COMPLETED BY KAKobiata TELEPHONE 616-764-2572 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type' Duration Reason 2 Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Code4 Code5 Action to Down Reactor Report# Prevent Recurrence
- 5. Continued from 9/'29/97 359.6
- 1. 2. 3. 4. 5.
F: Forced Reason Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restrictio 4-0ther (Explain) (NUREG-0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
- -,,
OPERATING DATA REPORT
- ,
-* DOCKET NO 50-255 DATE 11-4-97 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 OPERATING STATUS:
NOTES:
- l. UNIT NAME Palisades
- 2. REPORTING PERIOD: 971001-971031
- 3. LICENSED THERMAL POWER (MWt) 2530
- 4. NAMEPLATE RATING (GROSS MWe) 811. 7
- 5. DESIGN ELECTRICAL RATING (NET MWe) 805
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
- 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS: ------*--.**>>--
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe).:
- 10. REASONS FOR RESTRICTIONS, IF ANY:
This Month Yr-to-Date Cumulative
- 11. HOURS IN REPORTING PERIOD 745.0 7296.0 226767.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 396.. 0 6408.4 1J4505.6
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE 385.4 6251.8 129477.3
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROpS. THERMAL ENERGY GENERATED (MWH) 891761. 9 15388066.9 286992065. 4
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 281622 4894106 90960841 18, NET ELECTRICAL ENERGY GENERATED (MWH) 266677 4650874 85918634
- 19. UNIT SERVICE FACTOR 51. 7% 85.7% 57 .l\
- 20. UNIT AVAILABILITY FACTOR 51.7\ 85.7\ 57. l\
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 49.0% 87.3\ 55.H*
- 22. UNIT CAPACITY FACTOR (USING DER NET) 44.5\ 79.2\ 47 .l\
- 23. UNIT FORCED OUTAGE RATE. 4S. 3% 14 .3'1: 27.l\
24 .. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYJ;>E, DATE AND DURATION OF EACH):
Refueling Outage 4/25/98 39 days long
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTU
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)