{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSLYVANIA 19406-2713  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSLYVANIA 19406-2713 May 9, 2018 MEETING  
 
May 9, 2018 MEETING  


==SUMMARY==
==SUMMARY==


MN No. 18-005  
MN No. 18-005 LICENSEE:       ENTERGY NUCLEAR OPERATIONS, INC.
 
FACILITY:       PILGRIM NUCLEAR POWER STATION
LICENSEE: ENTERGY NUCLEAR OPERATIONS, INC.  
 
FACILITY: PILGRIM NUCLEAR POWER STATION  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF PUBLIC MEETING  
OF PUBLIC MEETING On March 27, 2018, at 6:00 p.m., an annual assessment meeting for Pilgrim Nuclear Power Station (Pilgrim) was held at Hotel 1620 in Plymouth, MA, between the U.S. Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (Entergy). The meeting was conducted in two parts, a discussion between NRC and Entergy, followed by a question and answer period with members of the public.
 
To start, NRC presented its assessment of the safety performance of Pilgrim for calendar year 2017, and discussed the status of follow-up inspections to review Entergys fulfillment of commitments listed in the Confirmatory Action Letter (CAL) issued by the NRC in August 2017.
On March 27, 2018, at 6:00 p.m., an annual assessment meeting for Pilgrim Nuclear Power Station (Pilgrim) was held at Hotel 1620 in Plymouth, MA, between the U.S. Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (Entergy). The meeting was conducted in two parts, a discussion between NRC and Entergy, followed by a question and answer period with members of the public.  
Entergy management then provided their perspectives on the organizations focus areas and plant performance. NRC staff also provided a brief update on the operational status of Pilgrim at the time of the meeting. Copies of the slides presented by both the NRC and Entergy are included as enclosures to this meeting summary. Members of the public, local and State officials, and staffers representing local area Congressional offices observed the discussions.
 
Following the meeting between the NRC and Entergy, attendees were offered the opportunity to ask questions of NRC officials or make statements. Several local and State representatives spoke, and several Congressional staff members read prepared statements (copies are included as enclosures). Questions raised by members of the public were addressed by the NRC staff.
To start, NRC presented its assessment of the safety performance of Pilgrim for calendar year 2017, and discussed the status of follow-up inspections to review Entergy's fulfillment of commitments listed in the Confirmatory Action Letter (CAL) issued by the NRC in August 2017.  
Additional information on the NRCs Annual Assessment Process and safety performance of Pilgrim can be found on the NRCs website at: https://www.nrc.gov/reactors/operating/
 
oversight/actionmatrix-summary.html. Further information regarding the additional NRC oversight at Pilgrim due to their Column 4 performance can be found on the NRCs website at:
Entergy management then provided their perspectives on the organization's focus areas and plant performance. NRC staff also provided a brief update on the operational status of Pilgrim at the time of the meeting. Copies of the slides presented by both the NRC and Entergy are included as enclosures to this meeting summary. Members of the public, local and State officials, and staffers representing local area Congressional offices observed the discussions.  
https://www.nrc.gov/info-finder/reactors/pilg/special-oversight.html
 
Following the meeting between the NRC and Entergy, attendees were offered the opportunity to ask questions of NRC officials or make statements. Several local and State representatives spoke, and several Congressional staff members read prepared statements (copies are included as enclosures). Questions raised by members of the public were addressed by the NRC staff.  
 
Additional information on the NRC's Annual Assessment Process and safety performance of Pilgrim can be found on the NRC's website at: https://www.nrc.gov/reactors/operating/
oversight/actionmatrix-summary.html. Further information regarding the additional NRC oversight at Pilgrim due to their Column 4 performance can be found on the NRC's website at:
https://www.nrc.gov/info-finder/reac tors/pilg/special-oversight.html
 
2  A transcript of this public meeting has been included as an enclosure to this meeting summary. Feedback forms submitted by members of the public following the meeting will be evaluated. The public meeting notice can be found in in ADAMS with Accession Number ML18073A140. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
_______/RA/___________________ Anthony Dimitriadis, Chief Reactor Projects Branch 5


Division of Reactor Projects  
2 A transcript of this public meeting has been included as an enclosure to this meeting summary.
Feedback forms submitted by members of the public following the meeting will be evaluated.
The public meeting notice can be found in in ADAMS with Accession Number ML18073A140.
ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
_______/RA/___________________
Anthony Dimitriadis, Chief Reactor Projects Branch 5 Division of Reactor Projects


==Enclosures:==
==Enclosures:==
: 1. NRC Slides (ML18127A027) 2. Entergy Slides (ML18127A028)
: 1. NRC Slides (ML18127A027)
: 3. Meeting Transcript (ML18127A033)
: 2. Entergy Slides (ML18127A028)
: 3. Meeting Transcript (ML18127A033)
: 4. Prepared statement from Congressman Keating (ML18127A030)
: 4. Prepared statement from Congressman Keating (ML18127A030)
: 5. Prepared statement from Senator Warren (ML18127A032) 6. Prepared statement from Senator Markey (ML18127A031)  
: 5. Prepared statement from Senator Warren (ML18127A032)
: 6. Prepared statement from Senator Markey (ML18127A031)


3  
3


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF PUBLIC MEETING dated May 9, 2018  
OF PUBLIC MEETING dated May 9, 2018 DISTRIBUTION: (via email)
 
ADimitriadis, DRP LCline, DRP MHardgrove, DRP ECarfang, DRP, SRI PBoguszewski, DRP, RI DScrenci, ORA NSheehan, ORA DTifft, ORA JGreives, ORA JWeil, OCA JLamb, NRR/DORL DPelton, DRP BWatson, NMSS BKlukan, ORA DJanda, DNMS RidsNRRPMPilgrim Resource DOCUMENT NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2017 EOC\2018 PG AAM\Meeting Summary\PG 2018 Annual Assessment Meeting Summary.docx ADAMS Accession Number: ML18130A159 Non-Sensitive                      Publicly Available SUNSI Review Sensitive                          Non-Publicly Available OFFICE          RI/DRP              RI/DRP NAME            MHardgrove          ADimitriadis DATE            5/9/18              5/7/18 OFFICIAL RECORD COPY
DISTRIBUTION: (via email)
ADimitriadis, DRP  
 
LCline, DRP MHardgrove, DRP ECarfang, DRP, SRI  
 
PBoguszewski, DRP, RI  
 
DScrenci, ORA NSheehan, ORA DTifft, ORA JGreives, ORA  
 
JWeil, OCA JLamb, NRR/DORL DPelton, DRP BWatson, NMSS  
 
BKlukan, ORA  


DJanda, DNMS RidsNRRPMPilgrim Resource DOCUMENT NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2017 EOC\2018 PG AAM\Meeting Summary\PG 2018 Annual Assessment Meeting Summary.docx      ADAMS Accession Number:  ML18130A159        SUNSI Review Non-Sensitive  Sensitive Publicly Available  Non-Publicly Available OFFICE RI/DRP RI/DRP    NAME MHardgrove ADimitriadis    DATE 5/9/18 5/7/18 OFFICIAL RECORD COPY UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSLYVANIA 19406-2713  
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSLYVANIA 19406-2713 May 9, 2018 MEETING  
 
May 9, 2018 MEETING  


==SUMMARY==
==SUMMARY==


MN No. 18-005  
MN No. 18-005 LICENSEE:       ENTERGY NUCLEAR OPERATIONS, INC.
 
FACILITY:       PILGRIM NUCLEAR POWER STATION
LICENSEE: ENTERGY NUCLEAR OPERATIONS, INC.  
 
FACILITY: PILGRIM NUCLEAR POWER STATION  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF PUBLIC MEETING  
OF PUBLIC MEETING On March 27, 2018, at 6:00 p.m., an annual assessment meeting for Pilgrim Nuclear Power Station (Pilgrim) was held at Hotel 1620 in Plymouth, MA, between the U.S. Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (Entergy). The meeting was conducted in two parts, a discussion between NRC and Entergy, followed by a question and answer period with members of the public.
 
To start, NRC presented its assessment of the safety performance of Pilgrim for calendar year 2017, and discussed the status of follow-up inspections to review Entergys fulfillment of commitments listed in the Confirmatory Action Letter (CAL) issued by the NRC in August 2017.
On March 27, 2018, at 6:00 p.m., an annual assessment meeting for Pilgrim Nuclear Power Station (Pilgrim) was held at Hotel 1620 in Plymouth, MA, between the U.S. Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (Entergy). The meeting was conducted in two parts, a discussion between NRC and Entergy, followed by a question and answer period with members of the public.  
Entergy management then provided their perspectives on the organizations focus areas and plant performance. NRC staff also provided a brief update on the operational status of Pilgrim at the time of the meeting. Copies of the slides presented by both the NRC and Entergy are included as enclosures to this meeting summary. Members of the public, local and State officials, and staffers representing local area Congressional offices observed the discussions.
 
Following the meeting between the NRC and Entergy, attendees were offered the opportunity to ask questions of NRC officials or make statements. Several local and State representatives spoke, and several Congressional staff members read prepared statements (copies are included as enclosures). Questions raised by members of the public were addressed by the NRC staff.
To start, NRC presented its assessment of the safety performance of Pilgrim for calendar year 2017, and discussed the status of follow-up inspections to review Entergy's fulfillment of commitments listed in the Confirmatory Action Letter (CAL) issued by the NRC in August 2017.  
Additional information on the NRCs Annual Assessment Process and safety performance of Pilgrim can be found on the NRCs website at: https://www.nrc.gov/reactors/operating/
 
oversight/actionmatrix-summary.html. Further information regarding the additional NRC oversight at Pilgrim due to their Column 4 performance can be found on the NRCs website at:
Entergy management then provided their perspectives on the organization's focus areas and plant performance. NRC staff also provided a brief update on the operational status of Pilgrim at the time of the meeting. Copies of the slides presented by both the NRC and Entergy are included as enclosures to this meeting summary. Members of the public, local and State officials, and staffers representing local area Congressional offices observed the discussions.  
https://www.nrc.gov/info-finder/reactors/pilg/special-oversight.html
 
Following the meeting between the NRC and Entergy, attendees were offered the opportunity to ask questions of NRC officials or make statements. Several local and State representatives spoke, and several Congressional staff members read prepared statements (copies are included as enclosures). Questions raised by members of the public were addressed by the NRC staff.  
 
Additional information on the NRC's Annual Assessment Process and safety performance of Pilgrim can be found on the NRC's website at: https://www.nrc.gov/reactors/operating/
oversight/actionmatrix-summary.html. Further information regarding the additional NRC oversight at Pilgrim due to their Column 4 performance can be found on the NRC's website at:
https://www.nrc.gov/info-finder/reac tors/pilg/special-oversight.html


2 A transcript of this public meeting has been included as an enclosure to this meeting summary. Feedback forms submitted by members of the public following the meeting will be evaluated. The public meeting notice can be found in in ADAMS with Accession Number ML18073A140. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
2 A transcript of this public meeting has been included as an enclosure to this meeting summary.
_______/RA/___________________ Anthony Dimitriadis, Chief Reactor Projects Branch 5  
Feedback forms submitted by members of the public following the meeting will be evaluated.
 
The public meeting notice can be found in in ADAMS with Accession Number ML18073A140.
Division of Reactor Projects  
ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
_______/RA/___________________
Anthony Dimitriadis, Chief Reactor Projects Branch 5 Division of Reactor Projects


==Enclosures:==
==Enclosures:==
: 1. NRC Slides (ML18127A027) 2. Entergy Slides (ML18127A028)
: 1. NRC Slides (ML18127A027)
: 3. Meeting Transcript (ML18127A033)
: 2. Entergy Slides (ML18127A028)
: 3. Meeting Transcript (ML18127A033)
: 4. Prepared statement from Congressman Keating (ML18127A030)
: 4. Prepared statement from Congressman Keating (ML18127A030)
: 5. Prepared statement from Senator Warren (ML18127A032) 6. Prepared statement from Senator Markey (ML18127A031)  
: 5. Prepared statement from Senator Warren (ML18127A032)
: 6. Prepared statement from Senator Markey (ML18127A031)


3  
3


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF PUBLIC MEETING dated May 9, 2018  
OF PUBLIC MEETING dated May 9, 2018 DISTRIBUTION: (via email)
 
ADimitriadis, DRP LCline, DRP MHardgrove, DRP ECarfang, DRP, SRI PBoguszewski, DRP, RI DScrenci, ORA NSheehan, ORA DTifft, ORA JGreives, ORA JWeil, OCA JLamb, NRR/DORL DPelton, DRP BWatson, NMSS BKlukan, ORA DJanda, DNMS RidsNRRPMPilgrim Resource DOCUMENT NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2017 EOC\2018 PG AAM\Meeting Summary\PG 2018 Annual Assessment Meeting Summary.docx ADAMS Accession Number: ML18130A159 Non-Sensitive                       Publicly Available SUNSI Review Sensitive                          Non-Publicly Available OFFICE         RI/DRP               RI/DRP NAME           MHardgrove           ADimitriadis DATE           5/9/18               5/7/18 OFFICIAL RECORD COPY}}
DISTRIBUTION: (via email)
ADimitriadis, DRP  
 
LCline, DRP MHardgrove, DRP ECarfang, DRP, SRI  
 
PBoguszewski, DRP, RI  
 
DScrenci, ORA NSheehan, ORA DTifft, ORA JGreives, ORA  
 
JWeil, OCA JLamb, NRR/DORL DPelton, DRP BWatson, NMSS  
 
BKlukan, ORA  
 
DJanda, DNMS RidsNRRPMPilgrim Resource DOCUMENT NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2017 EOC\2018 PG AAM\Meeting Summary\PG 2018 Annual Assessment Meeting Summary.docx     ADAMS Accession Number: ML18130A159         SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP   NAME MHardgrove ADimitriadis   DATE 5/9/18 5/7/18 OFFICIAL RECORD COPY}}

Revision as of 05:27, 21 October 2019

03/27/2018 - Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station
ML18130A159
Person / Time
Site: Pilgrim
Issue date: 05/09/2018
From: Anthony Dimitriadis
NRC/RGN-I/DRP/PB5
To:
Dimitriadis A
References
MN 18-005
Download: ML18130A159 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSLYVANIA 19406-2713 May 9, 2018 MEETING

SUMMARY

MN No.18-005 LICENSEE: ENTERGY NUCLEAR OPERATIONS, INC.

FACILITY: PILGRIM NUCLEAR POWER STATION

SUBJECT:

SUMMARY

OF PUBLIC MEETING On March 27, 2018, at 6:00 p.m., an annual assessment meeting for Pilgrim Nuclear Power Station (Pilgrim) was held at Hotel 1620 in Plymouth, MA, between the U.S. Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (Entergy). The meeting was conducted in two parts, a discussion between NRC and Entergy, followed by a question and answer period with members of the public.

To start, NRC presented its assessment of the safety performance of Pilgrim for calendar year 2017, and discussed the status of follow-up inspections to review Entergys fulfillment of commitments listed in the Confirmatory Action Letter (CAL) issued by the NRC in August 2017.

Entergy management then provided their perspectives on the organizations focus areas and plant performance. NRC staff also provided a brief update on the operational status of Pilgrim at the time of the meeting. Copies of the slides presented by both the NRC and Entergy are included as enclosures to this meeting summary. Members of the public, local and State officials, and staffers representing local area Congressional offices observed the discussions.

Following the meeting between the NRC and Entergy, attendees were offered the opportunity to ask questions of NRC officials or make statements. Several local and State representatives spoke, and several Congressional staff members read prepared statements (copies are included as enclosures). Questions raised by members of the public were addressed by the NRC staff.

Additional information on the NRCs Annual Assessment Process and safety performance of Pilgrim can be found on the NRCs website at: https://www.nrc.gov/reactors/operating/

oversight/actionmatrix-summary.html. Further information regarding the additional NRC oversight at Pilgrim due to their Column 4 performance can be found on the NRCs website at:

https://www.nrc.gov/info-finder/reactors/pilg/special-oversight.html

2 A transcript of this public meeting has been included as an enclosure to this meeting summary.

Feedback forms submitted by members of the public following the meeting will be evaluated.

The public meeting notice can be found in in ADAMS with Accession Number ML18073A140.

ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

_______/RA/___________________

Anthony Dimitriadis, Chief Reactor Projects Branch 5 Division of Reactor Projects

Enclosures:

1. NRC Slides (ML18127A027)
2. Entergy Slides (ML18127A028)
3. Meeting Transcript (ML18127A033)
4. Prepared statement from Congressman Keating (ML18127A030)
5. Prepared statement from Senator Warren (ML18127A032)
6. Prepared statement from Senator Markey (ML18127A031)

3

SUBJECT:

SUMMARY

OF PUBLIC MEETING dated May 9, 2018 DISTRIBUTION: (via email)

ADimitriadis, DRP LCline, DRP MHardgrove, DRP ECarfang, DRP, SRI PBoguszewski, DRP, RI DScrenci, ORA NSheehan, ORA DTifft, ORA JGreives, ORA JWeil, OCA JLamb, NRR/DORL DPelton, DRP BWatson, NMSS BKlukan, ORA DJanda, DNMS RidsNRRPMPilgrim Resource DOCUMENT NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2017 EOC\2018 PG AAM\Meeting Summary\PG 2018 Annual Assessment Meeting Summary.docx ADAMS Accession Number: ML18130A159 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME MHardgrove ADimitriadis DATE 5/9/18 5/7/18 OFFICIAL RECORD COPY

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSLYVANIA 19406-2713 May 9, 2018 MEETING

SUMMARY

MN No.18-005 LICENSEE: ENTERGY NUCLEAR OPERATIONS, INC.

FACILITY: PILGRIM NUCLEAR POWER STATION

SUBJECT:

SUMMARY

OF PUBLIC MEETING On March 27, 2018, at 6:00 p.m., an annual assessment meeting for Pilgrim Nuclear Power Station (Pilgrim) was held at Hotel 1620 in Plymouth, MA, between the U.S. Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (Entergy). The meeting was conducted in two parts, a discussion between NRC and Entergy, followed by a question and answer period with members of the public.

To start, NRC presented its assessment of the safety performance of Pilgrim for calendar year 2017, and discussed the status of follow-up inspections to review Entergys fulfillment of commitments listed in the Confirmatory Action Letter (CAL) issued by the NRC in August 2017.

Entergy management then provided their perspectives on the organizations focus areas and plant performance. NRC staff also provided a brief update on the operational status of Pilgrim at the time of the meeting. Copies of the slides presented by both the NRC and Entergy are included as enclosures to this meeting summary. Members of the public, local and State officials, and staffers representing local area Congressional offices observed the discussions.

Following the meeting between the NRC and Entergy, attendees were offered the opportunity to ask questions of NRC officials or make statements. Several local and State representatives spoke, and several Congressional staff members read prepared statements (copies are included as enclosures). Questions raised by members of the public were addressed by the NRC staff.

Additional information on the NRCs Annual Assessment Process and safety performance of Pilgrim can be found on the NRCs website at: https://www.nrc.gov/reactors/operating/

oversight/actionmatrix-summary.html. Further information regarding the additional NRC oversight at Pilgrim due to their Column 4 performance can be found on the NRCs website at:

https://www.nrc.gov/info-finder/reactors/pilg/special-oversight.html

2 A transcript of this public meeting has been included as an enclosure to this meeting summary.

Feedback forms submitted by members of the public following the meeting will be evaluated.

The public meeting notice can be found in in ADAMS with Accession Number ML18073A140.

ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

_______/RA/___________________

Anthony Dimitriadis, Chief Reactor Projects Branch 5 Division of Reactor Projects

Enclosures:

1. NRC Slides (ML18127A027)
2. Entergy Slides (ML18127A028)
3. Meeting Transcript (ML18127A033)
4. Prepared statement from Congressman Keating (ML18127A030)
5. Prepared statement from Senator Warren (ML18127A032)
6. Prepared statement from Senator Markey (ML18127A031)

3

SUBJECT:

SUMMARY

OF PUBLIC MEETING dated May 9, 2018 DISTRIBUTION: (via email)

ADimitriadis, DRP LCline, DRP MHardgrove, DRP ECarfang, DRP, SRI PBoguszewski, DRP, RI DScrenci, ORA NSheehan, ORA DTifft, ORA JGreives, ORA JWeil, OCA JLamb, NRR/DORL DPelton, DRP BWatson, NMSS BKlukan, ORA DJanda, DNMS RidsNRRPMPilgrim Resource DOCUMENT NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2017 EOC\2018 PG AAM\Meeting Summary\PG 2018 Annual Assessment Meeting Summary.docx ADAMS Accession Number: ML18130A159 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME MHardgrove ADimitriadis DATE 5/9/18 5/7/18 OFFICIAL RECORD COPY