ML18127A032

From kanterella
Jump to navigation Jump to search
Statement of Senator Elizabeth Warren - NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station - 03/27/2018
ML18127A032
Person / Time
Site: Pilgrim
Issue date: 05/07/2018
From: Warren E
US SEN (Senate)
To:
Division Reactor Projects I
Dimitriadis A
References
Download: ML18127A032 (2)


Text

Memo to File: May 7, 2018 Attached is a prepared statement from Senator Elizabeth Warren, presented at the Annual Assessment Meeting for Pilgrim Nuclear Power Station on March 27, 2018.

ML18127A032 Memo to File: May 7, 2018 Attached is a prepared statement from Senator Elizabeth Warren, presented at the Annual Assessment Meeting for Pilgrim Nuclear Power Station on March 27, 2018.

ML18127A032