ML18127A032
Jump to navigation
Jump to search
| ML18127A032 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 05/07/2018 |
| From: | Warren E US SEN (Senate) |
| To: | Division Reactor Projects I |
| Dimitriadis A | |
| References | |
| Download: ML18127A032 (2) | |
Text
Memo to File: May 7, 2018 Attached is a prepared statement from Senator Elizabeth Warren, presented at the Annual Assessment Meeting for Pilgrim Nuclear Power Station on March 27, 2018.
Memo to File: May 7, 2018 Attached is a prepared statement from Senator Elizabeth Warren, presented at the Annual Assessment Meeting for Pilgrim Nuclear Power Station on March 27, 2018.