ML19071A157: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 15: Line 15:
| page count = 7
| page count = 7
}}
}}
See also: [[followed by::IR 05000275/2019010]]
See also: [[see also::IR 05000275/2019010]]


=Text=
=Text=
{{#Wiki_filter:March 11, 2019  
{{#Wiki_filter:March 11, 2019
Mr. James M. Welsch
Vice President Nuclear Generation
and Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424
SUBJECT:        DIABLO CANYON POWER PLANT - NOTIFICATION OF NRC DESIGN BASES
                ASSURANCE INSPECTION (TEAMS) (05000275/2019010 AND
                05000323/2019010) AND INITIAL REQUEST FOR INFORMATION
Dear Mr. Welsch:
On May 21, 2019, the Nuclear Regulatory Commission (NRC) will begin a triennial baseline
component design bases inspection at the Diablo Canyon Power Plant. A six-person team will
perform this inspection using NRC Inspection Procedure 71111, Attachment 21M Design
Bases Assurance Inspection (Teams).
The inspection focuses on the maintenance of component design bases and modifications
made to structures, systems, and components. The samples reviewed during this inspection
will be identified during an information gathering visit. In addition, a number of operating
experience issues will also be selected for review during the in-office preparation week.
The inspection will include an information gathering site visit by the team leader and 2 weeks of
onsite inspection by the team. The inspection will consist of three NRC inspectors and two NRC
contractors, who will focus on engineering, and one NRC inspector that will focus on operations.
The current inspection schedule is as follows:
        Onsite Information Gathering Visit: May 22, 2019
        Preparation Week: June 3, 2019
        Onsite Week: June 10-14 and June 24-28, 2019
The purpose of the information gathering visit is to meet with members of your staff to identify
potential risk-significant components and operator actions. The lead inspector will also request
a tour of the plant with members of your operations staff and probabilistic safety assessment
staff. During the onsite weeks, several days will be needed on the plant-referenced simulator in


J. Welsch                                          2
order to facilitate the development of operator action-based scenarios. Additional information
and documentation needed to support the inspection will be identified during the inspection,
including interviews with engineering managers, engineers, and probabilistic safety assessment
staff.
Our experience with these inspections has shown that they are extremely resource intensive,
both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact
on the site and to ensure a productive inspection, we have enclosed a request for information
needed for the inspection. The request has been divided into two groups. The first group lists
information necessary for the information gathering visit and for general preparation. This
information should be available to the regional office no later than May 21, 2019, unless
otherwise stated. If possible, this information should be provided electronically to the lead
inspector. Since the inspection will be concentrated on high risk/low margin components and
modifications, calculations associated with your list of high risk components and modifications
should be available to review during the information gathering visit to assist in our selection of
components based on available design margin.
The second group of documents requested lists information necessary to aid the inspection
team in tracking issues identified as a result of the inspection. It is requested that this
information be provided to the lead inspector as the information is generated during the
inspection. An additional request will be made by the team during the preparation week once
the specific components and modifications have been selected. Additional requests by
inspectors will also be made throughout the onsite weeks for specific documents needed to
complete the review. It is important that all of these documents are up-to-date and complete in
order to minimize the number of additional document requests during the preparation and/or
onsite portions of the inspection. In order to facilitate the inspection, we request that a contact
individual be assigned to each inspector to ensure information requests, questions, and
concerns are addressed in a timely manner.
The lead inspector for this inspection is Gerond A. George, Senior Reactor Inspector. We
understand that our licensing engineer contact for this inspection is Ms. A. Sorenson. If there
are any questions about the inspection or the requested materials, please contact the lead
inspector by telephone at 817-200-1562 or by e-mail at Gerond.George@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.


J. Welsch                                        3
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for
Withholding.
                                              Sincerely,
                                              /RA/
                                              Vincent G. Gaddy, Chief
                                              Engineering Branch 1
                                              Division of Reactor Safety
Docket Nos. 50-275, 50-323
License Nos. DPR-80, DPR-82
Enclosure:
Initial Request for Information
  Design Bases Assurance Inspection (Teams)


                                  Initial Request for Information
                          Design Bases Assurance Inspection (Teams)
                                    Diablo Canyon Power Plant
Inspection Report:                      05000275/2019010; 05000323/2019010
EPID ID:                                I-2019-010-0039
Information Gathering Date:              May 22, 2019
Inspection Dates:                        June 10-14 and June 24-28, 2019
Inspection Procedure:                    IP 71111, Attachment 21M, Design Bases Assurance
                                        Inspection (Teams)
Lead Inspector:                          Gerond A. George, Senior Reactor Inspector
I.    Information Requested Prior to Information Gathering Visit (May 15, 2019)
      The following information (Section I of this enclosure) should be sent to the Region IV
      office in hard copy or electronic format (electronic database preferred), to the attention of
      Gerond A. George, by May 15, 2019. The specific items selected from the lists shall be
      available and ready for review on the day indicated in this request. *Please provide
      requested documentation electronically in pdf files, Excel, or other searchable formats,
      if possible. The information should contain descriptive names and be indexed and
      hyperlinked to facilitate ease of use. Information in lists should contain enough
      information to be easily understood by someone who has knowledge of pressurized
      water reactor technology. If requested documents are large and only hard copy formats
      are available, please inform the inspector and provide subject documentation during the
      first day of the onsite inspection.
      1. An Excel spreadsheet of equipment basic events (with definitions), including
            importance measures sorted by risk achievement worth and Birnbaum from your
            internal events probabilistic risk assessment. Include basic events with risk
            achievement worth value of 1.3 or greater.
      2. A list of the top 50 cut-sets from your PRA.
      3. Copies of probabilistic risk assessment system notebooks and the latest
            probabilistic risk assessment summary document.
      4. An Excel spreadsheet of probabilistic risk assessment human action basic events or
            risk ranking of operator actions from your site-specific PSA sorted by risk
            achievement worth and Birnbaum. Provide copies of your human reliability
            worksheets for these items.
                                                                                  Enclosure


5. If you have an external events or fire PSA model, provide the information requested
    in items 1-4 for external events and fire.
6. Lists of permanent and temporary modifications performed in the past 5 years to
    structures, systems, and components sorted by component identified in Item 1.
7. A list of high large early release frequency impact events and associated
    components.
8. Structures, systems, and components in the Maintenance Rule (a)(1) category.
9. A list of high risk maintenance rule systems/components and functions; based on
    engineering or expert panel judgment.
10. A copy of the Top Ten Issues list, if available.
11. Any pre-existing list of components and associated calculations with low design
    margins.
12. A List of root cause evaluations associated with component failures or design issues
    initiated/completed in the last 5 years.
13. A list of any common-cause failures of components in the last 3 years.
14. A list of operating experience evaluations for the last 3 years.
15. A list of all time-critical operator actions in procedures.
16. A list of current operator work arounds/burdens.
17. Procedures, including emergency and abnormal, used to accomplish operator
    actions associated with the basic events credited in your PRA.
18. Electronic copies of quality assurance program manual, corrective action program,
    and engineering design change procedures.
19. A copy of any internal/external self-assessments and associated corrective action
    documents generated in preparation for this inspection.
20. A copy of engineering/operations-related audits completed in the last 2 years.
21. Electronic copies of the Technical Specifications, Technical Specifications Bases,
    Technical Requirements Manual, and the Final Safety Analysis Report, as updated.
22. A copy of the Individual Plant Examination of External Events, if available
    electronically.
23. One-line drawings of emergency core cooling systems, ultimate heat sink,
    emergency safety features, and safety-related electrical systems.
24. A copy of plant systems equipment identifier key or procedure.
                                              2


      25. A copy of condition reports associated with inspection findings from the previous
          NRC Inspection Procedure 71111.21 (or 71111.21 Attachment M inspection).
      26. A list of licensee contacts for the inspection team with phone numbers.
      27. A copy of the current management and engineering organizational charts.
II.    Information Requested to be provided throughout the inspection.
      1. Electronic copies of the design bases documents for selected components and
          modifications.
      2. Electronic copies of the system health notebooks for selected components and
          modifications.
      3. A list of the design calculations that provide the design margin information for
          selected components. (Calculations for selected components should be available
          during the information gathering visit.)
      4. Calculations and drawings associated with selected components.
      5. Documentation associated with modifications selected from Item I.6, this includes:
              a. Post-modification testing, including performance characteristics affected,
                    assumptions, and acceptance criteria associated with modifications selected.
              b. Updated maintenance and surveillance procedures associated with
                    modifications.
              c. Updated operation, emergency, and abnormal procedures associated with
                    the modifications.
              d. 10 CFR 50.59 applicability determination, screening, and safety evaluation.
      6. Copies of any corrective action documents generated as a result of the teams
          questions or queries during this inspection.
      7. Copies of the list of questions submitted by the team members and the
          status/resolution of the information requested (provide daily during the inspection to
          each team member).
Inspector Contact Information:                        Mailing Address:
Gerond A. George                                      U.S. NRC, Region IV
Senior Reactor Inspector                              Attn: Gerond A. George
817-200-1562                                          1600 East Lamar Blvd.
Gerond.George@nrc.gov                                  Arlington, TX 76011-4511
                                                  3




 
ML19071A157
 
  SUNSI Review:        ADAMS:            Non-Publicly Available  Non-Sensitive Keyword:
 
  By: GAG              Yes No        Publicly Available      Sensitive      NRC-002
 
  OFFICE        SRI:EB1      C:EB1
 
  NAME          GGeorge      VGaddy
 
  SIGNATURE          /RA/           /RA/
 
DATE            03/08/2019     3/11/2019
   
 
 
 
 
 
 
   
 
 
/RA/
 
 
 
   
 
 
 
 
 
 
 
 
   
 
I. Information Requested Prior to Information Gathering Visit (May 15, 2019)
 
 
 
 
   
II. Information Requested to be provided throughout the inspection.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
    /RA/ /RA/ 03/08/2019 3/11/2019
}}
}}

Latest revision as of 23:12, 19 October 2019

Notification of NRC Design Bases Assurance Inspection (Teams) (05000275/2019010 and 05000323/2019010) and Initial Request for Information
ML19071A157
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/11/2019
From: Vincent Gaddy
Region 4 Engineering Branch 1
To: Welsch J
Pacific Gas & Electric Co
Gaddy V
References
EPID I-2019-010-0039 IR 2019010
Download: ML19071A157 (7)


See also: IR 05000275/2019010

Text

March 11, 2019

Mr. James M. Welsch

Vice President Nuclear Generation

and Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF NRC DESIGN BASES

ASSURANCE INSPECTION (TEAMS) (05000275/2019010 AND

05000323/2019010) AND INITIAL REQUEST FOR INFORMATION

Dear Mr. Welsch:

On May 21, 2019, the Nuclear Regulatory Commission (NRC) will begin a triennial baseline

component design bases inspection at the Diablo Canyon Power Plant. A six-person team will

perform this inspection using NRC Inspection Procedure 71111, Attachment 21M Design

Bases Assurance Inspection (Teams).

The inspection focuses on the maintenance of component design bases and modifications

made to structures, systems, and components. The samples reviewed during this inspection

will be identified during an information gathering visit. In addition, a number of operating

experience issues will also be selected for review during the in-office preparation week.

The inspection will include an information gathering site visit by the team leader and 2 weeks of

onsite inspection by the team. The inspection will consist of three NRC inspectors and two NRC

contractors, who will focus on engineering, and one NRC inspector that will focus on operations.

The current inspection schedule is as follows:

Onsite Information Gathering Visit: May 22, 2019

Preparation Week: June 3, 2019

Onsite Week: June 10-14 and June 24-28, 2019

The purpose of the information gathering visit is to meet with members of your staff to identify

potential risk-significant components and operator actions. The lead inspector will also request

a tour of the plant with members of your operations staff and probabilistic safety assessment

staff. During the onsite weeks, several days will be needed on the plant-referenced simulator in

J. Welsch 2

order to facilitate the development of operator action-based scenarios. Additional information

and documentation needed to support the inspection will be identified during the inspection,

including interviews with engineering managers, engineers, and probabilistic safety assessment

staff.

Our experience with these inspections has shown that they are extremely resource intensive,

both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact

on the site and to ensure a productive inspection, we have enclosed a request for information

needed for the inspection. The request has been divided into two groups. The first group lists

information necessary for the information gathering visit and for general preparation. This

information should be available to the regional office no later than May 21, 2019, unless

otherwise stated. If possible, this information should be provided electronically to the lead

inspector. Since the inspection will be concentrated on high risk/low margin components and

modifications, calculations associated with your list of high risk components and modifications

should be available to review during the information gathering visit to assist in our selection of

components based on available design margin.

The second group of documents requested lists information necessary to aid the inspection

team in tracking issues identified as a result of the inspection. It is requested that this

information be provided to the lead inspector as the information is generated during the

inspection. An additional request will be made by the team during the preparation week once

the specific components and modifications have been selected. Additional requests by

inspectors will also be made throughout the onsite weeks for specific documents needed to

complete the review. It is important that all of these documents are up-to-date and complete in

order to minimize the number of additional document requests during the preparation and/or

onsite portions of the inspection. In order to facilitate the inspection, we request that a contact

individual be assigned to each inspector to ensure information requests, questions, and

concerns are addressed in a timely manner.

The lead inspector for this inspection is Gerond A. George, Senior Reactor Inspector. We

understand that our licensing engineer contact for this inspection is Ms. A. Sorenson. If there

are any questions about the inspection or the requested materials, please contact the lead

inspector by telephone at 817-200-1562 or by e-mail at Gerond.George@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

J. Welsch 3

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-275, 50-323

License Nos. DPR-80, DPR-82

Enclosure:

Initial Request for Information

Design Bases Assurance Inspection (Teams)

Initial Request for Information

Design Bases Assurance Inspection (Teams)

Diablo Canyon Power Plant

Inspection Report: 05000275/2019010; 05000323/2019010

EPID ID: I-2019-010-0039

Information Gathering Date: May 22, 2019

Inspection Dates: June 10-14 and June 24-28, 2019

Inspection Procedure: IP 71111, Attachment 21M, Design Bases Assurance

Inspection (Teams)

Lead Inspector: Gerond A. George, Senior Reactor Inspector

I. Information Requested Prior to Information Gathering Visit (May 15, 2019)

The following information (Section I of this enclosure) should be sent to the Region IV

office in hard copy or electronic format (electronic database preferred), to the attention of

Gerond A. George, by May 15, 2019. The specific items selected from the lists shall be

available and ready for review on the day indicated in this request. *Please provide

requested documentation electronically in pdf files, Excel, or other searchable formats,

if possible. The information should contain descriptive names and be indexed and

hyperlinked to facilitate ease of use. Information in lists should contain enough

information to be easily understood by someone who has knowledge of pressurized

water reactor technology. If requested documents are large and only hard copy formats

are available, please inform the inspector and provide subject documentation during the

first day of the onsite inspection.

1. An Excel spreadsheet of equipment basic events (with definitions), including

importance measures sorted by risk achievement worth and Birnbaum from your

internal events probabilistic risk assessment. Include basic events with risk

achievement worth value of 1.3 or greater.

2. A list of the top 50 cut-sets from your PRA.

3. Copies of probabilistic risk assessment system notebooks and the latest

probabilistic risk assessment summary document.

4. An Excel spreadsheet of probabilistic risk assessment human action basic events or

risk ranking of operator actions from your site-specific PSA sorted by risk

achievement worth and Birnbaum. Provide copies of your human reliability

worksheets for these items.

Enclosure

5. If you have an external events or fire PSA model, provide the information requested

in items 1-4 for external events and fire.

6. Lists of permanent and temporary modifications performed in the past 5 years to

structures, systems, and components sorted by component identified in Item 1.

7. A list of high large early release frequency impact events and associated

components.

8. Structures, systems, and components in the Maintenance Rule (a)(1) category.

9. A list of high risk maintenance rule systems/components and functions; based on

engineering or expert panel judgment.

10. A copy of the Top Ten Issues list, if available.

11. Any pre-existing list of components and associated calculations with low design

margins.

12. A List of root cause evaluations associated with component failures or design issues

initiated/completed in the last 5 years.

13. A list of any common-cause failures of components in the last 3 years.

14. A list of operating experience evaluations for the last 3 years.

15. A list of all time-critical operator actions in procedures.

16. A list of current operator work arounds/burdens.

17. Procedures, including emergency and abnormal, used to accomplish operator

actions associated with the basic events credited in your PRA.

18. Electronic copies of quality assurance program manual, corrective action program,

and engineering design change procedures.

19. A copy of any internal/external self-assessments and associated corrective action

documents generated in preparation for this inspection.

20. A copy of engineering/operations-related audits completed in the last 2 years.

21. Electronic copies of the Technical Specifications, Technical Specifications Bases,

Technical Requirements Manual, and the Final Safety Analysis Report, as updated.

22. A copy of the Individual Plant Examination of External Events, if available

electronically.

23. One-line drawings of emergency core cooling systems, ultimate heat sink,

emergency safety features, and safety-related electrical systems.

24. A copy of plant systems equipment identifier key or procedure.

2

25. A copy of condition reports associated with inspection findings from the previous

NRC Inspection Procedure 71111.21 (or 71111.21 Attachment M inspection).

26. A list of licensee contacts for the inspection team with phone numbers.

27. A copy of the current management and engineering organizational charts.

II. Information Requested to be provided throughout the inspection.

1. Electronic copies of the design bases documents for selected components and

modifications.

2. Electronic copies of the system health notebooks for selected components and

modifications.

3. A list of the design calculations that provide the design margin information for

selected components. (Calculations for selected components should be available

during the information gathering visit.)

4. Calculations and drawings associated with selected components.

5. Documentation associated with modifications selected from Item I.6, this includes:

a. Post-modification testing, including performance characteristics affected,

assumptions, and acceptance criteria associated with modifications selected.

b. Updated maintenance and surveillance procedures associated with

modifications.

c. Updated operation, emergency, and abnormal procedures associated with

the modifications.

d. 10 CFR 50.59 applicability determination, screening, and safety evaluation.

6. Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

7. Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection to

each team member).

Inspector Contact Information: Mailing Address:

Gerond A. George U.S. NRC, Region IV

Senior Reactor Inspector Attn: Gerond A. George

817-200-1562 1600 East Lamar Blvd.

Gerond.George@nrc.gov Arlington, TX 76011-4511

3

ML19071A157

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: GAG Yes No Publicly Available Sensitive NRC-002

OFFICE SRI:EB1 C:EB1

NAME GGeorge VGaddy

SIGNATURE /RA/ /RA/

DATE 03/08/2019 3/11/2019