ML19071A157: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
| author name = Gaddy V | | author name = Gaddy V | ||
| author affiliation = NRC/RGN-IV/DRS/EB-1 | | author affiliation = NRC/RGN-IV/DRS/EB-1 | ||
| addressee name = Welsch J | | addressee name = Welsch J | ||
| addressee affiliation = Pacific Gas & Electric Co | | addressee affiliation = Pacific Gas & Electric Co | ||
| docket = 05000275, 05000323 | | docket = 05000275, 05000323 | ||
| license number = DPR-080, DPR-082 | | license number = DPR-080, DPR-082 | ||
| contact person = Gaddy V | | contact person = Gaddy V | ||
| case reference number = EPID I-2019-010-0039 | | case reference number = EPID I-2019-010-0039 | ||
| document report number = IR 2019010 | | document report number = IR 2019010 | ||
Line 15: | Line 15: | ||
| page count = 7 | | page count = 7 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000275/2019010]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:March 11, 2019 | {{#Wiki_filter:March 11, 2019 | ||
Mr. James M. Welsch | |||
Vice President Nuclear Generation | |||
and Chief Nuclear Officer | |||
Pacific Gas and Electric Company | |||
Diablo Canyon Power Plant | |||
P.O. Box 56, Mail Code 104/6 | |||
Avila Beach, CA 93424 | |||
SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF NRC DESIGN BASES | |||
ASSURANCE INSPECTION (TEAMS) (05000275/2019010 AND | |||
05000323/2019010) AND INITIAL REQUEST FOR INFORMATION | |||
Dear Mr. Welsch: | |||
On May 21, 2019, the Nuclear Regulatory Commission (NRC) will begin a triennial baseline | |||
component design bases inspection at the Diablo Canyon Power Plant. A six-person team will | |||
perform this inspection using NRC Inspection Procedure 71111, Attachment 21M Design | |||
Bases Assurance Inspection (Teams). | |||
The inspection focuses on the maintenance of component design bases and modifications | |||
made to structures, systems, and components. The samples reviewed during this inspection | |||
will be identified during an information gathering visit. In addition, a number of operating | |||
experience issues will also be selected for review during the in-office preparation week. | |||
The inspection will include an information gathering site visit by the team leader and 2 weeks of | |||
onsite inspection by the team. The inspection will consist of three NRC inspectors and two NRC | |||
contractors, who will focus on engineering, and one NRC inspector that will focus on operations. | |||
The current inspection schedule is as follows: | |||
Onsite Information Gathering Visit: May 22, 2019 | |||
Preparation Week: June 3, 2019 | |||
Onsite Week: June 10-14 and June 24-28, 2019 | |||
The purpose of the information gathering visit is to meet with members of your staff to identify | |||
potential risk-significant components and operator actions. The lead inspector will also request | |||
a tour of the plant with members of your operations staff and probabilistic safety assessment | |||
staff. During the onsite weeks, several days will be needed on the plant-referenced simulator in | |||
J. Welsch 2 | |||
order to facilitate the development of operator action-based scenarios. Additional information | |||
and documentation needed to support the inspection will be identified during the inspection, | |||
including interviews with engineering managers, engineers, and probabilistic safety assessment | |||
staff. | |||
Our experience with these inspections has shown that they are extremely resource intensive, | |||
both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact | |||
on the site and to ensure a productive inspection, we have enclosed a request for information | |||
needed for the inspection. The request has been divided into two groups. The first group lists | |||
information necessary for the information gathering visit and for general preparation. This | |||
information should be available to the regional office no later than May 21, 2019, unless | |||
otherwise stated. If possible, this information should be provided electronically to the lead | |||
inspector. Since the inspection will be concentrated on high risk/low margin components and | |||
modifications, calculations associated with your list of high risk components and modifications | |||
should be available to review during the information gathering visit to assist in our selection of | |||
components based on available design margin. | |||
The second group of documents requested lists information necessary to aid the inspection | |||
team in tracking issues identified as a result of the inspection. It is requested that this | |||
information be provided to the lead inspector as the information is generated during the | |||
inspection. An additional request will be made by the team during the preparation week once | |||
the specific components and modifications have been selected. Additional requests by | |||
inspectors will also be made throughout the onsite weeks for specific documents needed to | |||
complete the review. It is important that all of these documents are up-to-date and complete in | |||
order to minimize the number of additional document requests during the preparation and/or | |||
onsite portions of the inspection. In order to facilitate the inspection, we request that a contact | |||
individual be assigned to each inspector to ensure information requests, questions, and | |||
concerns are addressed in a timely manner. | |||
The lead inspector for this inspection is Gerond A. George, Senior Reactor Inspector. We | |||
understand that our licensing engineer contact for this inspection is Ms. A. Sorenson. If there | |||
are any questions about the inspection or the requested materials, please contact the lead | |||
inspector by telephone at 817-200-1562 or by e-mail at Gerond.George@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject | |||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection requirements were approved by the Office of Management and Budget, control | |||
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to | |||
respond to, a request for information or an information collection requirement unless the | |||
requesting document displays a currently valid Office of Management and Budget control | |||
number. | |||
J. Welsch 3 | |||
This letter, its enclosure, and your response (if any) will be made available for public inspection | |||
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document | |||
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for | |||
Withholding. | |||
Sincerely, | |||
/RA/ | |||
Vincent G. Gaddy, Chief | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Docket Nos. 50-275, 50-323 | |||
License Nos. DPR-80, DPR-82 | |||
Enclosure: | |||
Initial Request for Information | |||
Design Bases Assurance Inspection (Teams) | |||
Initial Request for Information | |||
Design Bases Assurance Inspection (Teams) | |||
Diablo Canyon Power Plant | |||
Inspection Report: 05000275/2019010; 05000323/2019010 | |||
EPID ID: I-2019-010-0039 | |||
Information Gathering Date: May 22, 2019 | |||
Inspection Dates: June 10-14 and June 24-28, 2019 | |||
Inspection Procedure: IP 71111, Attachment 21M, Design Bases Assurance | |||
Inspection (Teams) | |||
Lead Inspector: Gerond A. George, Senior Reactor Inspector | |||
I. Information Requested Prior to Information Gathering Visit (May 15, 2019) | |||
The following information (Section I of this enclosure) should be sent to the Region IV | |||
office in hard copy or electronic format (electronic database preferred), to the attention of | |||
Gerond A. George, by May 15, 2019. The specific items selected from the lists shall be | |||
available and ready for review on the day indicated in this request. *Please provide | |||
requested documentation electronically in pdf files, Excel, or other searchable formats, | |||
if possible. The information should contain descriptive names and be indexed and | |||
hyperlinked to facilitate ease of use. Information in lists should contain enough | |||
information to be easily understood by someone who has knowledge of pressurized | |||
water reactor technology. If requested documents are large and only hard copy formats | |||
are available, please inform the inspector and provide subject documentation during the | |||
first day of the onsite inspection. | |||
1. An Excel spreadsheet of equipment basic events (with definitions), including | |||
importance measures sorted by risk achievement worth and Birnbaum from your | |||
internal events probabilistic risk assessment. Include basic events with risk | |||
achievement worth value of 1.3 or greater. | |||
2. A list of the top 50 cut-sets from your PRA. | |||
3. Copies of probabilistic risk assessment system notebooks and the latest | |||
probabilistic risk assessment summary document. | |||
4. An Excel spreadsheet of probabilistic risk assessment human action basic events or | |||
risk ranking of operator actions from your site-specific PSA sorted by risk | |||
achievement worth and Birnbaum. Provide copies of your human reliability | |||
worksheets for these items. | |||
Enclosure | |||
5. If you have an external events or fire PSA model, provide the information requested | |||
in items 1-4 for external events and fire. | |||
6. Lists of permanent and temporary modifications performed in the past 5 years to | |||
structures, systems, and components sorted by component identified in Item 1. | |||
7. A list of high large early release frequency impact events and associated | |||
components. | |||
8. Structures, systems, and components in the Maintenance Rule (a)(1) category. | |||
9. A list of high risk maintenance rule systems/components and functions; based on | |||
engineering or expert panel judgment. | |||
10. A copy of the Top Ten Issues list, if available. | |||
11. Any pre-existing list of components and associated calculations with low design | |||
margins. | |||
12. A List of root cause evaluations associated with component failures or design issues | |||
initiated/completed in the last 5 years. | |||
13. A list of any common-cause failures of components in the last 3 years. | |||
14. A list of operating experience evaluations for the last 3 years. | |||
15. A list of all time-critical operator actions in procedures. | |||
16. A list of current operator work arounds/burdens. | |||
17. Procedures, including emergency and abnormal, used to accomplish operator | |||
actions associated with the basic events credited in your PRA. | |||
18. Electronic copies of quality assurance program manual, corrective action program, | |||
and engineering design change procedures. | |||
19. A copy of any internal/external self-assessments and associated corrective action | |||
documents generated in preparation for this inspection. | |||
20. A copy of engineering/operations-related audits completed in the last 2 years. | |||
21. Electronic copies of the Technical Specifications, Technical Specifications Bases, | |||
Technical Requirements Manual, and the Final Safety Analysis Report, as updated. | |||
22. A copy of the Individual Plant Examination of External Events, if available | |||
electronically. | |||
23. One-line drawings of emergency core cooling systems, ultimate heat sink, | |||
emergency safety features, and safety-related electrical systems. | |||
24. A copy of plant systems equipment identifier key or procedure. | |||
2 | |||
25. A copy of condition reports associated with inspection findings from the previous | |||
NRC Inspection Procedure 71111.21 (or 71111.21 Attachment M inspection). | |||
26. A list of licensee contacts for the inspection team with phone numbers. | |||
27. A copy of the current management and engineering organizational charts. | |||
II. Information Requested to be provided throughout the inspection. | |||
1. Electronic copies of the design bases documents for selected components and | |||
modifications. | |||
2. Electronic copies of the system health notebooks for selected components and | |||
modifications. | |||
3. A list of the design calculations that provide the design margin information for | |||
selected components. (Calculations for selected components should be available | |||
during the information gathering visit.) | |||
4. Calculations and drawings associated with selected components. | |||
5. Documentation associated with modifications selected from Item I.6, this includes: | |||
a. Post-modification testing, including performance characteristics affected, | |||
assumptions, and acceptance criteria associated with modifications selected. | |||
b. Updated maintenance and surveillance procedures associated with | |||
modifications. | |||
c. Updated operation, emergency, and abnormal procedures associated with | |||
the modifications. | |||
d. 10 CFR 50.59 applicability determination, screening, and safety evaluation. | |||
6. Copies of any corrective action documents generated as a result of the teams | |||
questions or queries during this inspection. | |||
7. Copies of the list of questions submitted by the team members and the | |||
status/resolution of the information requested (provide daily during the inspection to | |||
each team member). | |||
Inspector Contact Information: Mailing Address: | |||
Gerond A. George U.S. NRC, Region IV | |||
Senior Reactor Inspector Attn: Gerond A. George | |||
817-200-1562 1600 East Lamar Blvd. | |||
Gerond.George@nrc.gov Arlington, TX 76011-4511 | |||
3 | |||
ML19071A157 | |||
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: | |||
By: GAG Yes No Publicly Available Sensitive NRC-002 | |||
OFFICE SRI:EB1 C:EB1 | |||
NAME GGeorge VGaddy | |||
SIGNATURE /RA/ /RA/ | |||
DATE 03/08/2019 3/11/2019 | |||
}} | }} |
Latest revision as of 23:12, 19 October 2019
ML19071A157 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 03/11/2019 |
From: | Vincent Gaddy Region 4 Engineering Branch 1 |
To: | Welsch J Pacific Gas & Electric Co |
Gaddy V | |
References | |
EPID I-2019-010-0039 IR 2019010 | |
Download: ML19071A157 (7) | |
See also: IR 05000275/2019010
Text
March 11, 2019
Mr. James M. Welsch
Vice President Nuclear Generation
and Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424
SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF NRC DESIGN BASES
ASSURANCE INSPECTION (TEAMS) (05000275/2019010 AND
05000323/2019010) AND INITIAL REQUEST FOR INFORMATION
Dear Mr. Welsch:
On May 21, 2019, the Nuclear Regulatory Commission (NRC) will begin a triennial baseline
component design bases inspection at the Diablo Canyon Power Plant. A six-person team will
perform this inspection using NRC Inspection Procedure 71111, Attachment 21M Design
Bases Assurance Inspection (Teams).
The inspection focuses on the maintenance of component design bases and modifications
made to structures, systems, and components. The samples reviewed during this inspection
will be identified during an information gathering visit. In addition, a number of operating
experience issues will also be selected for review during the in-office preparation week.
The inspection will include an information gathering site visit by the team leader and 2 weeks of
onsite inspection by the team. The inspection will consist of three NRC inspectors and two NRC
contractors, who will focus on engineering, and one NRC inspector that will focus on operations.
The current inspection schedule is as follows:
Onsite Information Gathering Visit: May 22, 2019
Preparation Week: June 3, 2019
Onsite Week: June 10-14 and June 24-28, 2019
The purpose of the information gathering visit is to meet with members of your staff to identify
potential risk-significant components and operator actions. The lead inspector will also request
a tour of the plant with members of your operations staff and probabilistic safety assessment
staff. During the onsite weeks, several days will be needed on the plant-referenced simulator in
J. Welsch 2
order to facilitate the development of operator action-based scenarios. Additional information
and documentation needed to support the inspection will be identified during the inspection,
including interviews with engineering managers, engineers, and probabilistic safety assessment
staff.
Our experience with these inspections has shown that they are extremely resource intensive,
both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact
on the site and to ensure a productive inspection, we have enclosed a request for information
needed for the inspection. The request has been divided into two groups. The first group lists
information necessary for the information gathering visit and for general preparation. This
information should be available to the regional office no later than May 21, 2019, unless
otherwise stated. If possible, this information should be provided electronically to the lead
inspector. Since the inspection will be concentrated on high risk/low margin components and
modifications, calculations associated with your list of high risk components and modifications
should be available to review during the information gathering visit to assist in our selection of
components based on available design margin.
The second group of documents requested lists information necessary to aid the inspection
team in tracking issues identified as a result of the inspection. It is requested that this
information be provided to the lead inspector as the information is generated during the
inspection. An additional request will be made by the team during the preparation week once
the specific components and modifications have been selected. Additional requests by
inspectors will also be made throughout the onsite weeks for specific documents needed to
complete the review. It is important that all of these documents are up-to-date and complete in
order to minimize the number of additional document requests during the preparation and/or
onsite portions of the inspection. In order to facilitate the inspection, we request that a contact
individual be assigned to each inspector to ensure information requests, questions, and
concerns are addressed in a timely manner.
The lead inspector for this inspection is Gerond A. George, Senior Reactor Inspector. We
understand that our licensing engineer contact for this inspection is Ms. A. Sorenson. If there
are any questions about the inspection or the requested materials, please contact the lead
inspector by telephone at 817-200-1562 or by e-mail at Gerond.George@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
J. Welsch 3
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for
Withholding.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos. 50-275, 50-323
Enclosure:
Initial Request for Information
Design Bases Assurance Inspection (Teams)
Initial Request for Information
Design Bases Assurance Inspection (Teams)
Diablo Canyon Power Plant
Inspection Report: 05000275/2019010; 05000323/2019010
EPID ID: I-2019-010-0039
Information Gathering Date: May 22, 2019
Inspection Dates: June 10-14 and June 24-28, 2019
Inspection Procedure: IP 71111, Attachment 21M, Design Bases Assurance
Inspection (Teams)
Lead Inspector: Gerond A. George, Senior Reactor Inspector
I. Information Requested Prior to Information Gathering Visit (May 15, 2019)
The following information (Section I of this enclosure) should be sent to the Region IV
office in hard copy or electronic format (electronic database preferred), to the attention of
Gerond A. George, by May 15, 2019. The specific items selected from the lists shall be
available and ready for review on the day indicated in this request. *Please provide
requested documentation electronically in pdf files, Excel, or other searchable formats,
if possible. The information should contain descriptive names and be indexed and
hyperlinked to facilitate ease of use. Information in lists should contain enough
information to be easily understood by someone who has knowledge of pressurized
water reactor technology. If requested documents are large and only hard copy formats
are available, please inform the inspector and provide subject documentation during the
first day of the onsite inspection.
1. An Excel spreadsheet of equipment basic events (with definitions), including
importance measures sorted by risk achievement worth and Birnbaum from your
internal events probabilistic risk assessment. Include basic events with risk
achievement worth value of 1.3 or greater.
2. A list of the top 50 cut-sets from your PRA.
3. Copies of probabilistic risk assessment system notebooks and the latest
probabilistic risk assessment summary document.
4. An Excel spreadsheet of probabilistic risk assessment human action basic events or
risk ranking of operator actions from your site-specific PSA sorted by risk
achievement worth and Birnbaum. Provide copies of your human reliability
worksheets for these items.
Enclosure
5. If you have an external events or fire PSA model, provide the information requested
in items 1-4 for external events and fire.
6. Lists of permanent and temporary modifications performed in the past 5 years to
structures, systems, and components sorted by component identified in Item 1.
7. A list of high large early release frequency impact events and associated
components.
8. Structures, systems, and components in the Maintenance Rule (a)(1) category.
9. A list of high risk maintenance rule systems/components and functions; based on
engineering or expert panel judgment.
10. A copy of the Top Ten Issues list, if available.
11. Any pre-existing list of components and associated calculations with low design
margins.
12. A List of root cause evaluations associated with component failures or design issues
initiated/completed in the last 5 years.
13. A list of any common-cause failures of components in the last 3 years.
14. A list of operating experience evaluations for the last 3 years.
15. A list of all time-critical operator actions in procedures.
16. A list of current operator work arounds/burdens.
17. Procedures, including emergency and abnormal, used to accomplish operator
actions associated with the basic events credited in your PRA.
18. Electronic copies of quality assurance program manual, corrective action program,
and engineering design change procedures.
19. A copy of any internal/external self-assessments and associated corrective action
documents generated in preparation for this inspection.
20. A copy of engineering/operations-related audits completed in the last 2 years.
21. Electronic copies of the Technical Specifications, Technical Specifications Bases,
Technical Requirements Manual, and the Final Safety Analysis Report, as updated.
22. A copy of the Individual Plant Examination of External Events, if available
electronically.
23. One-line drawings of emergency core cooling systems, ultimate heat sink,
emergency safety features, and safety-related electrical systems.
24. A copy of plant systems equipment identifier key or procedure.
2
25. A copy of condition reports associated with inspection findings from the previous
NRC Inspection Procedure 71111.21 (or 71111.21 Attachment M inspection).
26. A list of licensee contacts for the inspection team with phone numbers.
27. A copy of the current management and engineering organizational charts.
II. Information Requested to be provided throughout the inspection.
1. Electronic copies of the design bases documents for selected components and
modifications.
2. Electronic copies of the system health notebooks for selected components and
modifications.
3. A list of the design calculations that provide the design margin information for
selected components. (Calculations for selected components should be available
during the information gathering visit.)
4. Calculations and drawings associated with selected components.
5. Documentation associated with modifications selected from Item I.6, this includes:
a. Post-modification testing, including performance characteristics affected,
assumptions, and acceptance criteria associated with modifications selected.
b. Updated maintenance and surveillance procedures associated with
modifications.
c. Updated operation, emergency, and abnormal procedures associated with
the modifications.
d. 10 CFR 50.59 applicability determination, screening, and safety evaluation.
6. Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
7. Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection to
each team member).
Inspector Contact Information: Mailing Address:
Gerond A. George U.S. NRC, Region IV
Senior Reactor Inspector Attn: Gerond A. George
817-200-1562 1600 East Lamar Blvd.
Gerond.George@nrc.gov Arlington, TX 76011-4511
3
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: GAG Yes No Publicly Available Sensitive NRC-002
OFFICE SRI:EB1 C:EB1
NAME GGeorge VGaddy
SIGNATURE /RA/ /RA/
DATE 03/08/2019 3/11/2019