| | title = Crack Growth Rates in a PWR Environment of Nickel-Base Alloys from Davis-Besse and V. C. Summer Plants | | | title = Crack Growth Rates in a PWR Environment of Nickel-Base Alloys from Davis-Besse and V. C. Summer Plants |
| | author name = Alexandreanu B, Chopra O K, Cullen W H, Shack W J | | | author name = Alexandreanu B, Chopra O, Cullen W, Shack W |
| | author affiliation = Argonne National Lab (ANL), NRC/RES/DFERR | | | author affiliation = Argonne National Lab (ANL), NRC/RES/DFERR |
| | addressee name = | | | addressee name = |
Revision as of 16:37, 13 July 2019
|
---|
Category:Conference/Symposium/Workshop Paper
MONTHYEARML16130A7502016-05-12012 May 2016 Summary of April 12, 2016, Teleconference Regarding Steam Generator Tube Inservice Inspection ML13051A0682013-03-26026 March 2013 January 16, 2013 Summary of Telephone Conference Call Held Between U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company ML12052A1792012-05-15015 May 2012 July 19, 2011, Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station ML12018A1462012-02-0909 February 2012 June 16, 2011, Summary of Telephone Conference Call Held Between the NRC and Firstenergy Nuclear Operating Company, Concerning RAI Pertaining to the Davis-Besse, License Renewal Application ML11364A0172012-01-19019 January 2012 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station, LRA ML0804306122008-03-0505 March 2008 Summary of Conference Telephone Call Regarding Their 2008 Steam Generator Tube Inspections ML0618002632006-09-18018 September 2006 Crack Growth Rates in a PWR Environment of Nickel-Base Alloys from Davis-Besse and V. C. Summer Plants ML0526600162005-08-16016 August 2005 Mantg Conference, 8/16/05 - Plenary - Keynote Speech by Samuel J. Collins, Regional Administrator, Region I, the Changing Roles of the Operators and Trainers 2016-05-12
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24008A2182024-01-25025 January 2024 Seismic Data to Support Public Meeting with Dominion Regarding NRC Staff Evaluation of Seismic Risk at V.C. Summer Generating Station - January 25, 2024 (Tables) ML24008A2112024-01-25025 January 2024 Evaluation of Seismic Risk for V. C. Summer Under the Process for Ongoing Assessment of Natural Hazard Information (Poanhi) - January 25, 2024 (Slides) ML23325A2452023-11-13013 November 2023 Enclosure 2 - Dominion Slides ML23313A1292023-11-0909 November 2023 Environmental Scoping Meeting for V.C. Summer Subsequent License Renewal Application - November 14 Meeting Slides ML23312A0202023-11-0808 November 2023 Environmental Scoping Meeting for V.C. Summer Subsequent License Renewal Application-Virtual Meeting Slides ML23152A2022023-06-0101 June 2023 2022 Davis-Besse End-of-Cycle Meeting Presentation ML23131A4182023-05-25025 May 2023 V.C. Summer Nuclear Station 2022 Annual Assessment Meeting.Pptx ML22222A1102022-07-21021 July 2022 KM Session Final ML22178A1952022-06-27027 June 2022 2021 Davis Besse Nuclear Power Station End-of-Cycle Meeting Presentation ML22115A0502022-04-21021 April 2022 VC Summer, 2021 Annual Assessment Meeting ML22028A3972022-02-0101 February 2022 NRC Regulatory Conference Presentation ML22028A3922022-02-0101 February 2022 Licensee Regulatory Conference Presentation ML21176A1992021-06-25025 June 2021 Slideshow Presentation for 2020 End -of-Cycle Public Meeting for Davis-Besse and Perry ML20210M0712020-07-27027 July 2020 Combined End-of-Cycle 2019 Public Meeting Slide Presentation ML20091G7232020-03-31031 March 2020 V.C. Summer 2019 Assessment Meeting Presentation ML19249D0212019-09-0606 September 2019 End-of-Cycle Summary Handout (2018) ML18310A3802018-11-0808 November 2018 Pre-Submittal Meeting Davis-Besse Nuclear Power Station (DB) Post-Shutdown Emergency Plan (PSEP) License Amendment Request ML18180A1962018-06-29029 June 2018 Slides for Davis Besse 2017 EOC Open House ML18144A1482018-05-24024 May 2018 Public Meeting Summary - Virgil C. Summer Nuclear Station Docket No. 50-395 ML18067A1212018-03-15015 March 2018 March 15, 2018, Public Meeting Presentation Regarding NFPA-805 Application ML17229B3382017-08-17017 August 2017 Presentation for 2016 Davis-Besse EOC Open House ML17087A1542017-03-28028 March 2017 Response to Request for Additional Information on VC Summer Sfpli - Elevation View ML16174A3152016-06-21021 June 2016 Annual Assessment Meeting Open House June 21, 2016 ML16117A1822016-04-22022 April 2016 Industry Slides for the Spring 2016 Conference Call Regarding the Steam Generator Tube Inservice Inspections ML15156A6962015-06-11011 June 2015 Annual Assessment Meeting Open House Handout ML14323A4522014-11-19019 November 2014 V.C. Summer Construction Update ML14266A3912014-09-23023 September 2014 September 23, 2014, Category 1 Public Meeting with V. C. Summer - Presentation Slides ML14224A1112014-08-25025 August 2014 Safety Culture Presentation for Brazil, U.S. Workshop on Safety and Security Culture - August 25, 2014 ML14232A5372014-08-21021 August 2014 8-21-14 CIP Mtg Slides - FFD and ITAAC ML14219A4762014-08-0707 August 2014 Operating Experience on Initial Test Program ML14218A0542014-08-0707 August 2014 Handout Davis-Besse EOC Mtg ML14057A4202014-02-27027 February 2014 Public Meeting 2/27/2014 VCS Construction Update ML14050A4002014-02-20020 February 2014 NRC Presentation for Davis-Besse Steam Generator Replacement Webinar ML14028A4272014-01-23023 January 2014 Vendor Inspection Finding & ITAAC (Pdf) ML13322B3112013-11-13013 November 2013 NFPA 805 Transition - Meeting Slides, 11/13/2013 ML13309A8592013-11-0505 November 2013 V. C. Summer Construction Status and Lesson Learned AD Torres ML13294A5972013-10-21021 October 2013 FENOC Presentation Slides for Public Meeting September 24, 2013 ML13220A0632013-08-30030 August 2013 Dsd ED2013 3267 Presentation, Primary Water Stress Corrosion Cracking Tests and Metallurgical Analyses of Davis-Besse Control Rod Drive Mechanism Nozzle #4. ML13170A1302013-06-18018 June 2013 Public Slide - NFPA 805 Transient Combustible Controls ML13170A1192013-06-18018 June 2013 Public Slide - Control Room Evacuation Due to Fire, Based on NFPA 805 ML13157A0642013-06-0606 June 2013 June 11, 2013 NRC Presentation ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML13123A1472013-05-0303 May 2013 Summary of Category 1 Public Meeting with South Carolina Electric and Gas,Virgil C. Summer Nuclear Station, Units 2 and 3, Annual Assessment ML13098A8042013-03-26026 March 2013 Combined Emergency Plan Review ML13078A2492013-03-20020 March 2013 Project Overview-Public Mtg 3-20-13 Non Proprietary ML12269A0612012-09-26026 September 2012 FENOC Presentation for 2012-09-26 Public Meeting ML12228A6292012-08-16016 August 2012 Report ITAAC Presentation ML12227A4172012-08-15015 August 2012 NRC End-Of-Cycle Assessment 2011 Meeting Presentation ML12221A2642012-08-0909 August 2012 NRC Public Meeting NRC Presentation 8/9/12 ML12221A2682012-08-0909 August 2012 FENOC Shield Building Cracking Davis-Besse Public Meeting 8/9/12 2024-01-25
[Table view] |
Text
Crack growth rates in a PWR environment of nickel-base alloy welds from the Davis-Besse and V.C. Summer plants B. Alexandreanu 1 , O. K. Chopra 1 , W. H. Cullen Jr.
2 and W. J. Shack 1 1 Nuclear Engineering Division, Argonne National Laboratory 2 U.S. Nuclear Regulatory Commission Fontevraud 6, September 18-22, 2006 2 OutlineObjectivesExperiment
-s pecimens-t esting conditions Results and discussion
-cyclic crack growth rates
-S CC crack growth rates
-f ractographySummary 3 ObjectivesObtain crack growth data under both cyclic and constant load conditions in PWR environment on field Alloy 182 weldsDetermine the effect of weld microstructure/orientation on SCC crack growth ratesCompare results with existing CGR database to determine the relative susceptibility of these welds to environmentally assisted cracking.
4 Field weld specimens testedAlloy 1 82 removed from the J-groove weld from Nozzle #11 from the Davis-Besse plant:
J11CC-1 (weld, Alloy 182)
J11CC-3 (weld, Alloy 182)Alloys 182 and 82 from the reactor vessel nozzle-to-pipe from the V. C. Summer plant:
WCR-01 (weld, Alloy 82)
BCR-01 (butter, Alloy 182)
WLR-01 (weld, Alloy 82) 5 Location of specimens -
Davis-Besse J-groove weld of #11 nozzle Cladding Alloy 182 Weld Low-Alloy Steel L Orientation C Orientation C Orientation L Orientation 64 mm 128 mm Weld height at 30° location 29 mm Weld height at 180° location 45 mm 6 Location of specimens -
V.C. Summer reactor vessel nozzle-to-pipe weld 7 Experiment1/2-T compact tension specimens fabricated from both weldsTemp: 316°C (D-B) and 320°C (VCS) PWR Water (<10 ppb DO, 1000 ppm B , 2 ppm Li, 2 ppm h ydrogenFlow Rate:55 mL/minConductivity:20 S/cmPrecracking carried out in the PWR environment to facilit ate the t ransition from transgranular fatigue cracking to intergranular SCC cracking before conducting the constant load testLoad Ratio R:
0.3-precrack; 0.5-0.7-sawtooth with up to 1000s rise time; 1.0-constant loadCrack extension measured by DC potential drop methodFinal crack length confirmed/corrected by actual measurements.
8 Davis-Besse weld alloys 9 Cyclic CGR data for Davis-Besse weld alloys 10-1 2 10-1 1 10-1 0 10-9 10-8 10-7 10-6 10-12 10-1 1 10-10 10-9 10-8 10-7 10-6 J1 1C C-1 (1/4-T C T)J 1 1 C C-3 (1/2-T C T)CG R en v. (m/s)CG R ai r f o r Ni-A l l oy W e l d s (m/s)A l l o y 182 J-Groove W e l d (D av i s-B es s e C R DM N o z z l e #1 1)316°C P W R W a ter CG R env. = C G R ai r + 0.0 18(C G R ai r)0.78 S p eci m en #CGR ai r x 5 10-1 2 10-1 1 10-1 0 10-9 1 0 15 20 2 5 30 35 4 0 4 5 50 1/2-T C T 1/4-T C T E x pe r i menta l C G R (m/s)S t re s s I n t e n s i t y K (M P a*m 1/2)A l lo y 1 8 2 J-G r oov e W e l d D a v i s Be ss e No zz le #1 1 316°C Pro p o s ed Di sp o s it i on C u r v e All o y 182 W e ld M e ta l 10 Fracture surface of specimen J11CC-1 11 V.C. Summer alloys 12 Cyclic and SCC CGRs for V.C. Summer weld alloys 10-1 2 10-1 1 10-1 0 10-9 10-8 10-7 10-6 10-1 2 10-1 1 10-1 0 10-9 10-8 10-7 10-6 WC R-0 1 B CR-0 1 WL R-0 1 CGR en v (m/s)CGR ai r f o r N i-a ll o y W e ld s (m/s)All o y 18 2 S M A W e l d Sim u l a ted P W R W a te r at 320°C 10-1 2 10-1 1 10-1 0 10-9 10 2 0 3 0 40 50 WC R-0 1 B CR-0 1 WL R-0 1 A 8 2 w e ld , J a c k o e t a l.A 1 8 2 b u t t e r , Ja ck o e t a l.E x pe r i m e nta l C G R (m/s)S t re s s I n t e n s it y K (M P a*m 1/2)V.C. S u mm e r N i-A llo y W e l d M e tal 32 5°C Propos ed CG R C u r v e Al loy 182 13 Log-norm a l distribution of constant for several heats of Alloy 82 and 182.
0.0 0.2 0.4 0.6 0.8 1.0 10-1 3 10-1 2 10-1 1 A 1 8 2 A 8 2 A N L B CR-01 A N L W CR-0 1 A 1 8 2 Ja ck o e t a l.A 82 J a c k o et al.C u m u la t i v e Dis t r i b u t i o n F C o nsta n t i n S c ot t Mo de l a t 32 5°C 75t h Pe rce n til e 25t h P e r c en tile M e di an N i-A l l oy W e ld M e ta l 325°C 14 Fracture surface of VCS specimen BCR-01 15 Fracture surface of specimen V.C. Summer BCR-01 16 Fracture surface of V.C. Summer specimen WLR-01 17 Fracture surface of V.C. Summer specimen WLR-01 18 Additional observations 19 Fracture surface of J11CC-1 and BCR-01Cracks across the propagation front appear to impede crack advance 20 Fracture surfaces of Davis-Besse nozzle Alloy 600 specimensFracture mode seems to depend on the location of the specimen 21 SummaryThe cyclic CGRs for Alloy 182 and Alloy 82 weld specimens showed minimal environmental enhancement except for one specimenFor the Davis-Besse Alloy 182 weld specimens, the SCC CGRs under constant load are an order of magnit ude lower than the disposition curve proposed for Alloy 182 weld metals For the V.C. Summer weld specimens, the CGR data under constant load were lower than data obtained by others on the same alloys and lower than the proposed disposition curve