Presentation for 2016 Davis-Besse EOC Open House
ML17229B338
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/17/2017
From:
NRC/RGN-III
To:
FirstEnergy Nuclear Operating Co
References
Download: ML17229B338 (6)


Text

Davis-Besse Nuclear Power Station Annual Assessment Summary 2016 Reactor Oversight Process Nuclear Regulatory Commission - Region III

What We/NRC Regulate What It Includes Reactors Materials Safety Security Waste Environment What We Dont Regulate Assurance of Plant Safety Elements Continuous Training Long-Term Maintenance Military Radon Regulation Compliance Defense In-X-Rays Depth 1

How We Regulate Regulatory Framework NRCs Safety Mission Strategic Performance Areas Cornerstones Cross-Cutting Areas Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution Performance Indicators Significance Threshold Performance Indicators 17 Performance Indicators PIs for each cornerstone Green White Yellow Red Licensee submits data to NRC Increasing Safety Significance quarterly Inspection program verifies accuracy Inspection Findings Data available on NRC website Green White Yellow Red Increasing Safety Significance 2

Action Matrix Columns Industry-Wide Performance 90 86 80 As of 02/27/2017 Multiple/Repetitive 70 Licensee Regulatory Degraded Unacceptable Degraded Response Response Performance Performance 60 Cornerstone 50 40 30 20 10 Increasing: 10 0 3 0

  • Safety Significance 0 0
  • Inspection
  • Management Involvement
  • Regulatory Action Industry-Wide Inspection Findings Industry-Wide Performance Indicators Finding data current as of 2/22/2017 693 700 6713 7000 600 Calendar Year 6000 Calendar Year 500 2016 data 2016 data 5000 400 300 4000 200 3000 100 2000 2 4 0

0 1000 0 7 0 0 0

Green White Yellow Red 3

NRC Annual Assessment Summary NRC Inspection Activities DavisBesse Nuclear Power Station DavisBesse 2016 The Licensee, FirstEnergy Nuclear Operating Company, 5363 total hours expended by NRC on Reactor operated the station safely and in a manner that preserved the Oversight Process activities public health and safety and protected the environment Davis-Besse met all cornerstone objectives but was in the 2201 inspector hours of direct inspection activity Regulatory Response Column of the NRCs ROP Action Matrix 701 inspector hours reviewing and observing plant for all four quarters of 2016 operating status Through the third quarter of 2016 with one Greater-Than-Green finding identified (Security Cornerstone) from the last quarter of 1369 inspector hours of preparation for and 2015 and documentation of inspection activities White Performance Indicator for Unplanned Scrams with Complications (Initiating Events Cornerstone) in the first, third and 1092 hours0.0126 days <br />0.303 hours <br />0.00181 weeks <br />4.15506e-4 months <br /> for other Reactor Oversight Process fourth quarters of 2016.

elements (e.g., assessments and communications)

NRC plans baseline inspections at Davis-Besse in 2016 with one supplemental inspection associated with the White Performance Indicator NRC Inspection Activities Davis-Besse Nuclear Power Station DavisBesse Nuclear Power Station for 2016 PIs and Findings January 1 through December 31, 2016 2 resident inspectors on site - residents produced 1 White Performance Indicator (Scrams with Complications) in four quarterly inspection reports and walked first, third, and fourth quarters from scrams in the first and third through the plant daily quarters 17 other inspectors participated in various 15 Green/Severity Level IV findings which included:

Inadequate trend evaluation of 10 amp and 15 amp fuse inspections failures results in preventable fuse failures.

There were no major team inspections in 2016 Failure to address degraded turbine roof vents results in generator control cabinets water intrusion and a reactor trip Failure to provide appropriate work instructions for instrument seal assembly results in failure of some instrumentation designed for post-accident monitoring 4

Actions in Response to the NRC Social Media Japan Nuclear Accident Channels

  • Mailbox for comments on staff actions:

JLD_Public.Resource@nrc.gov

  • Office of Public Affairs Point of

Contact:

OPA.resource@nrc.gov or 301-415-8200

  • (301) 816-5100 (call collect)

Report a safety concern

  • (800) 695-7403
  • Allegation@nrc.gov General information or questions
  • www.nrc.gov Davis-Besse NRC Resident Inspectors
  • 419-244-4494 5