MONTHYEARML22222A1102022-07-21021 July 2022 KM Session Final ML22178A1952022-06-27027 June 2022 2021 Davis Besse Nuclear Power Station End-of-Cycle Meeting Presentation ML22028A3922022-02-0101 February 2022 Licensee Regulatory Conference Presentation ML22028A3972022-02-0101 February 2022 NRC Regulatory Conference Presentation ML21176A1992021-06-25025 June 2021 Slideshow Presentation for 2020 End -of-Cycle Public Meeting for Davis-Besse and Perry ML20210M0712020-07-27027 July 2020 Combined End-of-Cycle 2019 Public Meeting Slide Presentation ML19249D0212019-09-0606 September 2019 End-of-Cycle Summary Handout (2018) ML18310A3802018-11-0808 November 2018 Pre-Submittal Meeting Davis-Besse Nuclear Power Station (DB) Post-Shutdown Emergency Plan (PSEP) License Amendment Request ML18180A1962018-06-29029 June 2018 Slides for Davis Besse 2017 EOC Open House ML17229B3382017-08-17017 August 2017 Presentation for 2016 Davis-Besse EOC Open House ML16174A3152016-06-21021 June 2016 Annual Assessment Meeting Open House June 21, 2016 ML15156A6962015-06-11011 June 2015 Annual Assessment Meeting Open House Handout ML14224A1112014-08-25025 August 2014 Safety Culture Presentation for Brazil, U.S. Workshop on Safety and Security Culture - August 25, 2014 ML14218A0542014-08-0707 August 2014 Handout Davis-Besse EOC Mtg ML14050A4002014-02-20020 February 2014 NRC Presentation for Davis-Besse Steam Generator Replacement Webinar ML13322B3112013-11-13013 November 2013 NFPA 805 Transition - Meeting Slides, 11/13/2013 ML13294A5972013-10-21021 October 2013 FENOC Presentation Slides for Public Meeting September 24, 2013 ML13157A0642013-06-0606 June 2013 June 11, 2013 NRC Presentation ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML12269A0612012-09-26026 September 2012 FENOC Presentation for 2012-09-26 Public Meeting ML12227A4172012-08-15015 August 2012 NRC End-Of-Cycle Assessment 2011 Meeting Presentation ML12221A2642012-08-0909 August 2012 NRC Public Meeting NRC Presentation 8/9/12 ML12221A2682012-08-0909 August 2012 FENOC Shield Building Cracking Davis-Besse Public Meeting 8/9/12 ML12132A3442012-05-11011 May 2012 NRC-AERB Bilateral Meeting Slide Presentation (Nro/De), Aerb, India - May 16-17, 2012 ML1206901712012-02-29029 February 2012 Slides and View Graphs - Boric Acid Corrosion Testing Program: Industry Perspective ML12200A2402012-02-23023 February 2012 Presentation Slides on Davis-Besse Shield Building Crack ML1204402842012-02-16016 February 2012 Public Meeting Construction Experiences - Evaluate Impact of Concrete Degradation ML12004A0102012-01-0404 January 2012 Public Meeting NRC Slides ML12200A2492011-12-22022 December 2011 Presentation Slides on Shield Building /Containment Delamination ML11220A2542011-08-0101 August 2011 DBNPS-Info Meeting Slides ML1116400632011-06-15015 June 2011 EOC NRC Slides for Public Meeting ML1117209902011-06-15015 June 2011 Meeting Presentation NRC Annual Assessment Meeting: Davis-Besse Nuclear Power Station. ML1021501182010-07-29029 July 2010 Licensee Slides for Davis-Besse Annual Assessment Meeting ML1021501112010-07-29029 July 2010 NRC Slides for Davis-Besse; July 29, 2010; Annual Assessment Meeting L-02-002, G20100238/EDATS: OEDO-2010-0305 - Ltr. Tom Gurdziel, 2.206 - Firstenergy - Davis-Besse2010-04-15015 April 2010 G20100238/EDATS: OEDO-2010-0305 - Ltr. Tom Gurdziel, 2.206 - Firstenergy - Davis-Besse ML0920202972009-07-15015 July 2009 NRC Slides from EOC Meeting ML0920202872009-07-15015 July 2009 Meeting Slides, NRC Annual Assessment Meeting Davis-Besse Nuclear Power Station ML0725600562007-09-12012 September 2007 9/12/2007 Meeting to Discuss Davis-Besse License Amendment Request for Conversion to Improved Technical Specifications (ITS) 9/12/2007 NRC Meeting Slides ML0725600462007-09-11011 September 2007 9/11/2007-Meeting to Discuss Davis-Besse License Amendment Request for Conversion to Improved Technical Specifications (ITS) - 9/11/2007 NRC Meeting Slides ML0722201892007-08-0808 August 2007 NRC EOC Public Meeting Slides ML0717905962007-06-27027 June 2007 Slides from Public Meeting Between NRC and FENOC Regarding Response to May 14, 2007, Demand for Information ML0702603952007-01-31031 January 2007 Summary of Conference Telephone Call Regarding the Spring 2006 Steam Generator Inspections - Handouts ML0706502022007-01-23023 January 2007 Slides to Summary of Pre-Application Meeting with FENOC Proposed License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML0632003672006-12-11011 December 2006 Slides, Improved Technical Specification Conversion from Category 1 Pre-submittal Meeting with Fenco to Discuss Davis-Besse's' Proposed Conversion to Improved Technical Specifications ML0612404142006-05-0202 May 2006 NRC Annual Assessment Meeting ML0601801602006-01-18018 January 2006 Industry Safety Culture Presentation for January 18, 2006 Public Meeting ML0603002272006-01-10010 January 2006 Multi-Regional NRC Public Meeting Licensee (FENOC) Slide Presentation ML0802205572005-09-12012 September 2005 NRC Commissioners Briefing by Firstenergy Nuclear Operating Co ML0525604472005-08-17017 August 2005 B&W Owners Group Reactor Vessel Working Group Summary of the Plans of the B&Wog Reactor Vessel Integrity Program ML0526600162005-08-16016 August 2005 Mantg Conference, 8/16/05 - Plenary - Keynote Speech by Samuel J. Collins, Regional Administrator, Region I, the Changing Roles of the Operators and Trainers 2022-07-21
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23152A2022023-06-0101 June 2023 2022 Davis-Besse End-of-Cycle Meeting Presentation ML22222A1102022-07-21021 July 2022 KM Session Final ML22178A1952022-06-27027 June 2022 2021 Davis Besse Nuclear Power Station End-of-Cycle Meeting Presentation ML22028A3922022-02-0101 February 2022 Licensee Regulatory Conference Presentation ML22028A3972022-02-0101 February 2022 NRC Regulatory Conference Presentation ML21176A1992021-06-25025 June 2021 Slideshow Presentation for 2020 End -of-Cycle Public Meeting for Davis-Besse and Perry ML20210M0712020-07-27027 July 2020 Combined End-of-Cycle 2019 Public Meeting Slide Presentation ML19249D0212019-09-0606 September 2019 End-of-Cycle Summary Handout (2018) ML18310A3802018-11-0808 November 2018 Pre-Submittal Meeting Davis-Besse Nuclear Power Station (DB) Post-Shutdown Emergency Plan (PSEP) License Amendment Request ML18180A1962018-06-29029 June 2018 Slides for Davis Besse 2017 EOC Open House ML17229B3382017-08-17017 August 2017 Presentation for 2016 Davis-Besse EOC Open House ML16174A3152016-06-21021 June 2016 Annual Assessment Meeting Open House June 21, 2016 ML16117A1822016-04-22022 April 2016 Industry Slides for the Spring 2016 Conference Call Regarding the Steam Generator Tube Inservice Inspections ML15156A6962015-06-11011 June 2015 Annual Assessment Meeting Open House Handout ML14224A1112014-08-25025 August 2014 Safety Culture Presentation for Brazil, U.S. Workshop on Safety and Security Culture - August 25, 2014 ML14218A0542014-08-0707 August 2014 Handout Davis-Besse EOC Mtg ML14050A4002014-02-20020 February 2014 NRC Presentation for Davis-Besse Steam Generator Replacement Webinar ML13322B3112013-11-13013 November 2013 NFPA 805 Transition - Meeting Slides, 11/13/2013 ML13294A5972013-10-21021 October 2013 FENOC Presentation Slides for Public Meeting September 24, 2013 ML13220A0632013-08-30030 August 2013 Dsd ED2013 3267 Presentation, Primary Water Stress Corrosion Cracking Tests and Metallurgical Analyses of Davis-Besse Control Rod Drive Mechanism Nozzle #4. ML13157A0642013-06-0606 June 2013 June 11, 2013 NRC Presentation ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML13078A2492013-03-20020 March 2013 Project Overview-Public Mtg 3-20-13 Non Proprietary ML12269A0612012-09-26026 September 2012 FENOC Presentation for 2012-09-26 Public Meeting ML12227A4172012-08-15015 August 2012 NRC End-Of-Cycle Assessment 2011 Meeting Presentation ML12221A2642012-08-0909 August 2012 NRC Public Meeting NRC Presentation 8/9/12 ML12221A2682012-08-0909 August 2012 FENOC Shield Building Cracking Davis-Besse Public Meeting 8/9/12 ML12138A0732012-05-14014 May 2012 FENOC-Davis-Besse Nuclear Power Station, Unit 1 Docket No. 50-346, License No. NPF-3 Submittal of Contractor Root Cause Assessment Report-Section 5 ML12132A3442012-05-11011 May 2012 NRC-AERB Bilateral Meeting Slide Presentation (Nro/De), Aerb, India - May 16-17, 2012 ML1206901712012-02-29029 February 2012 Slides and View Graphs - Boric Acid Corrosion Testing Program: Industry Perspective ML12200A2402012-02-23023 February 2012 Presentation Slides on Davis-Besse Shield Building Crack ML1204402842012-02-16016 February 2012 Public Meeting Construction Experiences - Evaluate Impact of Concrete Degradation ML1200501462012-01-0505 January 2012 Public Meeting FENOC Slides ML12004A0102012-01-0404 January 2012 Public Meeting NRC Slides ML12200A2492011-12-22022 December 2011 Presentation Slides on Shield Building /Containment Delamination ML11220A2542011-08-0101 August 2011 DBNPS-Info Meeting Slides ML11221A3012011-08-0101 August 2011 521- R326C B&W Tech Cross Training - Chapter 16 Davis-Besse Loss of All Feedwater ML1117303602011-06-21021 June 2011 FENOC Licensee Slides for 6-21-11 All FENOC Meeting ML1116400632011-06-15015 June 2011 EOC NRC Slides for Public Meeting ML1117209902011-06-15015 June 2011 Meeting Presentation NRC Annual Assessment Meeting: Davis-Besse Nuclear Power Station. ML1032103472010-11-16016 November 2010 FENOC 11/16/10 Public Meeting Presentation Slides ML1025103462010-09-0909 September 2010 SIT Exit Meeting Presentation Slides ML1021501112010-07-29029 July 2010 NRC Slides for Davis-Besse; July 29, 2010; Annual Assessment Meeting ML1021501182010-07-29029 July 2010 Licensee Slides for Davis-Besse Annual Assessment Meeting ML1015400332010-06-0303 June 2010 Licensee Slides for June 3, 2010 Public Meeting Presentation ML1015400342010-06-0303 June 2010 NRC Slides for June 3, 2010 Public Meeting Presentation ML1009102662010-03-31031 March 2010 Slides FENOC and NRC Senior Management Briefing, 3-31-10 ML0920202872009-07-15015 July 2009 Meeting Slides, NRC Annual Assessment Meeting Davis-Besse Nuclear Power Station ML0920202972009-07-15015 July 2009 NRC Slides from EOC Meeting ML0814104322008-05-13013 May 2008 Meeting Slides, Davis-Besse Annual Assessment Meeting, Reactor Oversight Program - Cy 2007 2023-06-01
[Table view] |
Text
Davis-Besse Nuclear Power Station Annual Assessment Summary 2016 Reactor Oversight Process Nuclear Regulatory Commission - Region III
What We/NRC Regulate What It Includes Reactors Materials Safety Security Waste Environment What We Dont Regulate Assurance of Plant Safety Elements Continuous Training Long-Term Maintenance Military Radon Regulation Compliance Defense In-X-Rays Depth 1
How We Regulate Regulatory Framework NRCs Safety Mission Strategic Performance Areas Cornerstones Cross-Cutting Areas Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution Performance Indicators Significance Threshold Performance Indicators 17 Performance Indicators PIs for each cornerstone Green White Yellow Red Licensee submits data to NRC Increasing Safety Significance quarterly Inspection program verifies accuracy Inspection Findings Data available on NRC website Green White Yellow Red Increasing Safety Significance 2
Action Matrix Columns Industry-Wide Performance 90 86 80 As of 02/27/2017 Multiple/Repetitive 70 Licensee Regulatory Degraded Unacceptable Degraded Response Response Performance Performance 60 Cornerstone 50 40 30 20 10 Increasing: 10 0 3 0
- Regulatory Action Industry-Wide Inspection Findings Industry-Wide Performance Indicators Finding data current as of 2/22/2017 693 700 6713 7000 600 Calendar Year 6000 Calendar Year 500 2016 data 2016 data 5000 400 300 4000 200 3000 100 2000 2 4 0
0 1000 0 7 0 0 0
Green White Yellow Red 3
NRC Annual Assessment Summary NRC Inspection Activities DavisBesse Nuclear Power Station DavisBesse 2016 The Licensee, FirstEnergy Nuclear Operating Company, 5363 total hours expended by NRC on Reactor operated the station safely and in a manner that preserved the Oversight Process activities public health and safety and protected the environment Davis-Besse met all cornerstone objectives but was in the 2201 inspector hours of direct inspection activity Regulatory Response Column of the NRCs ROP Action Matrix 701 inspector hours reviewing and observing plant for all four quarters of 2016 operating status Through the third quarter of 2016 with one Greater-Than-Green finding identified (Security Cornerstone) from the last quarter of 1369 inspector hours of preparation for and 2015 and documentation of inspection activities White Performance Indicator for Unplanned Scrams with Complications (Initiating Events Cornerstone) in the first, third and 1092 hours0.0126 days <br />0.303 hours <br />0.00181 weeks <br />4.15506e-4 months <br /> for other Reactor Oversight Process fourth quarters of 2016.
elements (e.g., assessments and communications)
NRC plans baseline inspections at Davis-Besse in 2016 with one supplemental inspection associated with the White Performance Indicator NRC Inspection Activities Davis-Besse Nuclear Power Station DavisBesse Nuclear Power Station for 2016 PIs and Findings January 1 through December 31, 2016 2 resident inspectors on site - residents produced 1 White Performance Indicator (Scrams with Complications) in four quarterly inspection reports and walked first, third, and fourth quarters from scrams in the first and third through the plant daily quarters 17 other inspectors participated in various 15 Green/Severity Level IV findings which included:
Inadequate trend evaluation of 10 amp and 15 amp fuse inspections failures results in preventable fuse failures.
There were no major team inspections in 2016 Failure to address degraded turbine roof vents results in generator control cabinets water intrusion and a reactor trip Failure to provide appropriate work instructions for instrument seal assembly results in failure of some instrumentation designed for post-accident monitoring 4
Actions in Response to the NRC Social Media Japan Nuclear Accident Channels
- Mailbox for comments on staff actions:
JLD_Public.Resource@nrc.gov
- Office of Public Affairs Point of
Contact:
OPA.resource@nrc.gov or 301-415-8200
- (301) 816-5100 (call collect)
Report a safety concern
- Allegation@nrc.gov General information or questions
- www.nrc.gov Davis-Besse NRC Resident Inspectors