MONTHYEARML22222A1102022-07-21021 July 2022 KM Session Final ML22178A1952022-06-27027 June 2022 2021 Davis Besse Nuclear Power Station End-of-Cycle Meeting Presentation ML22028A3922022-02-0101 February 2022 Licensee Regulatory Conference Presentation ML22028A3972022-02-0101 February 2022 NRC Regulatory Conference Presentation ML21176A1992021-06-25025 June 2021 Slideshow Presentation for 2020 End -of-Cycle Public Meeting for Davis-Besse and Perry ML20210M0712020-07-27027 July 2020 Combined End-of-Cycle 2019 Public Meeting Slide Presentation ML19249D0212019-09-0606 September 2019 End-of-Cycle Summary Handout (2018) ML18310A3802018-11-0808 November 2018 Pre-Submittal Meeting Davis-Besse Nuclear Power Station (DB) Post-Shutdown Emergency Plan (PSEP) License Amendment Request ML18180A1962018-06-29029 June 2018 Slides for Davis Besse 2017 EOC Open House ML17229B3382017-08-17017 August 2017 Presentation for 2016 Davis-Besse EOC Open House ML16174A3152016-06-21021 June 2016 Annual Assessment Meeting Open House June 21, 2016 ML15156A6962015-06-11011 June 2015 Annual Assessment Meeting Open House Handout ML14224A1112014-08-25025 August 2014 Safety Culture Presentation for Brazil, U.S. Workshop on Safety and Security Culture - August 25, 2014 ML14218A0542014-08-0707 August 2014 Handout Davis-Besse EOC Mtg ML14050A4002014-02-20020 February 2014 NRC Presentation for Davis-Besse Steam Generator Replacement Webinar ML13322B3112013-11-13013 November 2013 NFPA 805 Transition - Meeting Slides, 11/13/2013 ML13294A5972013-10-21021 October 2013 FENOC Presentation Slides for Public Meeting September 24, 2013 ML13157A0642013-06-0606 June 2013 June 11, 2013 NRC Presentation ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML12269A0612012-09-26026 September 2012 FENOC Presentation for 2012-09-26 Public Meeting ML12227A4172012-08-15015 August 2012 NRC End-Of-Cycle Assessment 2011 Meeting Presentation ML12221A2642012-08-0909 August 2012 NRC Public Meeting NRC Presentation 8/9/12 ML12221A2682012-08-0909 August 2012 FENOC Shield Building Cracking Davis-Besse Public Meeting 8/9/12 ML12132A3442012-05-11011 May 2012 NRC-AERB Bilateral Meeting Slide Presentation (Nro/De), Aerb, India - May 16-17, 2012 ML1206901712012-02-29029 February 2012 Slides and View Graphs - Boric Acid Corrosion Testing Program: Industry Perspective ML12200A2402012-02-23023 February 2012 Presentation Slides on Davis-Besse Shield Building Crack ML1204402842012-02-16016 February 2012 Public Meeting Construction Experiences - Evaluate Impact of Concrete Degradation ML12004A0102012-01-0404 January 2012 Public Meeting NRC Slides ML12200A2492011-12-22022 December 2011 Presentation Slides on Shield Building /Containment Delamination ML11220A2542011-08-0101 August 2011 DBNPS-Info Meeting Slides ML1116400632011-06-15015 June 2011 EOC NRC Slides for Public Meeting ML1117209902011-06-15015 June 2011 Meeting Presentation NRC Annual Assessment Meeting: Davis-Besse Nuclear Power Station. ML1021501182010-07-29029 July 2010 Licensee Slides for Davis-Besse Annual Assessment Meeting ML1021501112010-07-29029 July 2010 NRC Slides for Davis-Besse; July 29, 2010; Annual Assessment Meeting L-02-002, G20100238/EDATS: OEDO-2010-0305 - Ltr. Tom Gurdziel, 2.206 - Firstenergy - Davis-Besse2010-04-15015 April 2010 G20100238/EDATS: OEDO-2010-0305 - Ltr. Tom Gurdziel, 2.206 - Firstenergy - Davis-Besse ML0920202972009-07-15015 July 2009 NRC Slides from EOC Meeting ML0920202872009-07-15015 July 2009 Meeting Slides, NRC Annual Assessment Meeting Davis-Besse Nuclear Power Station ML0725600562007-09-12012 September 2007 9/12/2007 Meeting to Discuss Davis-Besse License Amendment Request for Conversion to Improved Technical Specifications (ITS) 9/12/2007 NRC Meeting Slides ML0725600462007-09-11011 September 2007 9/11/2007-Meeting to Discuss Davis-Besse License Amendment Request for Conversion to Improved Technical Specifications (ITS) - 9/11/2007 NRC Meeting Slides ML0722201892007-08-0808 August 2007 NRC EOC Public Meeting Slides ML0717905962007-06-27027 June 2007 Slides from Public Meeting Between NRC and FENOC Regarding Response to May 14, 2007, Demand for Information ML0702603952007-01-31031 January 2007 Summary of Conference Telephone Call Regarding the Spring 2006 Steam Generator Inspections - Handouts ML0706502022007-01-23023 January 2007 Slides to Summary of Pre-Application Meeting with FENOC Proposed License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML0632003672006-12-11011 December 2006 Slides, Improved Technical Specification Conversion from Category 1 Pre-submittal Meeting with Fenco to Discuss Davis-Besse's' Proposed Conversion to Improved Technical Specifications ML0612404142006-05-0202 May 2006 NRC Annual Assessment Meeting ML0601801602006-01-18018 January 2006 Industry Safety Culture Presentation for January 18, 2006 Public Meeting ML0603002272006-01-10010 January 2006 Multi-Regional NRC Public Meeting Licensee (FENOC) Slide Presentation ML0802205572005-09-12012 September 2005 NRC Commissioners Briefing by Firstenergy Nuclear Operating Co ML0525604472005-08-17017 August 2005 B&W Owners Group Reactor Vessel Working Group Summary of the Plans of the B&Wog Reactor Vessel Integrity Program ML0526600162005-08-16016 August 2005 Mantg Conference, 8/16/05 - Plenary - Keynote Speech by Samuel J. Collins, Regional Administrator, Region I, the Changing Roles of the Operators and Trainers 2022-07-21
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23152A2022023-06-0101 June 2023 2022 Davis-Besse End-of-Cycle Meeting Presentation ML22222A1102022-07-21021 July 2022 KM Session Final ML22178A1952022-06-27027 June 2022 2021 Davis Besse Nuclear Power Station End-of-Cycle Meeting Presentation ML22028A3922022-02-0101 February 2022 Licensee Regulatory Conference Presentation ML22028A3972022-02-0101 February 2022 NRC Regulatory Conference Presentation ML21176A1992021-06-25025 June 2021 Slideshow Presentation for 2020 End -of-Cycle Public Meeting for Davis-Besse and Perry ML20210M0712020-07-27027 July 2020 Combined End-of-Cycle 2019 Public Meeting Slide Presentation ML19249D0212019-09-0606 September 2019 End-of-Cycle Summary Handout (2018) ML18310A3802018-11-0808 November 2018 Pre-Submittal Meeting Davis-Besse Nuclear Power Station (DB) Post-Shutdown Emergency Plan (PSEP) License Amendment Request ML18180A1962018-06-29029 June 2018 Slides for Davis Besse 2017 EOC Open House ML17229B3382017-08-17017 August 2017 Presentation for 2016 Davis-Besse EOC Open House ML16174A3152016-06-21021 June 2016 Annual Assessment Meeting Open House June 21, 2016 ML16117A1822016-04-22022 April 2016 Industry Slides for the Spring 2016 Conference Call Regarding the Steam Generator Tube Inservice Inspections ML15156A6962015-06-11011 June 2015 Annual Assessment Meeting Open House Handout ML14224A1112014-08-25025 August 2014 Safety Culture Presentation for Brazil, U.S. Workshop on Safety and Security Culture - August 25, 2014 ML14218A0542014-08-0707 August 2014 Handout Davis-Besse EOC Mtg ML14050A4002014-02-20020 February 2014 NRC Presentation for Davis-Besse Steam Generator Replacement Webinar ML13322B3112013-11-13013 November 2013 NFPA 805 Transition - Meeting Slides, 11/13/2013 ML13294A5972013-10-21021 October 2013 FENOC Presentation Slides for Public Meeting September 24, 2013 ML13220A0632013-08-30030 August 2013 Dsd ED2013 3267 Presentation, Primary Water Stress Corrosion Cracking Tests and Metallurgical Analyses of Davis-Besse Control Rod Drive Mechanism Nozzle #4. ML13157A0642013-06-0606 June 2013 June 11, 2013 NRC Presentation ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML13078A2492013-03-20020 March 2013 Project Overview-Public Mtg 3-20-13 Non Proprietary ML12269A0612012-09-26026 September 2012 FENOC Presentation for 2012-09-26 Public Meeting ML12227A4172012-08-15015 August 2012 NRC End-Of-Cycle Assessment 2011 Meeting Presentation ML12221A2642012-08-0909 August 2012 NRC Public Meeting NRC Presentation 8/9/12 ML12221A2682012-08-0909 August 2012 FENOC Shield Building Cracking Davis-Besse Public Meeting 8/9/12 ML12138A0732012-05-14014 May 2012 FENOC-Davis-Besse Nuclear Power Station, Unit 1 Docket No. 50-346, License No. NPF-3 Submittal of Contractor Root Cause Assessment Report-Section 5 ML12132A3442012-05-11011 May 2012 NRC-AERB Bilateral Meeting Slide Presentation (Nro/De), Aerb, India - May 16-17, 2012 ML1206901712012-02-29029 February 2012 Slides and View Graphs - Boric Acid Corrosion Testing Program: Industry Perspective ML12200A2402012-02-23023 February 2012 Presentation Slides on Davis-Besse Shield Building Crack ML1204402842012-02-16016 February 2012 Public Meeting Construction Experiences - Evaluate Impact of Concrete Degradation ML1200501462012-01-0505 January 2012 Public Meeting FENOC Slides ML12004A0102012-01-0404 January 2012 Public Meeting NRC Slides ML12200A2492011-12-22022 December 2011 Presentation Slides on Shield Building /Containment Delamination ML11220A2542011-08-0101 August 2011 DBNPS-Info Meeting Slides ML11221A3012011-08-0101 August 2011 521- R326C B&W Tech Cross Training - Chapter 16 Davis-Besse Loss of All Feedwater ML1117303602011-06-21021 June 2011 FENOC Licensee Slides for 6-21-11 All FENOC Meeting ML1116400632011-06-15015 June 2011 EOC NRC Slides for Public Meeting ML1117209902011-06-15015 June 2011 Meeting Presentation NRC Annual Assessment Meeting: Davis-Besse Nuclear Power Station. ML1032103472010-11-16016 November 2010 FENOC 11/16/10 Public Meeting Presentation Slides ML1025103462010-09-0909 September 2010 SIT Exit Meeting Presentation Slides ML1021501112010-07-29029 July 2010 NRC Slides for Davis-Besse; July 29, 2010; Annual Assessment Meeting ML1021501182010-07-29029 July 2010 Licensee Slides for Davis-Besse Annual Assessment Meeting ML1015400332010-06-0303 June 2010 Licensee Slides for June 3, 2010 Public Meeting Presentation ML1015400342010-06-0303 June 2010 NRC Slides for June 3, 2010 Public Meeting Presentation ML1009102662010-03-31031 March 2010 Slides FENOC and NRC Senior Management Briefing, 3-31-10 ML0920202872009-07-15015 July 2009 Meeting Slides, NRC Annual Assessment Meeting Davis-Besse Nuclear Power Station ML0920202972009-07-15015 July 2009 NRC Slides from EOC Meeting ML0814104322008-05-13013 May 2008 Meeting Slides, Davis-Besse Annual Assessment Meeting, Reactor Oversight Program - Cy 2007 2023-06-01
[Table view] |
Text
Davis-Besse Nuclear Power Station Annual Assessment Meeting Open House June 21, 2016 2015 Reactor Oversight Process Nuclear Regulatory Commission - Region III
Our Mission To license and regulate the nations civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.
2
What We Regulate Reactors Materials Waste
What We Dont Regulate Military Radon X-Rays
Some Nuclear Facts
- 100 nuclear power plants supply about 20 percent of the electricity in the U.S.
- Nuclear materials are used in medicine for diagnosis and cancer treatment.
- Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and irradiators.
5
NRC Performance Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection in the secure use and management of radioactive materials 6
How We Regulate Regulatory Framework NRCs Safety Mission Strategic Performance Areas Cornerstones Cross-Cutting Areas Human Performance--Safety Conscious Work Environment--Problem Identification &
Resolution
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response 9
Significance Threshold Performance Indicators Green White Yellow Red Increasing Safety Significance Inspection Findings Green White Yellow Red Increasing Safety Significance
Action Matrix Columns Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Degraded Performance Increasing
National Summary of Plant Performance Status as of 02/22/2016 Licensee Response 90 Regulatory Response 7 Degraded Cornerstone 0 Multiple/Repetitive Deg. Cornerstone 3 Unacceptable 0 IMC 0350 Oversight 0 Total 100 12
National Summary
- Performance Indicator Results for 2015*
- Green 6686
- White 12
- Yellow 0
- Red 0
- PIs are counted per plant per quarter
- Total Inspection Findings in 2015#
- Green 782
- White 8
- Yellow 0
- Red 0
- Finding data current as of 2/22/2016 13
NRC Annual Assessment Summary Davis-Besse Nuclear Power Station FirstEnergy Nuclear Operating Company operated the station safely and in a manner that preserved the public health and safety and protected the environment.
Davis-Besse was in the Licensee Response Column of the NRCs Action Matrix in the third quarter of 2015 Davis-Besse was in the Regulatory Response Column in first, second, and fourth quarters of 2015 due to one or more Greater-than-Green violations associated with the Physical Protection cornerstone No Cross-Cutting Themes were identified 14 14
NRC Inspection Activities Davis-Besse 2015 5761 total hours expended by NRC on Reactor Oversight Process activities 2429 inspector hours of direct inspection activity 638 inspector hours reviewing and observing plant operating status 1500 inspector hours of preparation for and documentation of inspection activities 1194 hours0.0138 days <br />0.332 hours <br />0.00197 weeks <br />4.54317e-4 months <br /> for other Reactor Oversight Process elements (e.g., assessments and communications) 15
NRC Inspection Activities Davis-Besse Nuclear Power Station for 2015 2 resident inspectors on site - residents produced four quarterly inspection reports and walked through the plant daily 24 other inspectors participated in various inspections 3 major team inspections Supplemental Inspection for a Regulatory Response column entry Component Design Basis Inspection Biennial Problem Identification and Resolution Inspection 16
Significance Threshold Performance Indicators Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue 17
Davis-Besse PIs and Findings January 1 through December 31, 2015 All Green Performance Indicators 9 Green/Severity Level IV Inspection Findings 1 or more Greater-Than-Green Inspection Findings associated with the Security Cornerstone 18
Safety Significant Findings Davis-Besse Nuclear Power Station One or more Greater-Than-Green Findings carryover from 2014 Corrective Actions Found Sufficient during Inspection in Second Quarter of 2015 Davis-Besse transitioned to Licensee Response Column at beginning of third quarter 2015 One or more Greater-Than-Green Findings in fourth quarter of 2015 Davis-Besse transitioned to Regulatory Response Column at beginning of fourth quarter 2015
NRC Inspection Findings Some Examples of Green Findings Davis-Besse Nuclear Power Station Failure to maintain Flow-Accelerated Corrosion Computer Model results in a non-safety piping failure Failure to install and control reactor coolant pump seal vent flexible hoses per design analyses Failure to request and obtain a license amendment for use of an unreviewed method of analysis for the capability of the shield building 20
NRC Inspection Plans for 2016 Davis-Besse Nuclear Plant NRC Plans Baseline Inspections for 2016 This includes the following major team inspections:
Post License Renewal Inspection (completed)
Triennial Fire Protection Inspection Initial Reactor Operator License Examinations Supplemental Inspection for one or more Greater-Than-Green inspection findings 21
Davis-Besse Fukushima Recommendations Status Mitigating Strategies (MS) & Spent Fuel Pool Instrumentation (SFPI) Order
- MS Order requires strategies to cope with a long term loss of safety systems
- SFPI Order requires plants to be able to tell if water is at or above certain levels
- Site Audit was performed in November 2015
- Site Safety Evaluation scheduled to be issued after the NRC receives the site compliance letter
- Regional inspection of MS inspection (TI 191, Rev 1) will be performed after Safety Evaluation issued 22
Davis-Besse Fukushima Flooding Response Status
- Flooding Hazard Reevaluations
- Reevaluate Hazards using present-Day information
- Flooding Was Submitted March 2015
- Staff assessments will be issued by December 2016
- Inspectors completed TI-190 which verified a licensees interim actions were appropriate to mitigate the reevaluated flood levels.
- Licensees will address the reevaluated flood heights as part of their Mitigating Strategies Assessment, and if impacted take one of four potential paths:
- 1) No change; 2) procedural change;
- 3) physical modifications; 4) Revised Mitigating Strategies 23
Davis-Besse Fukushima Seismic Response Status
- Verify that the site can meet its current requirements for hazard protection
- Walkdowns are complete; Staff assessments issued
- Seismic Hazard Reevaluations
- Reevaluate Hazards using present-Day information
- Seismic Reevaluations submitted March 31, 2014
- NRC assessment of the licensee submittal was issued on August 25, 2015
- NRC assessment in letter dated October 27, 2015, stated that a full seismic risk evaluation was not required
- Sites will evaluate the impacts of the updated Seismic hazards as part of their mitigating strategies assessment.
24
Actions in Response to the Japan Nuclear Accident
- Mailbox for comments on staff actions:
JLD_Public.Resource@nrc.gov
- Office of Public Affairs Point of
Contact:
OPA.resource@nrc.gov or 301-415-8200 25
NRC Social Media Channels
Reference Sources
- Reactor Oversight Process
- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html
- Public Electronic Reading Room
- http://www.nrc.gov/reading-rm.html
- Public Document Room 800-397-4209 (Toll Free) 27