ML18067A422: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 5: Line 5:
| author name = Tabatabai O
| author name = Tabatabai O
| author affiliation = NRC/NRO/DNRL/LB1
| author affiliation = NRC/NRO/DNRL/LB1
| addressee name = Lee S S
| addressee name = Lee S
| addressee affiliation = NRC/NRO/DNRL/LB1
| addressee affiliation = NRC/NRO/DNRL/LB1
| docket = 05200048
| docket = 05200048

Revision as of 19:06, 17 June 2019

03/06/2018 Summary Public Meeting with Nuscale Regarding RAIs 8934 and 8858
ML18067A422
Person / Time
Site: NuScale
Issue date: 03/12/2018
From: Omid Tabatabai
NRC/NRO/DNRL/LB1
To: Samson Lee
NRC/NRO/DNRL/LB1
Tabatabai O
References
Download: ML18067A422 (5)


Text

March 12, 2018 MEMORANDUM TO: Samuel S. Lee, Chief Licensing Branch 1 Division of New Reactor Licensing Office of New Reactors

FROM: Omid Tabatabai, Senior Project Manager /RA/ Licensing Branch 1 Division of New Reactor Licensing Office of New Reactors

SUBJECT:

SUMMARY

OF THE MARCH 6, 2018, PUBLIC MEETING WITH NUSCALE POWER, LLC, TO DISCUSS THE U.S. NUCLEAR REGULATORY COMMISSION STAFF REQUEST FOR ADDITIONAL INFORMATION NOS. 8934 AND 8858

On March 6, 2018, representatives of the U.S. Nuclear Regulatory Commission (NRC) and

NuScale Power, LLC (NuScale) held a public teleconference meeting to discuss the NRC staff's Request for Additional Information (RAI) Nos. 8934 and 8858. These RAIs were issued to NuScale regarding its design certification application, Tier 2, Chapter 3, "Design of Structures, Systems, Components and Equipment," specifically, Sections 3.7.2, "Seismic Systems Analysis," and 3.8.2, "Steel Containment."

captures the summary of the topics discussed during the teleconference. The agenda and list of meeting attendees are included in Enclosures 2 and 3, respectively. The meeting notice for this meeting is available in the Agencywide Documents Access and Management System under Accession No. ML18064A372.

Docket No.52-048

Enclosures:

1. Meeting Summary
2. Agenda
3. Attendees

CONTACT: Omid Tabatabai, NRO/DNRL 301-415-6616

ML18067A422 *via email NRC-001OFFICE NRO/DNRL/LB1:PM NRO/DNRL/LB1:LA* NRO/DEI/SEB:BC*NRO/DEI/MEB:BC* NRO/DNRL/LB1:PMNAME OTabatabai MMoore SSamadar TLupold OTabatabai DATE 3/8/2018 3/12/2018 3/12/2018 3/12/2018 3/12/2018 Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION

SUMMARY

OF THE MARCH 6, 2018, TELECONFERENCE WITH NUSCALE POWER, LLC TO DISCUSS NUSCALE RESPONSE TO STAFF RAIS 8934 and 8858 The U.S. Nuclear Regulatory Commission (NRC) staff requested this public meeting to get a clarification from NuScale Power, LLC (NuScale) regarding NuScale's response to staff's RAIs 8858, Question 3.8.2-13 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML17300B428) and RAI 8934, Question 03.07.02-15 (ADAMS Accession No.

ML17355A678).

Regarding NuScale's response to RAI 8858, the NRC staff requested NuScale to clarify its response and interpretation of the American Society for Mechanical Engineers (ASME) boiler and pressure vessel (BPV), Class 1 Components (NB), Codes that apply to defining the boundary for the valve attachment weld. NuScale agreed that the reference to NB-1132-2(g) in the response to RAI 8858, Question 03.08.02-13, was incorrect and NuScale agreed to revise/supplement its response and reference NB-1131(a).

Regarding NuScale's response to RAI 8934, the NRC staff requested NuScale to clarify its response with respect to the additional hydrodynamic pressure due to fluid-structure interaction effect of the reactor pool and to provide a FSAR markup that summarizes the relevant information provided in the RAI response. NuScale representatives agreed to provide a clarification and FSAR markup in its supplement response to the RAI question.

Prior to concluding the meeting, the NRC staff also provided a status update regarding NuScale's response to RAI 8858, Questions 03.08.02-4, 03.08.02-5, and 03.08.02-6.

Specifically, the NRC staff informed NuScale that questions 03.08.02-4 and 03.08.02-5 have been dispositioned as resolved-closed, and question 03.08.02-6 has been dispositioned as unresolved-closed.

NuScale also agreed to submit its supplemental response to RAI 8858, Question 3.8.2-13, within 30 days, i.e., April 6, 2018, and its supplemental response to RAI 8934, Question 03.07.02-15, within 60 days from the public meeting date, i.e., May 6, 2018.

Enclosure 2 U.S. NUCLEAR REGULATORY COMMISSION

SUMMARY

OF THE March 6, 2018, TELECONFERENCE WITH NUSCALE POWER, LLC MEETING AGENDA

Time Topic Lead 1:00 - 1:10 pm Meeting Introductions NRC/NuScale 1:10 - 1:55 pm Discussion of NuScale Response to RAIs 8934 and 8858 NRC/NuScale 1:55 - 2:00 pm Public Comments/Questions Public Enclosure 3 U.S. NUCLEAR REGULATORY COMMISSION

SUMMARY

OF THE March 6, 2018, TELECONFERENCE WITH NUSCALE POWER, LLC LIST OF ATTENDEES

NuScale Power, LLC Kyra Perkins Wayne Massie Mohsen Azadbakht

Hadi Razavi Josh Parker Mohsin Khan

Ed Heald U.S. Nuclear Regulatory Commission Staff Omid Tabatabai Tim Lupold Jason Huang

Pravin Patel

Manas Chakravorti Sunwoo Park Robert Roche-Rivera

Yuken Wong