April 2003 Monthly Operating Report for Waterford 3 Ses
ML031350751
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/08/2003
From: Sen G
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
A4.05, W3F1-2003-0040
Download: ML031350751 (7)


Text

Entergy Operations, Inc.

17265 River Road tergy Killona, LA 70066 Tel 504 739 6650 W3Fl -2003-0040 A4.05 PR May 8, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject report which covers the operating statistics for the month of April, 2003. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

There are no commitments associated with this submittal. Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.

Very truly yours, G. Sen Licensing Manager GS/TMM/cbh Attachment

Monthly Operating Report W3F1 -2003-0040 Page 2 May 8, 2003 cc: (w/Attachment)

E.W. Merschoff (NRC Region IV)

N. Kalyanam (NRC-NRR)

J. Smith N.S. Reynolds B. Lewis (Plafts Energy),

lerevents@inpo.org - INPO Records Center NRC Resident Inspectors Office

NRC MONTHLY OPERATING REPORT WATERFORD 3 for April, 2003

SUMMARY

OF OPERATIONS The unit operated at an average reactor power level of 99.8% during the period.

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES There were no pressurizer safety valve failures or challenges experienced during the month.

5/7/203 Page: 1 of 5

OPERATING DATA REPORT DOCKET NUMBER: 50-382

. 'UNIT NAME: WATERFORD 3 DATE OF REPORT: May 7, 2003 COMPLETED BY: Jim Pollock TELEPHONE: (504) 739-6561 OPERATING STATUS

1. Reporting Period  : April, 2003 Gross Hours in Reporting Period  : 719
2. Currently Authorized Power Level (MWt)  : 3,441 Maximum Dependable Capacity (Net MWe) : 1,075 Design Electrical Rating (Net MWe)  : 1,104
3. Power Level to which Restricted (if any) (Net MWe) N/A
4. Reason for Restriction (if any) N/A THIS YEAR TO MONTH DATE CUMULATIVE
5. Number of Hours Reactor was Critical 719.0 2,834.1 133,083.3
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator was On-line 719.0 2,781.3 131,743.8
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2,470,264 9,557,698 439,291,649
10. Gross Electrical Energy Generated (MWH) 826,617 3,196,165 147,226,276
11. Net Electrical Energy Generated (MWH) 793,531 3,067,576 140,647,810
12. Reactor Service Factor 100.0 98.4 86.3
13. Reactor Availability Factor 100.0 98.4 86.3
14. Unit Service Factor 100.0 96.6 85.4
15. Unit Availability Factor 100.0 96.6 85.4
16. Unit Capacity Factor (using MDC) 102.7 99.1 84.8
17. Unit Capacity Factor (using DER) 100.0 96.5 82.6
18. Unit Forced Outage Rate 0.0 3.4 3.7 5n12oo3 Page: 2 of

i OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: May 7, 2003 COMPLETED BY: Jim Pollock TELEPHONE: (504) 739-6561 OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each):

REFUEL OUTAGE #12 - commencing on October 17, 2003 - 25 day outage

20. If Shutdown at end of report period, estimated date of startup: NIA
21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 719 2,879 154,272
23. Unit Forced Outage Hours 0.0 97.7 4,995.6
24. Nameplate Rating (Gross MWe)  : 1,200 Max. Dependable Capacity (Gross MWe)  : 1,120
25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons:

N/A sm12003 Page: 3 of 5

. AVERAGE L, . i PWR LE VE L AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER: 50-382

- UNIT NAME: WATERFORD 3 DATE OF REPORT: May 7, 2003 COMPLETED BY: Jim Pollock TELEPHONE: (504) 739-6561 Reporting Period: April, 2003 (NET MWe)

DAY Avg. Power Level DAY Avg. Power Level 1 1,109 16 1,107 2 1,107 17 1,107 3 1,106 18 1,107 4 1,109 19 1,107 5 1,108 20 1,106 6 1,107 21 1,105 7 1,108 22 1,101 8 1,107 23 1,070 9 1,108 24 1,101 10 1,107 25 1,100 11 1,108 26 1,101 12 1,108 27 1,101 13 1,106 28 1,097 14 1,107 29 1,094 15 1,106 30 1,093 INSTRUCTIONS:

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Reflects On-Line Net Generation.

5/^12003 Page: 4 of 5

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: May 7, 2003 COMPLETED BY: Jim Pollock TELEPHONE: (504) 739-6561 REPORTING PERIOD: April, Outage Date

  • Duration ** Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NA TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B- Maintenance or Test C - Refueling D- Regulatory Restriction E- Operator Training and METHOD License Examination 1- Manual F - Administrative 2- Manual Scram G - Operational Error (explain) 3- Automatic Scram H - Other (explain) 4- Continuation from Previous Period 5- Power Reduction 6- Other (explain) snnoo03 Page: 5 of 5