W3F1-2004-0001, December 2003 Monthly Operating Report for Waterford Unit 3
| ML040210484 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 01/12/2004 |
| From: | Sen G Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| W3F1-2004-0001 | |
| Download: ML040210484 (7) | |
Text
A En tergy Entergy Operations, Inc.
17265 River Road Killona. LA 70066 Tel 504 739 6650 W3F1 -2004-0001 January 12, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Monthly Operating Report - December 2003 Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38
Dear Sir or Madam:
Attached is the subject report which covers the operating statistics for the month of December, 2003. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.
There are no new commitments contained in this submittal.
Sincerely, G. Sen Licensing Manager GS/TMM/cbh Attachment(s)
-< JV
W3Fl-2004-0001 Page 2 cc:
Mr. Thomas P. Gwynn Acting Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Waterford NPS P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop 0-7 D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1400 L Street, NW Washington, DC 20005-3502 Platts Energy ATTN: B. Lewis 1200 G. St., N.W. Suite 1000 Washington, DC 20005 lerevents@inpo.org - INPO Records Center, NRC Resident Inspectors Office
NRC MONTHLY OPERATING REPORT WATERFORD 3 for December, 2003
SUMMARY
OF OPERATIONS The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES There were no pressurizer safety valve failures or challenges experienced during the month.
Inns4 Page: I of 5
OPERATING DATA REPORT DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 January 6, 2004 Bruce E. Meyers (504) 739-6426 OPERATING STATUS
- 1. Reporting Period December, 2003 Gross Hours in Reporting Period 744
- 2. Currently Authorized Power Level (MWt) 3,441 Maximum Dependable Capacity (Net MWe) :
1,075
. Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe)
- 4. Reason for Restriction (if any)
N/A THIS MONTH YEAR TO DATE CUMULATIVE 5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Number of Hours Reactor was Critical Reactor Reserve Shutdown Hours Hours Generator was On-line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (using MDC)
Unit Capacity Factor (using DER)
Unit Forced Outage Rate 744.0 0.0 744.0 0.0 2,558,425 858,763 824,870 100.0 100.0 100.0 100.0 103.1 100.4 0.0 7,963.1 0.0 7,867.0 0.0 26,632,577 8,877,127 8,503,126 90.9
. 90.9 89.8 89.8 90.3 87.9 1.2 138,212.3 0.0 136,829.4 0.0 456,366,528 152,907,238 146,083,360 86.3 86.3 85.4 85.4 84.9 82.6 3.5 InI2oo4 Page: 2 of 5
OPERATING DATA REPORT DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 January 6, 2004 Bruce E. Meyers (504) 739-6426 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each):
NONE
- 20. If Shutdown at end of report period, estimated date of startup:
N/A
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE 22.
23.
Hours in Reporting Period Unit Forced Outage Hours 744 8,760 0.0 97.7 160,153 4,995.6
- 24. Nameplate Rating (Gross MWe) 1,200 1,120 Max. Dependable Capacity (Gross MWe)
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons:
NIA Inloow Page: 3 o 5
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 January 6, 2004 Bruce E. Meyers (504) 739-6426 Reporting Period:
December, 2003 (NET MWe)
DAY Avg. Power Level DAY Avg. Power Level 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 1,108 1,109 1,108 1,109 1,109 1,109 1,108 1,110 1,108 1,108 1,108 1,108 1,109 1,107 1,109 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1,109 1,109 1,106 1,106 1,109 1,108 1,110 1,110 1,110 1,110 1,110 1,110 1,109 1,109 1,109 1,108 0
INSTRUCTIONS:
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Reflects On-Line Net Generation.
1/7/2W4 Page: 4 of 5
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 January 6, 2004 Bruce E. Meyers (504) 739-6426 REPORTING PERIOD:
December, 2003 Outage Duration Shutdown (Hours)
Reason Method Date Number (yymmdd)
NA Type Cause, Comments and Corrective Actions TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) innoow Page:
of 5