Category:Letter type:W
MONTHYEARW3F1-2024-0049, Notification of Readiness for Supplemental Inspection2024-10-21021 October 2024 Notification of Readiness for Supplemental Inspection W3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2024-0038, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-09-24024 September 2024 Response to Request for Additional Information - Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds W3F1-2024-0039, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-09-24024 September 2024 Response to Request for Additional Information - Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles W3F1-2024-0041, Reply to a Notice of Violation, EA-24-0522024-09-19019 September 2024 Reply to a Notice of Violation, EA-24-052 W3F1-2024-0040, Special Report SR 2024-001-00 Radiation Monitor Inoperable Greater than 7 Days2024-09-0303 September 2024 Special Report SR 2024-001-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2024-0019, (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 252024-07-22022 July 2024 (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2024-0032, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-07-17017 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation W3F1-2024-0024, Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days2024-06-17017 June 2024 Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days W3F1-2024-0011, Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program2024-05-0808 May 2024 Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program W3F1-2024-0018, Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 252024-05-0101 May 2024 Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2024-0014, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20242024-04-29029 April 2024 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2024 W3F1-2024-0015, Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure2024-04-24024 April 2024 Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure W3F1-2024-0016, Annual Radiological Environmental Operating Report (AREOR) - 20232024-04-24024 April 2024 Annual Radiological Environmental Operating Report (AREOR) - 2023 W3F1-2024-0017, Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.22062024-04-23023 April 2024 Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.2206 W3F1-2024-0020, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20232024-04-11011 April 2024 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2023 W3F1-2024-0008, Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-18018 March 2024 Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds W3F1-2024-0009, Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-03-18018 March 2024 Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles W3F1-2024-0012, Response to NRC Integrated Inspection Report 05000382/20230042024-03-11011 March 2024 Response to NRC Integrated Inspection Report 05000382/2023004 W3F1-2024-0006, Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days2024-02-28028 February 2024 Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0056, Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023 Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2023-0055, Reply to a Notice of Violation2023-12-14014 December 2023 Reply to a Notice of Violation W3F1-2023-0052, Core Operating Limits Report (COLR) - Cycle 26, Revision O2023-11-0707 November 2023 Core Operating Limits Report (COLR) - Cycle 26, Revision O W3F1-2023-0049, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal2023-09-28028 September 2023 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal W3F1-2023-0048, Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-09-25025 September 2023 Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2023-0036, Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-05-0404 May 2023 Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0032, Annual Radioactive Effluent Release Report (ARERR) 20222023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) 2022 W3F1-2023-0033, Submittal of Annual Radiological Environmental Operating Report - 20222023-04-27027 April 2023 Submittal of Annual Radiological Environmental Operating Report - 2022 W3F1-2023-0025, Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.22062023-04-11011 April 2023 Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.2206 W3F1-2023-0018, Updated Final Supplemental Response to NRC Generic Letter 2004-022023-03-30030 March 2023 Updated Final Supplemental Response to NRC Generic Letter 2004-02 W3F1-2023-0022, Registration of Dry Fuel Storage Cask Use2023-03-22022 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0021, Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days2023-03-17017 March 2023 Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0016, Registration of Dry Fuel Storage Cask Use2023-03-0303 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0014, Reply to a Notice of Violation; EA-22-1192023-02-20020 February 2023 Reply to a Notice of Violation; EA-22-119 W3F1-2023-0013, Notification of Readiness for Supplemental Inspection2023-02-15015 February 2023 Notification of Readiness for Supplemental Inspection W3F1-2023-0007, Registration of Dry Fuel Storage Cask Use2023-02-0606 February 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0010, Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days2023-01-25025 January 2023 Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0002, SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days2023-01-0505 January 2023 SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days W3F1-2022-0067, Commitment Change Notification for Generic Safety Issue – 191 and Generic Letter 2004-022022-12-20020 December 2022 Commitment Change Notification for Generic Safety Issue – 191 and Generic Letter 2004-02 W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability2022-11-0101 November 2022 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability W3F1-2022-0063, Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 372022-10-27027 October 2022 Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 37 W3F1-2022-0059, Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-5052022-10-13013 October 2022 Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505 W3F1-2022-0058, Reply to a Notice of Violation; EA-22-0332022-10-12012 October 2022 Reply to a Notice of Violation; EA-22-033 W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-5052022-08-19019 August 2022 Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 W3F1-2022-0037, Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242022-08-0808 August 2022 Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2022-0044, SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-07-0606 July 2022 SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.2022-05-16016 May 2022 Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf. W3F1-2022-0026, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20222022-04-28028 April 2022 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2022 2024-09-03
[Table view] Category:License-Monthly Operating Report
MONTHYEARW3F1-2005-0059, June 2005 Monthly Operating Report for Water Ford Steam Electric Station Unit 3 Revised2005-09-19019 September 2005 June 2005 Monthly Operating Report for Water Ford Steam Electric Station Unit 3 Revised ML0519903462005-07-13013 July 2005 June 2005 Monthly Operating Report, Waterford Steam Electric Station, Unit 3 ML0516001392005-06-0606 June 2005 May 2005 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2005-0035, April 2005 Monthly Operating Report for Waterford, Unit 32005-05-0909 May 2005 April 2005 Monthly Operating Report for Waterford, Unit 3 W3F1-2005-0023, March 2005 Monthly Operating Report for Waterford Steam Electric Station Unit 32005-04-0606 April 2005 March 2005 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2005-0016, February 2005 Monthly Operating Report for Waterford Unit 32005-03-0909 March 2005 February 2005 Monthly Operating Report for Waterford Unit 3 W3F1-2005-0008, January 2005 Monthly Operating Report for Waterford Steam Electric Station Unit 32005-02-14014 February 2005 January 2005 Monthly Operating Report for Waterford Steam Electric Station Unit 3 ML0501302112005-01-10010 January 2005 December 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 W3F1-2004-0124, November 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 32004-12-0606 December 2004 November 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 W3F1-2004-0112, October 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 (Waterford 3)2004-11-10010 November 2004 October 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 (Waterford 3) W3F1-2004-0093, September 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 32004-10-0606 October 2004 September 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 W3F1-2004-0083, August 2004 Monthly Operating Report for Waterford Unit 32004-09-23023 September 2004 August 2004 Monthly Operating Report for Waterford Unit 3 W3F1-2004-0079, June 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 32004-08-31031 August 2004 June 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2004-0067, July 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 (Waterford 3)2004-08-0505 August 2004 July 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 (Waterford 3) W3F1-2004-0057, June 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 32004-07-12012 July 2004 June 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2004-0039, April 2004 Monthly Operating Report for Waterford, Unit 32004-05-11011 May 2004 April 2004 Monthly Operating Report for Waterford, Unit 3 W3F1-2004-0032, February 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 32004-04-0606 April 2004 February 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2004-0020, February 2004 Monthly Operating Report for Waterford Unit 32004-03-15015 March 2004 February 2004 Monthly Operating Report for Waterford Unit 3 W3F1-2004-0011, January 2004 Monthly Operating Report for Waterford, Unit 32004-02-0505 February 2004 January 2004 Monthly Operating Report for Waterford, Unit 3 W3F1-2004-0001, December 2003 Monthly Operating Report for Waterford Unit 32004-01-12012 January 2004 December 2003 Monthly Operating Report for Waterford Unit 3 W3F1-2003-0101, November 2003 Monthly Operating Report for Waterford Unit 32003-12-0808 December 2003 November 2003 Monthly Operating Report for Waterford Unit 3 W3F1-2003-0088, October 2003 Monthly Operating Report for Waterford Steam Electric Station, Unit 32003-11-11011 November 2003 October 2003 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 W3F1-2003-0081, September 2003 Monthly Operating Report for Waterford Unit 32003-10-0707 October 2003 September 2003 Monthly Operating Report for Waterford Unit 3 W3F1-2003-0072, August 2003 Monthly Operating Report for Waterford Steam Electric Station Unit 32003-09-0909 September 2003 August 2003 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2003-0064, July 2003 Monthly Operating Report for Waterford 3 Ses2003-08-11011 August 2003 July 2003 Monthly Operating Report for Waterford 3 Ses W3F1-2003-0051, June 2003 Monthly Operating Report for Waterford 3 Ses2003-07-0909 July 2003 June 2003 Monthly Operating Report for Waterford 3 Ses W3F1-2003-0046, May 2003 Monthly Operating Report for Waterford 32003-06-0606 June 2003 May 2003 Monthly Operating Report for Waterford 3 W3F1-2003-0040, April 2003 Monthly Operating Report for Waterford 3 Ses2003-05-0808 May 2003 April 2003 Monthly Operating Report for Waterford 3 Ses W3F1-2003-0023, March 2003 Monthly Operating Report for Waterford 32003-04-0808 April 2003 March 2003 Monthly Operating Report for Waterford 3 ML0307704452003-03-12012 March 2003 February 2003 Monthly Operating Report for Waterford 3 W3F1-2003-0012, January 2003 Monthly Operating Report for Waterford 3 Ses2003-02-13013 February 2003 January 2003 Monthly Operating Report for Waterford 3 Ses W3F1-2003-0001, December 2002 Monthly Operating Report for Waterford 32003-01-13013 January 2003 December 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0105, November 2002 Monthly Operating Report for Waterford 32002-12-0606 December 2002 November 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0098, October 2002 Monthly Operating Report for Waterford 32002-11-12012 November 2002 October 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0094, September 2002 Monthly Operating Report for Waterford 32002-10-10010 October 2002 September 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0088, August 2002 Monthly Operating Report for Waterford 32002-09-10010 September 2002 August 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0077, July 2002 Monthly Operating Report for Waterford 3 Ses2002-08-0808 August 2002 July 2002 Monthly Operating Report for Waterford 3 Ses W3F1-2002-0067, June 2002 Monthly Operating Report for Waterford 32002-07-10010 July 2002 June 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0061, May 2002 Monthly Operating Report for Waterford 32002-06-10010 June 2002 May 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0054, April 2002 Monthly Operating Report for Waterford 32002-05-0808 May 2002 April 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0036, March 2002 Monthly Operating Report for Waterford 3 Ses2002-04-10010 April 2002 March 2002 Monthly Operating Report for Waterford 3 Ses W3F1-2002-0029, February 2002 Monthly Operating Report for Waterford 3 Ses2002-03-12012 March 2002 February 2002 Monthly Operating Report for Waterford 3 Ses W3F1-2002-0017, January 2002 Monthly Operating Report for Waterford 3 Ses2002-02-14014 February 2002 January 2002 Monthly Operating Report for Waterford 3 Ses W3F1-2002-0003, December 2001 Monthly Operating Report for Waterford 3 Ses2002-01-14014 January 2002 December 2001 Monthly Operating Report for Waterford 3 Ses 2005-09-19
[Table view] |
Text
Entergy Operations, Inc.
A En tergy 17265 River Road Killona. LA 70066 Tel 504 739 6650 W3F1 -2004-0001 January 12, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Monthly Operating Report - December 2003 Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38
Dear Sir or Madam:
Attached is the subject report which covers the operating statistics for the month of December, 2003. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.
There are no new commitments contained in this submittal.
Sincerely, G. Sen Licensing Manager GS/TMM/cbh Attachment(s)
-<JV
W3Fl-2004-0001 Page 2 cc: Mr. Thomas P. Gwynn Acting Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Waterford NPS P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop 0-7 D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1400 L Street, NW Washington, DC 20005-3502 Platts Energy ATTN: B. Lewis 1200 G. St., N.W. Suite 1000 Washington, DC 20005 lerevents@inpo.org - INPO Records Center, NRC Resident Inspectors Office
NRC MONTHLY OPERATING REPORT WATERFORD 3 for December, 2003
SUMMARY
OF OPERATIONS The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES There were no pressurizer safety valve failures or challenges experienced during the month.
Inns4 Page: I of 5
OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: January 6, 2004 COMPLETED BY: Bruce E. Meyers TELEPHONE: (504) 739-6426 OPERATING STATUS
- 1. Reporting Period December, 2003 Gross Hours in Reporting Period 744
- 2. Currently Authorized Power Level (MWt) : 3,441 Maximum Dependable Capacity (Net MWe) : 1,075
. Design Electrical Rating (Net MWe) : 1,104
- 3. Power Level to which Restricted (if any) (Net MWe) : NIA
- 4. Reason for Restriction (if any) N/A THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 744.0 7,963.1 138,212.3
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator was On-line 744.0 7,867.0 136,829.4
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,558,425 26,632,577 456,366,528
- 10. Gross Electrical Energy Generated (MWH) 858,763 8,877,127 152,907,238
- 11. Net Electrical Energy Generated (MWH) 824,870 8,503,126 146,083,360
- 12. Reactor Service Factor 100.0 90.9 86.3
- 13. Reactor Availability Factor 100.0 . 90.9 86.3
- 14. Unit Service Factor 100.0 89.8 85.4
- 15. Unit Availability Factor 100.0 89.8 85.4
- 16. Unit Capacity Factor (using MDC) 103.1 90.3 _
84.9
- 17. Unit Capacity Factor (using DER) 100.4 87.9 _
82.6
- 18. Unit Forced Outage Rate 0.0 1.2 3.5 InI2oo4 Page: 2 of 5
OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: January 6, 2004 COMPLETED BY: Bruce E. Meyers TELEPHONE: (504) 739-6426 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each):
NONE
- 20. If Shutdown at end of report period, estimated date of startup: N/A
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 744 8,760 160,153
- 23. Unit Forced Outage Hours 0.0 97.7 4,995.6
- 24. Nameplate Rating (Gross MWe) : 1,200 Max. Dependable Capacity (Gross MWe) : 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons:
NIA Inloow Page: 3 o 5
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: January 6, 2004 COMPLETED BY: Bruce E. Meyers TELEPHONE: (504) 739-6426 Reporting Period: December, 2003 (NET MWe)
DAY Avg. Power Level DAY Avg. Power Level 1 1,108 16 1,109 2 1,109 17 1,109 3 1,108 18 1,106 4 1,109 19 1,106 5 1,109 20 1,109 6 1,109 21 1,108 7 1,108 22 1,110 8 1,110 23 1,110 9 1,108 24 1,110 10 1,108 25 1,110 11 1,108 26 1,110 12 1,108 27 1,110 13 1,109 28 1,109 -
14 1,107 29 1,109 15 1,109 30 0 1,109 31 1,108 INSTRUCTIONS:
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Reflects On-Line Net Generation.
1/7/2W4 Page: 4 of 5
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: January 6, 2004 COMPLETED BY: Bruce E. Meyers TELEPHONE: (504) 739-6426 REPORTING PERIOD: December, 2003 Outage Date
- Duration ** Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NA TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D- Regulatory Restriction E- Operator Training and METHOD License Examination 1- Manual F - Administrative 2- Manual Scram G - Operational Error (explain) 3- Automatic Scram H - Other (explain) 4- Continuation from Previous Period 5- Power Reduction 6- Other (explain) innoow Page: of 5