W3F1-2002-0105, November 2002 Monthly Operating Report for Waterford 3

From kanterella
Jump to navigation Jump to search
November 2002 Monthly Operating Report for Waterford 3
ML023500214
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/06/2002
From: Murillo R
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
A4.05, W3F1-2002-0105
Download: ML023500214 (6)


Text

%Entarg Entergy Operations, Inc.

17265 River Road Killona, LA 70066 Tel 504 739 6650 W3F1-2002-0105 A4.05 PR December 6, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject report which covers the operating statistics for the month of November, 2002. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

There are no commitments associated with this submittal. Should you have any questions regarding the above, please contact M. K. Brandon at (504) 739-6254.

Very truly yours, R.J. Murillo Acting Licensing Manager RJM/MKB/cbh Attachment cc: E.W. Merschoff (NRC Region IV), N. Kalyanam (NRC-NRR),

J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),

lerevents@inpo.org - INPO Records Center, NRC Resident Inspectors Office 0 S

NRC MONTHLY OPERATING REPORT WATERFORD 3 for November, 2002

SUMMARY

OF OPERATIONS The unit operated at an average reactor power level of 99.7% and experienced no shutdowns or significant power reductions during the period.

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES There were no pressurizer safety valve failures or challenges experienced during the month.

Page I of 5 12/5/2002

OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: December 5, 2002 COMPLETED BY: Jim Pollock TELEPHONE: (504) 739-6561 OPERATING STATUS

1. Reporting Period
  • November, 2002 Gross Hours in Reporting Period
  • 720
2. Currently Authorized Power Level (MWt)  : 3,441 Maximum Dependable Capacity (Net MWe) " 1,075 Design Electrical Rating (Net MWe)
  • 1,104
3. Power Level to which Restricted (if any) (Net MWe) NIA
4. Reason for Restriction (if any) N/A THIS YEAR TO MONTH DATE CUMULATIVE 720.0 7,421.8 129,505.2
5. Number of Hours Reactor was Critical 0.0 0.0 0.0
6. Reactor Reserve Shutdown Hours 720.0 7,393.8 128,218.5
7. Hours Generator was On-line 0.0 0.0 0.0
8. Unit Reserve Shutdown Hours 2,471,286 25,082,163 427,179,199
9. Gross Thermal Energy Generated (MWH) 828,493 8,376,897 143,172,714
10. Gross Electrical Energy Generated (MWH) 795,559 8,024,834 136,757,140
11. Net Electrical Energy Generated (MWH) 100.0 92.6 86.0
12. Reactor Service Factor 100.0 92.6 86.0
13. Reactor Availability Factor 100.0 92.2 85.1
14. Unit Service Factor 100.0 92.2 85.1
15. Unit Availability Factor 102.8 93.1 84.4
16. Unit Capacity Factor (using MDC) 100.1 90.7 82.2
17. Unit Capacity Factor (using DER) 0.0 0.0 3.7
18. Unit Forced Outage Rate Page 2 of 5 12/5/2002

OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: December 5, 2002 COMPLETED BY: Jim Pollock TELEPHONE: (504) 739-6561 OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each):

NONE

20. If Shutdown at end of report period, estimated date of startup: NIA
21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 720 8,016 150,649
23. Unit Forced Outage Hours 0.0 0.0 4,897.9
24. Nameplate Rating (Gross MWe)
  • 1,200 Max. Dependable Capacity (Gross MWe) 1,120
25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons:

NIA Page 3 of 5 12/5/2002

AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: December 5, 2002 COMPLETED BY: Jim Pollock TELEPHONE: (504) 739-6561 Reporting Period : November, 2002 (NET MWe)

DAY Avg. Power Level DAY Avg. Power Level 1 1,106 16 1,106 2 1,107 17 1,106 3 1,106 18 1,106 4 1,104 19 1,106 5 1,104 20 1,094 6 1,102 21 1,096 7 1,101 22 1,107 8 1,100 23 1,107 9 1,099 24 1,106 10 1,100 25 1,108 11 1,107 26 1,108 12 1,108 27 1,108 13 1,108 28 1,109 14 1,107 29 1,108 15 1,106 30 1,109 INSTRUCTIONS:

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Reflects On-Line Net Generation.

12/5/2002 Page: 4 of 5

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: December 5, 2002 COMPLETED BY: Jim Pollock TELEPHONE: (504) 739-6561 REPORTING PERIOD: November, 2002 Outage Date Duration ** Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NA "k'k TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination I - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) 1215/2002 Page 5 of 5