W3F1-2004-0020, February 2004 Monthly Operating Report for Waterford Unit 3
| ML040770321 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 03/15/2004 |
| From: | Sen G Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| W3F1-2004-0020 | |
| Download: ML040770321 (7) | |
Text
Entergy Entergy Operations, Inc.
17265 River Road Killona, LA 70057 Tel 504-739-6650 W3Fl-2004-0020 March 15, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Monthly Operating Report Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38
Dear Sir or Madam:
Attached is the subject report which covers the operating statistics for the month of February 2004. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.
There are no new commitments contained in this submittal.
Sincerely, G. Sen Licensing Manger GS/RJP/
Attachment(s)
W3F1 -2004-0020 Page 2 cc:
Mr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop 0-07 D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1400 L Street, NW Washington, DC 20005-3502 Platts Energy ATTN: B. Lewis 1200 G. St., N.W. Suite 1000 Washington, DC 2005 lerevents@inpo.org - INPO Records Center (MOR Only)
NRC MONTHLY OPERATING REPORT WATERFORD 3 for February, 2004
SUMMARY
OF OPERATIONS The unit operated at an average reactor power level of 98.0% during this period. The plant experienced one turbine generator outage of approximately 12.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Reactor power remained above 13.7 % during the generator outage.
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES There were no pressurizer safety valve failures or challenges experienced during the month.
XI VoM4 Page: I of 5
OPERATING DATA REPORT DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 March 11, 2004 Bruce E. Meyers (504) 739-6426 OPERATING STATUS
- 1. Reporting Period February, 2004 Gross Hours in Reporting Period 696
- 2. Currently Authorized Power Level (MWt) 3,441 Maximum Dependable Capacity (Net MWe) :
1,075 Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe)
N/A
- 4. Reason for Restriction (if any)
N/A 5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Number of Hours Reactor was Critical Reactor Reserve Shutdown Hours Hours Generator was On-line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (using MDC)
Unit Capacity Factor (using DER)
Unit Forced Outage Rate THIS MONTH 696.0 0.0 683.6 0.0 2,346,194 783,340 751,815 100.0 100.0 98.2 98.2 100.5 97.8 1.8 YEAR TO DATE 1,440.0 0.0 1,427.6 0.0o 4,904,856 1,641,557 1,576,026 100.0 100.0 99.1 99.1 101.8 99.1 0.9 CUMULATIVE 139,652.3 0.0 138,257.0 0.0 461,271,384 154,548,795 147,659,386 86.4 86.4 85.6 85.6 85.0 82.8 3.5 3111n204 Page: 2 of s
OPERATING DATA REPORT DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 March 11, 2004 Bruce E. Meyers (504) 739-6426 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each):
NONE
- 20. If Shutdown at end of report period, estimated date of startup:
- 21. Unit is in Commercial Operation.
N/A THIS YEAR TO MONTH DATE
- 22. Hours in Reporting Period 696 1,440
- 23. Unit Forced Outage Hours 12.4 12.4
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons:
N/A CUMULATIVE 161,593 5,008.1 31 1/2004P Page : 3 ofr 5
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 March 11, 2004 Bruce E. Meyers (504) 739-6426 Reporting Period:
February, 2004 (NET MWe)
DAY Avg. Power Level DAY Avg. Power Level I
2 3
4 5
6 7
8 9
10 11 12 13 14 15 1,108 1,108 1,109 1,108 1,108 1,108 1,108 1,108 1,108 1,108 1,107 1,108 1,105 1,107 1,107 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1,095 1,106 362 1,092 1,103 1,105 1,106 1,107 1,106 1,107 1,107 1,108 1,108 1,099 INSTRUCTIONS:
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Reflects On-Line Net Generation.
3111m204 Page: 4 of 5
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 March 11, 2004 Bruce E. Meyers (504) 739-6426 REPORTING PERIOD:
February, 2004 Outage Date Duration Number (yymmdd)
Type (Hours)
Reason Shutdown Method Cause, Comments and Corrective Actions 04-01 040220 F
12.4 A
5 Reactor power reduction to take turbine generator off-line due to Electro-hydraulic system fluid leak.
TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) 3l1 VZM Page: 5 of 5