MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment IR 05000382/20220912023-01-12012 January 2023 Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation IR 05000382/20220032023-01-0505 January 2023 Revised Integrated Inspection Report 05000382/2022003 ML22342B1402022-12-0202 December 2022 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22332A5292022-11-29029 November 2022 Notification of NRC Initial Operator Licensing Examination 05000382/2023301 IR 05000382/20220132022-11-28028 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 IR 05000382/20220022022-11-0101 November 2022 Revised Integrated Inspection Report 05000382/2022002 2024-01-31
[Table view] Category:License-Monthly Operating Report
MONTHYEARW3F1-2005-0059, June 2005 Monthly Operating Report for Water Ford Steam Electric Station Unit 3 Revised2005-09-19019 September 2005 June 2005 Monthly Operating Report for Water Ford Steam Electric Station Unit 3 Revised ML0519903462005-07-13013 July 2005 June 2005 Monthly Operating Report, Waterford Steam Electric Station, Unit 3 ML0516001392005-06-0606 June 2005 May 2005 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2005-0035, April 2005 Monthly Operating Report for Waterford, Unit 32005-05-0909 May 2005 April 2005 Monthly Operating Report for Waterford, Unit 3 W3F1-2005-0023, March 2005 Monthly Operating Report for Waterford Steam Electric Station Unit 32005-04-0606 April 2005 March 2005 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2005-0016, February 2005 Monthly Operating Report for Waterford Unit 32005-03-0909 March 2005 February 2005 Monthly Operating Report for Waterford Unit 3 W3F1-2005-0008, January 2005 Monthly Operating Report for Waterford Steam Electric Station Unit 32005-02-14014 February 2005 January 2005 Monthly Operating Report for Waterford Steam Electric Station Unit 3 ML0501302112005-01-10010 January 2005 December 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 W3F1-2004-0124, November 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 32004-12-0606 December 2004 November 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 W3F1-2004-0112, October 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 (Waterford 3)2004-11-10010 November 2004 October 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 (Waterford 3) W3F1-2004-0093, September 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 32004-10-0606 October 2004 September 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 W3F1-2004-0083, August 2004 Monthly Operating Report for Waterford Unit 32004-09-23023 September 2004 August 2004 Monthly Operating Report for Waterford Unit 3 W3F1-2004-0079, June 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 32004-08-31031 August 2004 June 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2004-0067, July 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 (Waterford 3)2004-08-0505 August 2004 July 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 (Waterford 3) W3F1-2004-0057, June 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 32004-07-12012 July 2004 June 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2004-0039, April 2004 Monthly Operating Report for Waterford, Unit 32004-05-11011 May 2004 April 2004 Monthly Operating Report for Waterford, Unit 3 W3F1-2004-0032, February 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 32004-04-0606 April 2004 February 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2004-0020, February 2004 Monthly Operating Report for Waterford Unit 32004-03-15015 March 2004 February 2004 Monthly Operating Report for Waterford Unit 3 W3F1-2004-0011, January 2004 Monthly Operating Report for Waterford, Unit 32004-02-0505 February 2004 January 2004 Monthly Operating Report for Waterford, Unit 3 W3F1-2004-0001, December 2003 Monthly Operating Report for Waterford Unit 32004-01-12012 January 2004 December 2003 Monthly Operating Report for Waterford Unit 3 W3F1-2003-0101, November 2003 Monthly Operating Report for Waterford Unit 32003-12-0808 December 2003 November 2003 Monthly Operating Report for Waterford Unit 3 W3F1-2003-0088, October 2003 Monthly Operating Report for Waterford Steam Electric Station, Unit 32003-11-11011 November 2003 October 2003 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 W3F1-2003-0081, September 2003 Monthly Operating Report for Waterford Unit 32003-10-0707 October 2003 September 2003 Monthly Operating Report for Waterford Unit 3 W3F1-2003-0072, August 2003 Monthly Operating Report for Waterford Steam Electric Station Unit 32003-09-0909 September 2003 August 2003 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2003-0064, July 2003 Monthly Operating Report for Waterford 3 Ses2003-08-11011 August 2003 July 2003 Monthly Operating Report for Waterford 3 Ses W3F1-2003-0051, June 2003 Monthly Operating Report for Waterford 3 Ses2003-07-0909 July 2003 June 2003 Monthly Operating Report for Waterford 3 Ses W3F1-2003-0046, May 2003 Monthly Operating Report for Waterford 32003-06-0606 June 2003 May 2003 Monthly Operating Report for Waterford 3 W3F1-2003-0040, April 2003 Monthly Operating Report for Waterford 3 Ses2003-05-0808 May 2003 April 2003 Monthly Operating Report for Waterford 3 Ses W3F1-2003-0023, March 2003 Monthly Operating Report for Waterford 32003-04-0808 April 2003 March 2003 Monthly Operating Report for Waterford 3 ML0307704452003-03-12012 March 2003 February 2003 Monthly Operating Report for Waterford 3 W3F1-2003-0012, January 2003 Monthly Operating Report for Waterford 3 Ses2003-02-13013 February 2003 January 2003 Monthly Operating Report for Waterford 3 Ses W3F1-2003-0001, December 2002 Monthly Operating Report for Waterford 32003-01-13013 January 2003 December 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0105, November 2002 Monthly Operating Report for Waterford 32002-12-0606 December 2002 November 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0098, October 2002 Monthly Operating Report for Waterford 32002-11-12012 November 2002 October 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0094, September 2002 Monthly Operating Report for Waterford 32002-10-10010 October 2002 September 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0088, August 2002 Monthly Operating Report for Waterford 32002-09-10010 September 2002 August 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0077, July 2002 Monthly Operating Report for Waterford 3 Ses2002-08-0808 August 2002 July 2002 Monthly Operating Report for Waterford 3 Ses W3F1-2002-0067, June 2002 Monthly Operating Report for Waterford 32002-07-10010 July 2002 June 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0061, May 2002 Monthly Operating Report for Waterford 32002-06-10010 June 2002 May 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0054, April 2002 Monthly Operating Report for Waterford 32002-05-0808 May 2002 April 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0036, March 2002 Monthly Operating Report for Waterford 3 Ses2002-04-10010 April 2002 March 2002 Monthly Operating Report for Waterford 3 Ses W3F1-2002-0029, February 2002 Monthly Operating Report for Waterford 3 Ses2002-03-12012 March 2002 February 2002 Monthly Operating Report for Waterford 3 Ses W3F1-2002-0017, January 2002 Monthly Operating Report for Waterford 3 Ses2002-02-14014 February 2002 January 2002 Monthly Operating Report for Waterford 3 Ses W3F1-2002-0003, December 2001 Monthly Operating Report for Waterford 3 Ses2002-01-14014 January 2002 December 2001 Monthly Operating Report for Waterford 3 Ses 2005-09-19
[Table view] |
Text
" Entergy Operations, Inc.
17265 River Road Killona, LA 70066 Tel 504 739 6650 W3F1-2003-0018 A4.05 PR March 12, 2003 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject report which covers the operating statistics for the month of February, 2003. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
There are no commitments associated with this submittal. Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.
Very truly yours, 5 Ridgel Acting Licensing Manager JAR/TMM/ssf Attachment cc: E.W. Merschoff (NRC Region IV), N. Kalyanam (NRC-NRR),
J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
lerevents@inpo.org - INPO Records Center, NRC Resident Inspectors Office
NRC MONTHLY OPERATING REPORT WATERFORD 3 for February, 2003
SUMMARY
OF OPERATIONS The unit operated at an average reactor power level of 85.3% during the period. The plant experienced a forced outage when an automatic turbine trip and reactor power cutback occurred on February 14, 2003. The Reactor was subsequently shutdown by normal operating procedures on February 15, 2003. The plant was returned to power and was connected to the grid on February 18, 2003.
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES There were no pressurizer safety valve failures or challenges experienced during the month.
3/10/2003 Page I of 5
OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: March 10, 2003 COMPLETED BY: Bruce Meyers TELEPHONE: (504) 739-6426 OPERATING STATUS
- 1. Reporting Period February, 2003 Gross Hours in Reporting Period 672
- 2. Currently Authorized Power Level (MWt) 3,441 Maximum Dependable Capacity (Net MWe)
- 1,075 Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe) N/A
- 4. Reason for Restriction (if any) NIA THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 627.1 1,371.1 131,620.3
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator was On-line 574.3 1,318.3 130,280.8
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 1,972,402 4,528,934 434,262,886
- 10. Gross Electrical Energy Generated (MWH) 652,825 1,511,231 145,541,342
- 11. Net Electrical Energy Generated (MWH) 626,457 1,450,666 139,030,900
- 12. Reactor Service Factor 93.3 96.8 86.1
- 13. Reactor Availability Factor 93.3 96.8 86.1
- 14. Unit Service Factor 85.5 93.1 85.3
- 15. Unit Availability Factor 85.5 93.1 85.3
- 16. Unit Capacity Factor (using MDC) 86.7 95.3 84.6
- 17. Unit Capacity Factor (using DER) 84.4 92.8 82.4
- 18. Unit Forced Outage Rate 14.5 6.9 3.7 3110/2003 Page 2 of 5
OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: March 10, 2003 COMPLETED BY: Bruce Meyers TELEPHONE: (504) 739-6426 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each):
NONE
- 20. If Shutdown at end of report period, estimated date of startup: NIA
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 672 1,416 152,809
- 23. Unit Forced Outage Hours 97.7 97.7 4,995.6
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons:
NIA Page 3 of 5 3/10/2003
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: March 10, 2003 COMPLETED BY: Bruce Meyers TELEPHONE: (504) 739-6426 Reporting Period : February, 2003 (NET MWe)
DAY Avg. Power Level DAY Avg. Power Level 1 1,109 16 0 2 1,110 17 0 3 1,111 18 243 4 1,109 19 1,038 5 1,109 20 1,098 6 1,109 21 1,106 7 1,108 22 1,110 8 1,110 23 1,109 9 1,110 24 1,107 10 1,108 25 1,086 11 1,106 26 1,104 12 1,107 27 1,107 13 1,109 28 1,105 14 474 15 0 INSTRUCTIONS:
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Reflects On-Line Net Generation.
Page. 4 of 5 3/10/2003
! 1ý3ý - ,
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: March 10, 2003 COMPLETED BY: Bruce Meyers TELEPHONE: (504) 739-6426 REPORTING PERIOD: February, 2003 Outage Date Duration ** Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions 03-01 030214 F 97.7 A 6 A main turbine trip occurred on low generator seal oil differential pressure when the air side seal oil pump was de-energized. Valves in the seal oil system did not operate as designed and failed to adequately control oil pressure. A reactor power cutback occurred and the reactor remained critical.
Subsequently, the reactor was shut down using normal operating procedures.
TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) 3110/2003 Page 5 of 5