W3F1-2002-0067, June 2002 Monthly Operating Report for Waterford 3

From kanterella
Jump to navigation Jump to search
June 2002 Monthly Operating Report for Waterford 3
ML021970577
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/10/2002
From: Brandon M
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
W3F1-2002-0067
Download: ML021970577 (7)


Text

Entergy Operations, Inc.

17265 River Road Tel 504 739 6650 W3F1-2002-0067 A4.05 PR July 10, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject report which covers the operating statistics for the month of June, 2002. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

There are no commitments associated with this submittal. Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.

Very truly yours, M.K. Brandon Licensing Manager MKB/TMM/cbh Attachment cc:

E.W. Merschoff (NRC Region IV), N. Kalyanam (NRC-NRR),

J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),

lerevents@inpo.org - INPO Records Center, NRC Resident Inspectors Office

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for June, 2002 The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.

7/8/02 Page : I of 6

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for June, 2002 There were no pressurizer safety valve failures or challenges experienced during the month.

7/8/02 Page : 2 of 6

OPERATING DATA REPORT DOCKET NUMBER:

UNIT NAME:

DATE OF REPORT:

COMPLETED BY:

TELEPHONE:

50-382 WATERFORD 3 July 8, 2002 Bruce E. Meyers (504) 739-6426 OPERATING STATUS

1. Reporting Period June, 2002 Gross Hours in Reporting Period 720
2. Currently Authorized Power Level (MWt) 3,441 Maximum Dependable Capacity (Net MWe) :

1,075 Design Electrical Rating (Net MWe) 1,104

3. Power Level to which Restricted (if any) (Net MWe)
4. Reason for Restriction (if any)

NIA Number of Hours Reactor was Critical Reactor Reserve Shutdown Hours Hours Generator was On-line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (using MDC)

Unit Capacity Factor (using DER)

Unit Forced Outage Rate THIS MONTH 720.0 0.0 720.0 0.0 2,475,037 826,613 792,448 100.0 100.0 100.0 100.0 102.4 99.7 0.0 YEAR TO DATE 3,748.8 0.0 3,720.8 0.0 12,463,375 4,181,363 4,007,676 86.3 86.3 85.7 85.7 85.8 83.6 0.0 CUMULATIVE 125,832.2 0.0 124,545.5 0.0 414,560,411 138,977,180 132,739,982 85.6 85.6 84.7 84.7 84.0 81.8 3.8 Page : 3 of 6 N/A

5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.

18.

7/8/02 I

OPERATING DATA REPORT DOCKET NUMBER:

UNIT NAME:

DATE OF REPORT:

COMPLETED BY:

TELEPHONE:

OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each):

NONE

20. If Shutdown at end of report period, estimated date of startup:
21. Unit is in Commercial Operation.

50-382 WATERFORD 3 July 8, 2002 Bruce E. Meyers (504) 739-6426

22. Hours in Reporting Period
23. Unit Forced Outage Hours
24. Nameplate Rating (Gross MWe)

Max. Dependable Capacity (Gross MWe)

THIS YEAR TO MONTH DATE CUMULATIVE 720 4,343 146,976 0.0 0.0 4,897.9 1,200 1,120

25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :

As indicated in the cover letter that transmitted the April Monthly Operating Report, the NRC approved Waterford 3's request for an increase in Authorized Power Level from 3390 MWt to 3411 MWt via Technical Specification Amendment Number 183 issued on March 29, 2002. Waterford implemented the power increase on June 1, 2002 at approximately 0820.

Page : 4 of 6 7/8/02 N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER:

UNIT NAME:

DATE OF REPORT:

COMPLETED BY:

TELEPHONE:

50-382 WATERFORD 3 July 8, 2002 Bruce E. Meyers (504) 739-6426 Reporting Period :

June, 2002 DAY Avg. Power Level 1

1,098 2

1,108 3

1,104 4

1,103 5

1,101 6

1,100 7

1,107 8

1,107 9

1,105 10 1,105 11 1,103 12 1,102 13 1,101 14 1,100 15 1,099 (NET MWe)

DAY Avg. Power Level 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1,098 1,096 1,095 1,098 1,098 1,097 1,098 1,099 1,100 1,099 1,099 1,099 1,099 1,099 1,099 INSTRUCTIONS:

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Reflects On-Line Net Generation.

Page : 5 of 6 7/8/02

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER UNIT NAME DATE OF REPORT COMPLETED BY TELEPHONE 50-382 WATERFORD 3 July 8, 2002 Bruce E. Meyers (504) 739-6426 REPORTING PERIOD:

Date Number (yymmdd)

NA Type June, 2002 Outage Duration (Hours)

Reason Shutdown Method Cause, Comments and Corrective Actions

  • -

REASC

- Forced

- Scheduled Manual Manual Scram Automatic Scram Continuation from Previous Period Power Reduction Other (explain)

)N A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and License Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

Page: 6 of 6 TYPE F

S METHOD 1

2 3

4 5

6 7/8/02