Entergy Operations, Inc.
17265 River Road at{sw e rgy Killona, LA 70066
'~~~~~~~~~~~~~
~~~~~~Tel 504 739 6650 W3FI-2003-0051 A4.05 PR July 9, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington; D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject report which covers the operating statistics for the month of June, 2003. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
There are no commitments associated with this submittal. Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.
Very truly yours, G. Sen Licensing Manager GS/rMM/cbh Attachment cc:
T. P. Gwynn (NRC Region IV), N. Kalyanam (NRC-NRR),
J. Smith, N.S. Reynolds, B. Lewis (Platts Energy),
lerevents@inpo.org - INPO Records Center, NRC Resident Inspectors Office
NRC MONTHLY OPERATING REPORT WATERFORD ?
for June, 2003
SUMMARY
OF OPERATIONS The unit operated at an average reactor power level of 99.7% during the period.
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES There were no pressurizer safety valve failures or challenges experienced during the month.
MMoo Page: I of S
OPERATING DATA REPORT DOCKET NUMBER:
-, UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 July 3, 2003 Jim Pollock (504) 739-6561 OPERATING STATUS
- 1. Reporting Period Gross Hours in Reporting Period
- 2. Currently Authorized Power Level (MWI)
Maximum Dependable Capacity (Net MWe)
Design Electrical Rating (Net MWe)
- 3. Power Level to which Restricted (if any) (Net June, 2003 720 3,441 1,075 1,104 MWe)
- 4. Reason for Restriction (if any)
- MNIA 5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Number of Hours Reactor was Critical Reactor Reserve Shutdown Hours Hours Generator was On-line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (using MDC)
Unit Capacity Factor (using DER)
Unit Forced Outage Rate THIS MONTH 720.0 0.0 720.0 0.0 2,470,519 825,758 789,996 100.0 100.0 100.0 100.0 102.1 99.4 0.0 YEAR TO DATE 4,298.1 0.0 4,245.3 0.0 14,586,662 4,872,040 4,673,321 99.0 99.0 97.8 97.8 100.1 97.5 2.2 CUMULATIVE 134,547.3 0.0 133,207.8 0.0 444,320,613 148,902,151 142,253,555 86.4 86.4 85.5 85.5 85.0 82.7 3.6 Wl"M Page: 2 of 5
OPERATING DATA REPORT DOCKET NUMBER:
- UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 July 3, 2003 Jim Pollock (504) 739-6561 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each):
REFUEL OUTAGE #12 - commencing on October 19, 2003 - 25 day outage
- 20. If Shutdown at end of report period, estimated date of startup:
- 21. Unit is in Commercial ODeration.
NIA THIS MONTH YEAR TO DATE CUMULATIVE 22.
23.
Hours in Reporting Period Unit Forced Outage Hours 720 4,343 155,736 0.0 97.7 4,995.6
- 24. Nameplate Rating (Gross MWe) 1,200 1,120 Max. Dependable Capacity (Gross MWe)
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons:
NIA MMroo Page: 3 of 5
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 July 3, 2003 Jim Pollock (504) 739-6561 Reporting Period:
June, 2003 (NET MWe)
DAY Avg. Power Level DAY Avg. Power Level 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15
_1,104 1,102 1,101 1,101 1,101 1,098 1,002 1,090 1,100 1,100 1,1 1,100 1,100 1,101 1,100 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1,101 1,101 1,102 1,101 1,102 1,102 1,103 1,103 1,102 1,100 1,101 1,100 1,100 1,099 1,100 INSTRUCTIONS:
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Reflects On-Line Net Generation.
7n/2003 Page: 4 of S
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 July 3, 2003 Jim Pollock (504) 739-6561 REPORTING PERIOD:
Date Number (yymmdd) Type NA June, 2003 Outage Duration Shutdown (Hours)
Reason Method Cause, Comments and Corrective Actions TYPE F - Forced S - Scheduled REASON A
I I
I I
A - Equipment Failure (explain)
B - Maintenance or Test
- Refueling
) - Regulatory Restriction E - Operator Training and License Examination F - Administrative 3 - Operational Error (explain)
- - Other (explain)
METHOD 1 - Manual I
2 - Manual Scram
(
3 - Automatic Scram 1
4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)