W3F1-2003-0064, July 2003 Monthly Operating Report for Waterford 3 Ses
| ML032310459 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/11/2003 |
| From: | Sen G Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| A4.05, W3F1-2003-0064 | |
| Download: ML032310459 (6) | |
Text
Entergy Operations, Inc.
17265 River Road tergy Killona, LA 70066 Tel 504 739 6650 W3Fl-2003-0064 A4.05 PR August 11, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject report which covers the operating statistics for the month of July, 2003. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
There are no commitments associated with this submittal. Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.
Very truly yours, G. Sen Licensing Manager GS/TMM/cbh Attachment cc:
T. P. Gwynn (NRC Region IV), N. Kalyanam (NRC-NRR),
J. Smith, N.S. Reynolds, B. Lewis (Platts Energy),
lereventstinpo.org - INPO Records Center, NRC Resident Inspectors Office
NRC MONTHLY OPERATING REPORT WATERFORD 3 for July, 2003
SUMMARY
OF OPERATIONS The unit operated at an average reactor power level of 99.9% during the period.
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES There were no pressurizer safety valve failures or challenges experienced during the month.
M2003 Pap: I of5
OPERATING DATA REPORT DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 August 4, 2003 Jim Pollock (504) 739-6561 OPERATING STATUS
- 1. Reporting Period July, 2003 Gross Hours in Reporting Period 744
- 2. Currently Authorized Power Level (MWt) 3,441 Maximum Dependable Capacity (Net MWe) :
1,075 Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe)
- 4. Reason for Restriction (if any)
NIA 5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Number of Hours Reactor was Critical Reactor Reserve Shutdown Hours Hours Generator was On-line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (using MDC)
Unit Capacity Factor (using DER)
Unit Forced Outage Rate THIS MONTH 744.0 0.0 744.0 0.0 2,558,736 850,573 813,381 100.0 100.0 100.0 100.0 101.7 99.0 0.0 YEAR TO DATE 5,042.1 0.0 4,989.3 0.0 17,145,398 5,722,613 5,486,702 99.1 99.1 98.1 98.1 100.3 97.7 1.9 CUMULATIVE 135,291.3 0.0 133,951.8 0.0 446,879,349 149,752,724 143,066,936 86.5 86.5 85.6 85.6 85.0 82.8 3.6
&W2W3 Pa: 2 of 5
OPERATING DATA REPORT DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 August 4, 2003 Jim Pollock (504) 739-6561 OPERATING STATUS (Cont)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each):
REFUEL OUTAGE #12 - commencing on October 19, 2003 - 25 day outage If Shutdown at end of report period, estimated date of startup:
Unit is in Commercial Operation.
20.
21.
N/A THIS YEAR TO MONTH DATE
- 22. Hours in Reporting Period 744 5,087
- 23. Unit Forced Outage Hours 0.0 97.7
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons:
NIA CUMULATIVE 156,480 4,995.6 Y/6n0203 Pap: 3 of 5
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 August 4, 2003 Jim Pollock (504) 739-6561 Reporting Period:
July, 2003 (NET MWe)
DAY Avg. Power Level DAY Avg. Power Level 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 1,101 1,100 1,099 1,099 1,099 1,100 1,098 1,098 1,097 1,095 1,095 1,095 1,094 1,092 1,093 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1,094 1,092 1,091 1,088 1,089 1,088 1,089 1,088 1,089 1,089 1,090 1,091 1,090 1,089 1,090 1,089 INSTRUCTIONS:
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Reflects On-Line Net Generation.
9/6=203 Page: 4 of 5
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 August 4, 2003 Jim Pollock (504) 7394561 REPORTING PERIOD:
July, 2003 Outage Date Duration Shutdown Number (yymmdd)
Type (Hours)
Reason Method NA Cause, Comments and Corrective Actions TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)
$162003 Pap: 5 of 5