W3F1-2002-0088, August 2002 Monthly Operating Report for Waterford 3
| ML022600633 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 09/10/2002 |
| From: | Houston B Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| A4.05, W3F1-2002-0088 | |
| Download: ML022600633 (7) | |
Text
SEnteogy Entergy Operations, Inc.
17265 River Road Killona, LA 70066 Tel 504 739 6650 W3F1-2002-0088 A4.05 PR September 10, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject report which covers the operating statistics for the month of August, 2002. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
There are no commitments associated with this submittal. Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.
Very truly yours, B.L. Houston Acting Licensing Manager BLH/TMM/ssf Attachment cc:
E.W. Merschoff (NRC Region IV), N. Kalyanam (NRC-NRR),
J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
lerevents@inpo.org - INPO Records Center, NRC Resident Inspectors Office
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 for August, 2002 The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.
9/4/02 Page: I of 6
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for August, 2002 There were no pressurizer safety valve failures or challenges experienced during the month.
9/4/02 Page 2 of 6
OPERATING DATA REPORT DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 September 4, 2002 Jim Pollock (504) 739-6561 OPERATING STATUS
- 1. Reporting Period August, 2002 (Gross Hours in Reporting Period 744
- 2. Currently Authorized Power Level (MWt) 3,441 Maximum Dependable Capacity (Net MWe) :
1,075 Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe)
- 4. Reason for Restriction (if any)
N/A Number of Hours Reactor was Critical Reactor Reserve Shutdown Hours Hours Generator was On-line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (using MDC)
Unit Capacity Factor (using DER)
Unit Forced Outage Rate THIS MONTH 744.0 0.0 744.0 0.0 2,558,472 846,321 809,052 100.0 100.0 100.0 100.0 101.2 98.5 0.0 YEAR TO DATE 5,236.8 0.0 5,208.8 0.0 17,576,765 5,873,401 5,625,006 89.8 89.8 89.3 89.3 89.7 87.4 0.0 CUMULATIVE 127,320.2 0.0 126,033.5 0.0 419,673,801 140,669,218 134,357,312 85.8 85.8 84.9 84.9 84.2 82.0 3.7 9/4/02 N/A
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
18.
Page 3 of 6
OPERATING DATA REPORT DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 September 4, 2002 Jim Pollock (504) 739-6561 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each):
NONE
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons:
914/02
- 20. If Shutdown at end of report period, estimated date of startup:
- 21. Unit is in Commercial Operation.
THIS YEAR TO
- 22.
23.
Hours in Reporting Period Unit Forced Outage Hours
- 24. Nameplate Rating (Gross MWe)
Max. Dependable Capacity (Gross MWe)
NIA MONTH DATE CUMULATIVE 744 5,831 148,464 0.0 0.0 4,897.9 1,200 1,120 Page 4 of 6
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 September 4, 2002 Jim Pollock (504) 739-6561 Reporting Period:
August, 2002 DAY Avg. Power Level 1
1,087 2
1,088 3
1,087 4
1,084 5
1,085 6
1,083 7
1,090 8
1,089 9
1,089 10 1,090 11 1,090 12 1,088 13 1,087 14 1,087 15 1,087 (NET MWe)
DAY Avg. Power Level 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1,087 1,088 1,089 1,090 1,093 1,091 1,089 1,086 1,089 1,084 1,084 1,086 1,088 1,081 1,088 1,087 INSTRUCTIONS:
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Reflects On-Line Net Generation.
Page 5 of 6 9/41M2
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 September 4, 2002 Jim Pollock (504) 739-6561 REPORTING PERIOD:
Date Number (yymmdd)
NA Type August, 2002 Outage Duration (Hours)
Reason Shutdown Method Cause, Comments and Corrective Actions
- ~
TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) 9/4/02 Page, 6 of 6