W3F1-2002-0094, September 2002 Monthly Operating Report for Waterford 3
| ML022900461 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/10/2002 |
| From: | Peters K Entergy Nuclear South, Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| A4.05, W3F1-2002-0094 | |
| Download: ML022900461 (7) | |
Text
Entergy Nuclear South Entergy Operations, Inc 17265 River Road Killona, LA 70066 Entegy Tel 504 739 6440 Fax 504 739 6698 kpeters@entergy corn Ken Peters Director, Nuclear Safety Assurance Waterford 3 W3F1-2002-0094 A4.05 PR October 10, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject report which covers the operating statistics for the month of September, 2002. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
There are no commitments associated with this submittal. Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.
Very truly yours, Jector-Nuclear afety Assurance BLH/TMM/cbh Attachment cc:
E.W. Merschoff (NRC Region IV), N. Kalyanam (NRC-NRR),
J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
lerevents@inpo.org - INPO Records Center, NRC Resident Inspectors Office
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 for September, 2002 The unit operated at an average reactor power level of 99.8% and experienced no shutdowns or significant power reductions during the period.
Page I of 6 10/9/2002
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for September, 2002 There were no pressurizer safety valve failures or challenges experienced during the month.
Page 2 of 6 1019/2002
OPERATING DATA REPORT DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 October 8, 2002 Jim Pollock (504) 739-6561 OPERATING STATUS
- 1. Reporting Period September, 2002 Gross Hours in Reporting Period 720
- 2. Currently Authorized Power Level (MWt) 3,441 Maximum Dependable Capacity (Net MWe) "
1,075 Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe)
N/A
- 4. Reason for Restriction (if any)
NIA Number of Hours Reactor was Critical Reactor Reserve Shutdown Hours Hours Generator was On-line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (using MDC)
Unit Capacity Factor (using DER)
Unit Forced Outage Rate THIS MONTH 720.0 0.0 720.0 0.0 2,472,369 819,193 783,135 100.0 100.0 100.0 100.0 101.2 98.5 0.0 YEAR TO DATE 5,956.8 0.0 5,928.8 0.0 20,049,134 6,692,594 6,408,141 90.9 90.9 90.5 90.5 91.0 88.6 0.0 CUMULATIVE 128,040.2 0.0 126,753.5 0.0 422,146,171 141,488,411 135,140,447 85.8 85.8 85.0 85.0 84.3 82.1 3.7 Page 3 of 6 10/912002
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
18.
OPERATING DATA REPORT DOCKET NUMBER:
50-382 UNIT NAME:
WATERFORD 3 DATE OF REPORT:
October 8, 2002 COMPLETED BY:
Jim Pollock TELEPHONE:
(504) 739-6561 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each):
NONE
- 20. If Shutdown at end of report period, estimated date of startup:
- 21.
Unit is in Commercial Ooeration N/A YEAR TO DATE CUMULATIVE Hours in Reporting Period Unit Forced Outage Hours
- 24. Nameplate Rating (Gross MWe)
Max. Dependable Capacity (Gross MWe) 720 6,551 149,184 0.0 0.0 4,897.9 1,200 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :
Page 4 of 6
- 22.
23.
THIS MONTH 101912002
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 October 8, 2002 Jim Pollock (504) 739-6561 Reporting Period:
September, 2002 DAY Avg. Power Level 1
1,087 2
1,087 3
1,089 4
1,085 5
1,087 6
1,033 7
1,089 8
1,090 9
1,091 10 1,090 11 1,090 12 1,088 13 1,088 14 1,088 15 1,087 (NET MWe)
DAY Avg. Power Level 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1,089 1,087 1,087 1,086 1,087 1,088 1,087 1,088 1,089 1,091 1,093 1,096 1,097 1,098 1,099 INSTRUCTIONS:
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Reflects On-Line Net Generation.
Page* 5 of 6 10/9/'2002
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
REPORTING PERIOD:
September, 2002 Outage Date Duration Number (yymmdd)
Type (Hours)
Reason NA Shutdown Method 50-382 WATERFORD 3 October 8, 2002 Jim Pollock (504) 739-6561 Cause, Comments and Corrective Actions
...........
TYPE F - Forced S - Scheduled METHOD 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from Previous Perioc 5 - Power Reduction 6 - Other (explain)
REASON A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and License Examination F - Administrative G - Operational Error (explain)
H - Other (explain)
Page 6 of 6 10/9/2002