W3F1-2003-0081, September 2003 Monthly Operating Report for Waterford Unit 3
| ML032880417 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/07/2003 |
| From: | Sen G Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| W3F1-2003-0081 | |
| Download: ML032880417 (7) | |
Text
A 'En tergy Entergy Operations, Inc.
17265 River Road Killona, LA 70066 Tel 504 739 6650 W3FI-2003-0081 October 7, 2003 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Monthly Operating Report - September 2003 Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38
Dear Sir or Madam:
Attached is the subject report which covers the operating statistics for the month of September, 2003. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.
There are no new commitments contained in this submittal.
Sincerely, G. Sen Licensing Manager GSfTMM/cbh Attachment(s)
-;94
W3Fl-2003-0081 Page 2 cc:
Mr. Thomas P. Gwynn Acting Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Waterford NPS P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop 0-7 D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1400 L Street, NW Washington, DC 20005-3502 Platts Energy ATTN: B. Lewis 1200 G. St., N.W. Suite 1000 Washington, DC 20005 lerevents@inpo.org - INPO Records Center, NRC Resident Inspectors Office
NRC MONTHLY OPERATING REPORT WATERFORD 3 for September, 2003
SUMMARY
OF OPERATIONS The unit operated at an average reactor power level of 97.1 % during the period.
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES There were no pressurizer safety valve failures or challenges experienced during the month.
IWt0a=3 Page: I of 5
OPERATING DATA REPORT DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 October 2, 2003 Jim Pollock (504) 739-6561 OPERATING STATUS
- 1. Reporting Period September, 2003 Gross Hours in Reporting Period 720
- 2. Currently Authorized Power Level (MVt) 3,441 Maximum Dependable Capacity (Net MWe) :
1,076 Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe)
- 4. Reason for Restriction (if any)
NIA 5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Number of Hours Reactor was Critical Reactor Reserve Shutdown Hours Hours Generator was On-line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (using MDC)
Unit Capacity Factor (using DER)
Unit Forced Outage Rate THIS MONTH 720.0 0.0 720.0 0.0 2,406,613 _
802,146_
766,163 100.0 100.0 100.0 100.0 99.0 96A 0.0 YEAR TO DATE 6,506.1 0.0 6,453.3 0.0 22,110,760 7,371,382 7,062,299 99.3 99.3 98.5 98.5 100.3 97.6 1.5 CUMULATIVE 136,755.3 0.0 135,415.8 0.0 451,844,711 151,401,493 144,642,533 86.6 86.6 85.7 85.7 85.2 83.0 3.6 1012=03 Page: 2 of 5
OPERATING DATA REPORT DOCKET NUMBER:
sC UNIT NAME:
W DATE OF REPORT:
O COMPLETED BY:
Ji TELEPHONE:
(5 OPERATING STATUS (Cont)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each):
REFUEL OUTAGE #12 - commencing on October 19, 2003 - 25 day outage
- 20. If Shutdown at end of report period, estimated date of startup:
N
- 21. Unit is in Commercial Operation.
)-382 ATERFORD 3 ctober 2, 2003 m Pollock
- 04) 739-6561 TA THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 720 6,651 157,944
- 23. Unit Forced Outage Hours 0.0 97.7 4,995.6
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons:
N/A 10r2003 Page: 3 of 5
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 October 2, 2003 Jim Pollock (504) 739-6561 Reporting Period:
September, 2003 (NET MWe)
DAY Avg. Power Level 1
1,084 2
1,085 3
1,085 4
1,084 5
1,021 6
1,072 7
1,087 8
1,088 9
1,089 10 1,093 11 1,092 12 1,092 13 1,093 14 1,096 16 1,094 DAY Avg. Power Level 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1,094 1,095 1,092 1,086 1,076 1,063 1,053 1,046 1,039 1,028 1,019 1,015 1,002 986 978 INSTRUCTIONS:
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Reflects On-Line Net Generation.
I /212"3 Page: 4 of 5
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 October 2, 2003 Jim Pollock (504) 739-6561 REPORTING PERIOD:
September, 2003 Outage Date Duration Number (yymmdd)
Type (Hours)
Reason NA Shutdown Method Cause, Comments and Corrective Actions TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination I - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)
I 2/2003 Pap: 5 of S