Entergy Nuclear South Entergy Operations, Inc.
17265 River Road Killona, LA 70066 Tel 504 739 6475 P Entergy Fax 504 739 6698 aharris@entergy.com Alan J. Harris Director, Nuclear Safety Assurance Waterford 3 W3F1-2002-0003 A4.05 PR January 14, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject report which covers the operating statistics for the month of December, 2001. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
There are no commitments associated with this submittal. Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.
Very truly yours, Alan J. Harris
- Director, Nuclear Safety Assurance AJH/TMM/cbh Attachment cc:
E.W. Merschoff (NRC Region IV), N. Kalyanam (NRC-NRR),
J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
lerevents@inpo.org - INPO Records Center, NRC Resident Inspectors Office
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 for December, 2001 The unit operated at an average reactor power level of 99.95% and experienced no shutdowns or significant power reductions during the period.
Page: 1 of 6
]/8/02
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for December, 2001 There were no pressurizer safety valve failures or challenges experienced during the month.
Page: 2 of 6 1/8/02
OPERATING DATA REPORT DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 January 8, 2002 Bruce Meyers (504) 739-6426 OPERATING STATUS
- 1. Reporting Period Gross Hours in Reporting Period
- 2. Currently Authorized Power Level (MWt)
Maximum Dependable Capacity (Net MWe)
Design Electrical Rating (Net MWe)
- 3. Power Level to which Restricted (if any) (Net
- 4. Reason for Restriction (if any)
December, 2001 744 3,390 1,075 1,104 MWe)
NIA NIA Number of Hours Reactor was Critical Reactor Reserve Shutdown Hours Hours Generator was On-line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (using MDC)
Unit Capacity Factor (using DER)
Unit Forced Outage Rate THIS MONTH 744.0 0.0 744.0 0.0 2,520,997 856,615 822,578 100.0 100.0 100.0 100.0 102.8 100.1 0.0 YEAR TO DATE 8,727.0 0.0 8,718.7 0.0 29,444,278 9,947,588 9,539,062 99.6 99.6 99.5 99.5 101.3 98.6 0.5 CUMULATIVE 122,083.4 0.0 120,824.7 0.0 402,100,245 134,795,817 128,732,306 85.6 85.6 84.7 84.7 84.0 81.8 3.9 Page : 3 of 6
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
18.
1/8/02
OPERATING DATA REPORT DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 January 8, 2002 Bruce Meyers (504) 739-6426 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each):
REFUEL OUTAGE #11
- commencing on March 22, 2002
- 35 day outage If Shutdown at end of report period, estimated date of startup:
Unit is in Commercial Operation.
N/A THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 744 8,760 142,633
- 23. Unit Forced Outage Hours 0.0 41.3 4,897.9
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons:
N/A Page: 4 of 6
- 20.
21.
1/8/02
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 January 8, 2002 Bruce Meyers (504) 739-6426 Reporting Period:
December, 2001 DAY Avg. Power Level 1
1,104 2
1,104 3
1,104 4
1,105 5
1,102 6
1,105 7
1,105 8
1,106 9
1,106 10 1,106 11 1,106 12 1,106 13 1,107 14 1,107 15 1,107 (NET MWe)
DAY Avg. Power Level 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1,104 1,105 1,107 1,106 1,107 1,107 1,105 1,106 1,106 1,106 1,107 1,106 1,107 1,107 1,106 1,105 INSTRUCTIONS:
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Reflects On-Line Net Generation.
Page : 5 of 6 1/8102
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER UNIT NAME DATE OF REPORT COMPLETED BY TELEPHONE 50-382 WATERFORD 3 January 8, 2002 Bruce Meyers (504) 739-6426 REPORTING PERIOD:
Date Number (yymmdd)
NA Type December, 2001 Outage Duration Shutdown (Hours)
Reason Method Cause, Comments and Corrective Actions TYPE F
S METHOD 1
2 3
4 5
6-REASC Forced Scheduled Manual Manual Scram Automatic Scram Continuation from Previous Perio Power Reduction Other (explain)
)N A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and License Examination F - Administrative G - Operational Error (explain)
H - Other (explain) d Page: 6 of 6 1/8/02