Entergy Operations, Inc.

tergy 17265 River Road Killona, LA 70066 Tel 504 739 6650 W3F11-2003-0046 A4.05 PR June 6, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject report which covers the operating statistics for the month of May, 2003. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

There are no commitments associated with this submittal. Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.

Very truly yours, G. Sen Licensing Manager GS/TMM/cbh Attachment cc:

E.W. Merschoff (NRC Region IV), N. Kalyanam (NRC-NRR),

J. Smith, N.S. Reynolds, B. Lewis (Platts Energy),

lerevents@inpo.org - INPO Records Center, NRC Resident Inspectors Office

NRC MONTHLY OPERATING REPORT WATERFORD 3 for May, 2003

SUMMARY

OF OPERATIONS The unit operated at an average reactor power level of 99.9% during the period.

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES There were no pressurizer safety valve failures or challenges experienced during the month.

Page: I of 5 6/62003

OPERATING DATA REPORT DOCKET NUMBER:

UNIT NAME:

DATE OF REPORT:

COMPLETED BY:

TELEPHONE:

50-382 WATERFORD 3 June 2, 2003 Jim Pollock (504) 739-6561 OPERATING STATUS

1. Reporting Period Gross Hours in Reporting Period
2. Currently Authorized Power Level (MWt)

Maximum Dependable Capacity (Net MWe)

Design Electrical Rating (Net MWe)

3. Power Level to which Restricted (if any) (Net
4. Reason for Restriction (if any)

May, 2003 744 3,441 1,075 1,104 MWe)

NIA Number of Hours Reactor was Critical Reactor Reserve Shutdown Hours Hours Generator was On-line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (using MDC)

Unit Capacity Factor (using DER)

Unit Forced Outage Rate THIS MONTH 744.0 0.0 744.0 0.0 2,558,445 850,117 815,749 100.0 100.0 100.0 100.0 102.0 99.3 0.0 YEAR TO DATE 3,578.1 0.0 3,525.3 0.0 12,116,143 4,046,282 3,883,326 98.8 98.8 97.3 97.3 99.7 97.1 2.7 CUMULATIVE 133,827.3 0.0 132,487.8 0.0 441,850,094 148,076,393 141,463,559 86.3 86.3 85.5 85.5 84.9 82.7 3.6 Page: 2 of 5 NIA 5.

6.

-7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

6,6 2003

OPERATING DATA REPORT DOCKET NUMBER:

UNIT NAME:

DATE OF REPORT:

COMPLETED BY:

TELEPHONE:

50-382 WATERFORD 3 June 2, 2003 Jim Pollock (504) 739-6561 OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each):

REFUEL OUTAGE #12 - commencing on October 17, 2003 - 25 day outage If Shutdown at end of report period, estimated date of startup:

Unit is in Commercial Operation.

N/A THIS YEAR TO MONTH DATE

22. Hours in Reporting Period 744 3,623
23. Unit Forced Outage Hours
0.0 97.7
24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons:

N/A CUMULATIVE 155,016 4,995.6 Page: 3 of 5 20.

21.

6161203

AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER:

UNIT NAME:

DATE OF REPORT:

COMPLETED BY:

TELEPHONE:

50-382 WATERFORD 3 June 2, 2003 Jim Pollock (504) 739-6561 Reporting Period:

May, 2003 (NET MWe)

DAY Avg. Power Level I

2 3

4 65 6

7 8

9 10 11 12 13 14 15 1,093 1,092 1,105 1,105 1,096 1,103 1,093 1,093 1,092 1 j092 1,092 1,091 1,092 1,092 1,095 DAY Avg. Power Level 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1,092 1,095 1,097 1,098 1,099 1,098 1,101 1,099 1,100 1,100 1,099 1,101 1,099 1,084 1,095 1,107 INSTRUCTIONS:

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Reflects On-Line Net Generation.

Pap: 4 of 5 6 6=3o

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER:

UNIT NAME:

DATE OF REPORT:

COMPLETED BY:

TELEPHONE:

50-382 WATERFORD 3 June 2, 2003 Jim Pollock (504) 739-6561 REPORTING PERIOD:

Date Number (yymmdd)

NA Type May, 2003 Outage Duration (Hours)

Reason Shutdown Method Cause, Comments and Corrective Actions TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)

Page: 5 of 5 eU6fir=