Entergy Operations, Inc.
17265 River Road Tel 504 739 6650 W3F1-2002-0098 A4.05 PR November 12, 2002 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject report which covers the operating statistics for the month of October, 2002. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
There are no commitments associated with this submittal. Should you have any questions regarding the above, please contact M. K. Brandon at (504) 739-6254.
Very truly yours, D. Millar Acting Licensing Manager DM/MKB/cbh Attachment cc:
E.W. Merschoff (NRC Region IV), N. Kalyanam (NRC-NRR),
J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
lerevents@inpo.org - INPO Records Center, NRC Resident Inspectors Office
NRC MONTHLY OPERATING REPORT WATERFORD 3 for October, 2002
SUMMARY
OF OPERATIONS The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES There were no pressurizer safety valve failures or challenges experienced during the month.
Page: I of 5 11/ 8/2002
OPERATING DATA REPORT DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 November 8, 2002 Jim Pollock (504) 739-6561 OPERATING STATUS
- 1. Reporting Period October, 2002 Gross Hours in Reporting Period 745
- 2. Currently Authorized Power Level (MWt) 3,441 Maximum Dependable Capacity (Net MWe)
- 1,075 Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe)
N/A
- 4. Reason for Restriction (if any)
"N/A Number of Hours Reactor was Critical Reactor Reserve Shutdown Hours Hours Generator was On-line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (using MDC)
Unit Capacity Factor (using DER)
Unit Forced Outage Rate THIS MONTH 745.0 0.0 745.0 0.0 2,561,743 855,810 821,134 100.0 100.0 100.0 100.0 102.5 99.8 0.0 YEAR TO DATE 6,701.8 0.0 6,673.8 0.0 22,610,877 7,548,404 7,229,275 91.9 91.9 91.5 91.5 92.2 89.8 0.0 CUMULATIVE 128,785.2 0.0 127,498.5 0.0 424,707,914 142,344,221 135,961,581 85.9 85.9 85.0 85.0 84.4 82.1 3.7 Page 2 of 5
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
18.
V 11/8/2002
OPERATING DATA REPORT DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each):
NONE
- 20. If Shutdown at end of report period, estimated date of startup:
- 21.
Unit is in Commercial Operation.
YEAR TO DATE 50-382 WATERFORD 3 November 8, 2002 Jim Pollock (504) 739-6561 Hours in Reporting Period Unit Forced Outage Hours
- 24. Nameplate Rating (Gross MWe)
Max. Dependable Capacity (Gross MWe) 745 7,296 149,929 0.0 0.0 4,897.9 1,200 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons:
N/A I I/812002
- 22.
23.
THIS MONTH NIA CUMULATIVE Page 3 of 5
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 November 8, 2002 Jim Pollock (504) 739-6561 Reporting Period :
October, 2002 DAY Avg. Power Level 1
1,098 2
1,099 3
1,098 4
1,100 5
1,100 6
1,099 7
1,099 8
1,099 9
1,099 10 1,099 11 1,100 12 1,100 13 1,099 14 1,101 15 1,102 (NET MWe)
DAY Avg. Power Level 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1,103 1,103 1,104 1,106 1,105 1,104 1,105 1,104 1,105 1,106 1,105 1,106 1,106 1,104 1,106 1,106 INSTRUCTIONS:
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Reflects On-Line Net Generation.
Page: 4 of 5 11/8/2002
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER:
UNIT NAME:
DATE OF REPORT:
COMPLETED BY:
TELEPHONE:
50-382 WATERFORD 3 November 8, 2002 Jim Pollock (504) 739-6561 REPORTING PERIOD:
Date Number (yymmdd)
NA Type October, 2002 Outage Duration Shutdown (Hours)
Reason Method Cause, Comments and Corrective Actions TYPE F - Forced S - Scheduled REASON A
B C
D E
METHOD 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from Previous Perio(
5 - Power Reduction 6 - Other (explain)
- Equipment Failure (explain)
- Maintenance or Test
- Refueling
- Regulatory Restriction
- Operator Training and License Examination F - Administrative G - Operational Error (explain)
H - Other (explain)
Page 5 of 5 W*