Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18142B498 + (01:42:44, 6 January 2025)
- ML18142B495 + (01:42:45, 6 January 2025)
- ML18142B496 + (01:42:45, 6 January 2025)
- ML18142B482 + (01:42:46, 6 January 2025)
- ML18142B454 + (01:42:47, 6 January 2025)
- ML18142B411 + (01:42:48, 6 January 2025)
- ML18142B402 + (01:42:49, 6 January 2025)
- ML18142B401 + (01:42:49, 6 January 2025)
- ML18142B400 + (01:42:50, 6 January 2025)
- ML18142B399 + (01:42:51, 6 January 2025)
- ML18142B398 + (01:42:52, 6 January 2025)
- ML18142B397 + (01:42:53, 6 January 2025)
- ML18142B396 + (01:42:53, 6 January 2025)
- ML18142B395 + (01:42:54, 6 January 2025)
- ML18142B394 + (01:42:55, 6 January 2025)
- ML18142B393 + (01:42:56, 6 January 2025)
- ML18142B391 + (01:42:57, 6 January 2025)
- ML18142B392 + (01:42:57, 6 January 2025)
- ML18142B390 + (01:42:58, 6 January 2025)
- ML18142B389 + (01:42:59, 6 January 2025)
- ML18142B387 + (01:43:00, 6 January 2025)
- ML18142B388 + (01:43:00, 6 January 2025)
- ML18142B386 + (01:43:01, 6 January 2025)
- ML18142B385 + (01:43:02, 6 January 2025)
- ML18142B363 + (01:43:04, 6 January 2025)
- ML18142B378 + (01:43:04, 6 January 2025)
- ML18142B361 + (01:43:05, 6 January 2025)
- ML18142B362 + (01:43:05, 6 January 2025)
- ML18142B359 + (01:43:06, 6 January 2025)
- ML18142B357 + (01:43:07, 6 January 2025)
- ML18142B358 + (01:43:07, 6 January 2025)
- ML18142B356 + (01:43:08, 6 January 2025)
- ML18142B354 + (01:43:09, 6 January 2025)
- ML18142B355 + (01:43:09, 6 January 2025)
- ML18142B353 + (01:43:10, 6 January 2025)
- ML18142B332 + (01:43:11, 6 January 2025)
- ML18142B321 + (01:43:15, 6 January 2025)
- ML18142B316 + (01:43:16, 6 January 2025)
- 05000244/LER-2076-014, N44 Power Range Detector High Voltage Power Supply Failure + (01:43:18, 6 January 2025)
- 05000244/LER-2076-013, Drop of Two Control Rods + (01:43:20, 6 January 2025)
- ML18142B283 + (01:43:21, 6 January 2025)
- 05000244/LER-2076-015, Air Ejector and Blowdown Radiation Monitors Alarmed + (01:43:25, 6 January 2025)
- ML18142B281 + (01:43:26, 6 January 2025)
- 05000244/LER-2076-016, Rod Position Deviation Channel Was Found to Be Inoperable + (01:43:28, 6 January 2025)
- 05000244/LER-2076-010, R. E. Ginna - Supplemental Report on LER 1976-10-00, R. E. Ginna Plant, Containment Purge Supply Valve Having Excessive Leakage During Testing + (01:43:31, 6 January 2025)
- 05000244/LER-2076-020, For R.E. Ginna, a Accumulator Level Below Technical Specification Limit + (01:43:34, 6 January 2025)
- 05000244/LER-2076-019, For R. E. Ginna, Release of Liquid Radioactive Waste Without Continuous Operation of a Gross Activity Monitor. for R. E. Ginna, Release of Liquid Radioactive Waste Without Continuous Operation of a Gross Activity Monitor + (01:43:38, 6 January 2025)
- 05000244/LER-2076-021, R. E. Ginna, Unit 1, D Bank Group 2 RCCs G-3 and G-11 Partially Dropped Into Core + (01:43:40, 6 January 2025)
- ML18142B254 + (01:43:41, 6 January 2025)
- 05000244/LER-2076-022, R. E. Ginna, Unit 1, Error in Westinghouse Safety Analysis Methods + (01:43:46, 6 January 2025)
- 05000244/LER-2076-023, R. E. Ginna, Unit 1, Incorrect Piping Installation for Modification SM 75-9.21 + (01:43:48, 6 January 2025)
- 05000244/LER-2076-024, R. E. Ginna, Unit 1, Accumulation of Borated Water Near Valve in Safety Injection System Piping Between Boric Acid Tanks and Safety Injection Pumps + (01:43:49, 6 January 2025)