Forwards Monthly Operating Status Report for Month of March 1976
ML18142B386
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/08/1976
From: Platt C
Rochester Gas & Electric Corp
To:
NRC/IE
References
Download: ML18142B386 (12)


Text

NQC FORM 195 U.S. NUCLEAR REGULATORY COMMI N DOCKET NUMBER (2-76) Ko- 5%9 FILE NUMBER NRC DISTRIBUTION FDR PART 50 DOCKET MATERIAL MONTHLY REPORT TO: FROM: ROCHESTER GAS & ELEC CO DATE OF DOCUMENT ROCHESTER, NY NRC C E PLATT -P- l4 DATE RECEIVED LETTER ONOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED 5PRIGINAL /UNCLASSIFIED 0 COPY DESCRIPTION LETTER TRANS THE FOLLOWING: MHNTHLY REPORT FOR PLANT & COMPONENT OPERABILITY &

AVAILABILITY'HISREPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &

OPERATIONS'LANT NAME: QI~ fl 4 0 yO,'ag 0~@gGED 0

FOR ACTION/INFORMATION MIPC W CYS FO AC ON INTERNAL D IST Rl BUTION C D BRANCH CHIEF L Q. Lw EXTERNAL DISTRIBUTION CONTROL NUMBER

.4l

pzuprzir zuz

,~~ 10iK, J'- ~ 4 lktl ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TCLKPHONE 0, *ac* cooc v>e 546-2700 Ginna Station March 8, 1976 9(i6<4 gi- qgP Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Monthly Report for March, 1976 Operating Status Information R. E.'inna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Gentlemen:

Pursuant to Technical Specification 6.9.1.c attached herewith is the monthly operating status report for Ginna Station for the month of March,. 1976. Also ten additional copies of the attachment are enclosed.

Very truly yours, C Charles i'd%

E. Platt Superintendent CEP:fah Attachments cc: Mr. James P. O'Reilly, NRC(1)

Mr. William G. McDonald, NRC(2)

l W

OOCKCT NO 50-244 SUKSIARYI Annual refueling and naintenance GINNA SIATI(Ply VNI I III outage. Nork conti'nued on f2 low pressure UNIT NAME turbine blades repair. AN and "B" stean OATE April 8, 1976 generators, inspection and repair, other Tlaintenance. COMPLETEO 0 Andrew Hc alxara, pore xons e TELEPN<<E 1-716-546-2700, Ext. 291-214 .at Ginna REPOR'T MONTH lNIT SIIUTDOW /)ND POWER REDUCTIONS METIIOO OF TYPE SIIU'CT I NG 005'N F FORCEO OURATION TIIE REACTOR OR coRREcTIYE AcrloNslcotaAENTs NO. DATE S-SCIIEOULFO lHOURS) REASON lI) REOUCING POTTER l2) 760129 744 *Continuation of this outage for entire report tenth.

RYearly outage fl began on 1/29/76 as a forced unit shutdown.

Unit shutdown hours beginning 2/1/76 at 0001 were designated as scheduled shutdown bours for annual refueling and other Ixaintenance.

II). REA5ON l2) ME TNOO I A EOVIPMTIIT FAILVRE lEXPLAIN) I - MANuAL S, MAINT~ OR TEST ~ 2 MANUAL SCRAM C RETVELINO 3 AVToMATIC SCRAM O REOVLATORV RESTRICTION 4 O IVER lEXI'LAIN)

E I OI'ERATOR -TRAIN NO AllO LICENSE EXAMINA'IION P AOMINI5TRATIVE O OPERATIONAL ERROR lEXPLAIN)

II - onIER lEXPI.AIN)

AIV COSTA AX "x

P-

OPERATING DATA REPORT DOCKET NO. 50 2~4 Ill Ginna Station DATE 4 8 76 COMPLETED BY a Andy McNama TELEPHONE 1-716-546-2700 Ext. 291-214, at Ginna OPERATING STATUS REPDRTING PERloD: March 1976 GRoss HDURs IH REPDRTING PERI0D: 744

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt)t~QQ MAX. DEPEND. CAPACITY (MWe-Net)t 470 DESIGN ELECTRICAL RATING (MWe.Net)t 470
3. POWER LEVEL To WHICH RESTRICTED (IF ANY) (MWe-Net)t
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

...., ~..... ~76. 8 41 545.59 S. NUMBER OF HOURS REACTOR WAS CRITICAL

6. REACTOR RESERVE SHUTDOWN HOURS
7. HOURS GENERATOR ON LINE

~

~2371 358.339t 40 283.63

8. UNIT RESERVE SHUTDOWN HOURS .... ~ . 8.5*
9. GROSS THERMAL ENERGY GENERATED (MWH)..... ~........ 0 532 560 50 903 434
10. GROSS ELECTRICAL ENERGY GENERATED(MWH) ...,...., .. 0 175 205 16 981 066
11. NET ELECTRICAL ENERGY GENERATED (MWH)...,......... 0 166 526 16 058 891
12. REACTOR SERVICE FACTOR 0 17. 3%
13. REACTOR AVAILABILITYFACTOR 0 20.3% 74. 8/o

~

14. UNIT SERVICE FACTOR.... ~ ~ 0 1 7%9 72%
15. UNIT AVAILABILITYFACTOR 72%
16. UNIT CAPACITY FACTOR (Using MDC) 65%
17. UIIIT CAPACITY FACTOR IU ~ I P O IA Ml'I I...............
18. UNIT FORCED OUTAGE RATE
19. SHUTDOWNS SCHEDULED OYER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)t
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt April 11, 1976
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)( FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
  • Cumulative Data Commencing January 1, 1975 40 ee RSVP t0/ltt

0 Ov n A

hi,

\0 A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 244 UNIT III @irma Station C

Andrew Mclamara, vperations Aide TEI.EPHONF 1-716-546-2700 Ext.291-214 at Ginna March, 1976 MONTH DAY AVERAGE DAILYPOWER LEVEL DAY.AVERAGE DAILY POWER LEVEL (M We-N et) (MWe-Net) 17 0

18 19 20 21 22 23 24 25 10 26 11 27 12 28 13 29 0

14 30 15 31 16 0 INSTRU CTION S On this form, list the average daily unit power level in MWe+'et for each,day iri the reporting month. =

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum depend-able capacity'.is used for the net electrical rating of the unit, thel'e may.'be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). 'n such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly.

'9.87 REVo 10/76

0 t

.rh-h~

H c

DOCKET NO. 50-244 Annual refueling and maintenance

~

SUMMARY

GINNA STATION> UNIT 01 outage. Work continued on f/2 low pressure UNIT NAME turbine blades repair. A" and "B" steam April 8, 1976 generators, inspection and repair, other DATE maintenance. 8W COMPLETED BY Andrew Mc amara, pera ~ons z. e 1-716-546-2700, Ext. 291-214 at Ginna REP0RT MQNTH March 1976 UNIT Sl-IUTDOWN AND POWER REDUCTIONS METHOD OF TYPE SHUTTING DOWN F- FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS/COMMENTS NO. DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POWER (2) 1* 760129 744 *Continuation of this outage for entire report month..

  • Yearly outage 81 began on 1/29/76 as a forced unit shutdown.

Unit shutdown hours beginning 2/1/76 at 0001 were designated as scheduled shutdown hours for annual refueling and other maintenance.

(I) REASON: (2) METHOD:

A - EQUIPMENT FAILURE (EXPLAIN) I - MANUAL 8 - MAINT. OR TEST 2 - MANUAL SCRAM C - REFUELING 3 - AUTOMATIC SCRAM D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

E - OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)