Forwards Monthly Operating Status Report for Month of March 1976
ML18142B386
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/08/1976
From: Platt C
Rochester Gas & Electric Corp
To:
NRC/IE
References
Download: ML18142B386 (12)


Text

NQC FORM 195 (2-76)

U.S. NUCLEAR REGULATORY COMMI N

TO:

NRC LETTER 5PRIGINAL 0 COPY ONOTORIZED

/UNCLASSIFIED PROP INPUT FORM NRC DISTRIBUTION FDR PART 50 DOCKET MATERIAL FROM:

ROCHESTER GAS & ELEC CO ROCHESTER, NY C E PLATT DOCKET NUMBER Ko-5%9 FILE NUMBER MONTHLY REPORT DATE OF DOCUMENT DATE RECEIVED

-P-l4 NUMBER OF COPIES RECEIVED DESCRIPTION LETTER TRANS THE FOLLOWING:

MHNTHLY REPORT FOR PLANT & COMPONENT OPERABILITY &

AVAILABILITY'HISREPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &

OPERATIONS'LANT NAME: QI~ fl4 0

yO, 0~@gGED

'ag 0

MIPC W

CYS FO AC ON FOR ACTION/INFORMATION INTERNALDISTRlBUTION C

D BRANCH CHIEF L Q. Lw EXTERNAL DISTRIBUTION CONTROL NUMBER

.4l

pzuprzir zuz ROCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, 0,

,~~ 10iK, J'- ~

4lktl ROCHESTER, N.Y. 14649 TCLKPHONE

  • ac* cooc v>e 546-2700 Ginna Station March 8, 1976 9(i6<4gi-qgP Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.

C.

20555

Subject:

Monthly Report for March, 1976 Operating Status Information R. E.'inna Nuclear Power Plant Unit No.

1 Docket No. 50-244 Gentlemen:

Pursuant to Technical Specification 6.9.1.c attached herewith is the monthly operating status report for Ginna Station for the month of March,. 1976.

Also ten additional copies of the attachment are enclosed.

Very truly yours, C

i'd%

Charles E. Platt Superintendent CEP:fah Attachments cc:

Mr. James P. O'Reilly, NRC(1)

Mr. William G. McDonald, NRC(2)

l W

OOCKCT NO 50-244 SUKSIARYI Annual refueling and naintenance outage.

Nork conti'nued on f2 low pressure turbine blades repair.

AN and "B" stean generators, inspection and repair, other Tlaintenance.

UNIT NAME GINNA SIATI(Ply VNII III April 8, 1976 OATE COMPLETEO 0 Andrew Hc alxara, pore xons e

TELEPN<<E 1-716-546-2700, Ext. 291-214.at Ginna REPOR'T MONTH lNIT SIIUTDOW /)ND POWER REDUCTIONS NO.

DATE TYPE F FORCEO S-SCIIEOULFO OURATION lHOURS)

REASON l I )

METIIOO OF SIIU'CT I NG 005'N TIIE REACTOR OR REOUCING POTTER l2) coRREcTIYE AcrloNslcotaAENTs 760129 744

  • Continuation of this outage for entire report tenth.

RYearly outage fl began on 1/29/76 as a forced unit shutdown.

Unit shutdown hours beginning 2/1/76 at 0001 were designated as scheduled shutdown bours for annual refueling and other Ixaintenance.

II).

REA5ON A

EOVIPMTIIT FAILVRE lEXPLAIN)

S, MAINT~

OR TEST

~

C RETVELINO O

REOVLATORV RESTRICTION E

OI'ERATOR -TRAIN I NO AllO LICENSE EXAMINA'IION P

AOMINI5TRATIVE O

OPERATIONAL ERROR lEXPLAIN)

II - onIER lEXPI.AIN) l2)

ME TNOO I I - MANuAL 2

MANUAL SCRAM 3

AVToMATIC SCRAM 4

O IVER lEXI'LAIN)

AIV COSTA AX "x

P-

OPERATING DATA REPORT DOCKET NO.

50 2~4 Ill Ginna Station OPERATING STATUS DATE 4 8 76 COMPLETED BY a

Andy McNama TELEPHONE 1-716-546-2700 Ext. 291-214, at Ginna REPDRTING PERloD:

March 1976 GRoss HDURs IH REPDRTING PERI0D:

744 2.

CURRENTLY AUTHORIZED POWER LEVEL(MWt)t~QQ MAX. DEPEND. CAPACITY (MWe-Net)t 470 DESIGN ELECTRICAL RATING (MWe.Net)t 470 3.

POWER LEVEL To WHICH RESTRICTED (IF ANY) (MWe-Net)t 4.

REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE 12.

REACTOR SERVICE FACTOR 13.

REACTOR AVAILABILITYFACTOR 0

0 S.

NUMBER OF HOURS REACTOR WAS CRITICAL...., ~.....

~

6.

REACTOR RESERVE SHUTDOWN HOURS 7.

HOURS GENERATOR ON LINE 8.

UNIT RESERVE SHUTDOWN HOURS....

~.

9.

GROSS THERMAL ENERGY GENERATED (MWH)..... ~........

0 10.

GROSS ELECTRICAL ENERGY GENERATED(MWH)...,....,..

0

11. NET ELECTRICAL ENERGY GENERATED (MWH)...,.........

0

~76. 8

~2 371 532 560 175 205 166 526

17. 3%

20.3%

41 545.59 358.339t 40 283.63 8.5*

50 903 434 16 981 066 16 058 891

74. 8/o 14.

UNIT SERVICE FACTOR....

15.

UNIT AVAILABILITYFACTOR

16. UNIT CAPACITY FACTOR (Using MDC)

~

~

0 1 7%9 72%

72%

65%

17. UIIITCAPACITY FACTOR IU~ I P O IA Ml'II...............~

18.

UNIT FORCED OUTAGE RATE 19.

SHUTDOWNS SCHEDULED OYER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)t 20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt April 11, 1976 21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)(

FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

  • Cumulative Data Commencing January 1,

1975 40 ee RSVP t0/ltt

0 Ov n

A hi,

\\0 A

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

50 244 UNIT III @irma Station C

Andrew Mclamara, vperations Aide TEI.EPHONF 1-716-546-2700 Ext.291-214 at Ginna MONTH

March, 1976 DAY AVERAGE DAILYPOWER LEVEL (MWe-N et)

DAY.AVERAGEDAILYPOWER LEVEL (MWe-Net) 0 17 18 19 20 21 22 23 10 11 12 13 14 15 16 0

0 24 25 26 27 28 29 30 31 INSTRUCTIONS On this form, list the average daily unit power level in MWe+'et for each,day iri the reporting month.

=

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum depend-able capacity'.is used for the net electrical rating of the unit, thel'e may.'be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). 'n such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly.

'9.87 REVo 10/76

0 t

.rh-h~

c H

DOCKET NO.

50-244

SUMMARY

, Annual refueling and maintenance outage.

Work continued on f/2 low pressure turbine blades repair.

A" and "B" steam generators, inspection and repair, other maintenance.

UNIT NAME GINNA STATION> UNIT 01 April 8, 1976 DATE COMPLETED BY~ 8 W Andrew Mc amara, pera

~ons

z. e 1-716-546-2700, Ext. 291-214 at Ginna REP0RT MQNTH March 1976 UNIT Sl-IUTDOWN AND POWER REDUCTIONS NO.

DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)

REASON (I)

METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)

CORRECTIVE ACTIONS/COMMENTS 1*

760129 744

  • Continuation of this outage for entire report month..
  • Yearly outage 81 began on 1/29/76 as a forced unit shutdown.

Unit shutdown hours beginning 2/1/76 at 0001 were designated as scheduled shutdown hours for annual refueling and other maintenance.

(I)

REASON:

A -

EQUIPMENT FAILURE (EXPLAIN) 8 - MAINT. OR TEST C - REFUELING D -

REGULATORY RESTRICTION E -

OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)

H -

OTHER (EXPLAIN)

(2)

METHOD:

I - MANUAL 2 -

MANUAL SCRAM 3 -

AUTOMATIC SCRAM 4 -

OTHER (EXPLAIN)

C L

a