Forwards Monthly Operating Status Report for Month of December 1977
ML18142B362
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/05/1978
From: Lang L
Rochester Gas & Electric Corp
To:
NRC/IE
References
Download: ML18142B362 (10)


Text

NRC FORa'5 U.S. NUCLEAR RFGULATORY COMMIS OO ET NUMBER I2. 7640 NRC DISTRlBUTION FQR PART 50 DOCKET M/TERIAL TO: I N.R;C. FROM: DATE OF DOCUMENT Rochester, N. Y. 14649 01/05/78 Lee S. Lang DATE RECEIVED Ol/10/78 BETTE R 0 NOTOR Z E D I PROP INPUT FORM NUMBER OF COPIES RECEIVED

{@IRIGINAL UN C LASS I F I E D QCOPY DESCRIPTION ENCLOSURE LTR TED 'IHE FOLLOWING: ANGRY REPCgj.'OP 'DECEMBER, 197.7 PLUG.' CGMP(XKVZ OPERABILITY & AVAILABIIZIY.

THIS'EPORT TO BE USE IN PHEPARlNG GRAY BOOK BY PLANS 6'OHZATXOHS.

1p 3p.

PLANI ~. R. E. GINNA,UNIT 8 jcm 01/10/78 1

FOR ACTION/INFORMATION HIPG W FOR INTERNAL D IST R I BUTION R

EXTERNAL DISTRIBUTION CONTROL NUMBER TIC: /

78oioooy2

e' F~

0 @ggjgtt Ic,'Nf fILHNT ZZ~"=";:::;

ROCHESTER GAS AND ELECTRIC CORPORATION 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHONE AREA coDE 715 546.2700 Ginna Station January 5, 1978 E

Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission ggf/P~

Washington, D. C. 20555

Subject:

Monthly report for December, 1977 Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Gentlemen:

Pursuant to Technical Specification 6.9.1.c attached herewith is the monthly operating status report for Ginna Station for the month of December, 1977. Also, ten additional copies of the attach-ment ere enclosed.

Very truly yours, Superintendent LSL:fah Attachments cc: Mr. Boyce H. Grier (1)

Mr. William G. McDonald, NRC (2)

0 k'i<:1 +

1 kW OPERATING DATA REPORT DOCKET NO.

UNIT Nl Ginna Station DAT f Januar 5 1978 COMPLETED BY E. Mc amara,

~B'ndrew perat o s ide TELEPHONE Ext. 291-205 at Ginna OPERATING STATUS

1. REPDRTING PERI0D: December 1977 GRoss H0URs IN REPoRTING PERI0D: 744
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWeAet):
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE S. NUMBER OF HOURS REACTOR WAS CRITICAL

6. REACTOR RESERVE SHUTDOWN HOURS
7. HOURS GENERATOR ON LINE

... ~..........

726.5

~

7,569.11 54,038.62

~391~

A2

'i'28

8. UNIT RESERVE SHUTDOWN HOURS 0

~U K)8 ~D~942

9. GROSS THERMAL ENERGY GENERATED(MWH).........
10. GROSS ELECTRICAL ENERGY GENERATED (MWH)
11. NET ELECTRICAL ENERGY GENERATED

~ ..

(MWH)........

~ ~ .

~

~

~

Y ~

~

~

~

~

~

~

~

~

~~

~SEi328.

~~~

~l~)4 %2e1i~MO

~~JJt8 29.D332.e294

12. REACTOR SERVICE FACTOR ... ~
13. REACTOR AVAILABILITYFACTOR

~

lk. UIIIT SERVICE FACTOR

15. UNIT AVAILABILITYFACTOR ~ ~ ~ ~ ~ ~

k 16 ~ UNIT CAPACITY FACTOR (Using MDC) ll. OMIT CAPACITY FACTOR (U I R D Il MW )..............,

O

18. UNIT FORCED OUTAGE RATE ~ ~ k ~ \
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AHD DURATIOH OF EACH):
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPE
21. UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION)1 FORECAST ACHIEVED INITIALCRITICALITY IHITIALELECTRICITY COMMERCIAL OPERATION
  • Cumulative Data Commencing January 1, 1975 40 ee RRVk 10kP75

P

'i) t,

AVERAGE DAILY UNIT POWER UNIT NQ. 50 244

'OCKET UNIT Nl Ginna Stat'Januar 5 1978 COMPLETED BY Andrew P. %cNamara, Operation ide TELEPHONE 1-716-546-2700 Ext. 291-205 .at Ginna MONTH December 1977 DAY AVERAGE DAILY POWER LEVEL DAY, AVERAGE DAILY POWER LEVEL (M We-Net) (MWe-Net) 416 17 415 397 18 415 84 416 385 417 20

'13 21 417 415 22 415 23 416 414 416 8 24 415 25 415 414 414 10 26 413 2l 415 414 415 12 28 13 415 29 14 415 30 416 416 415 15 31 16 415 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

49 87 (RKVo I/7$ )

~ ~

I I

V.i

DOCKET NO. 50-244 The Reactor Power Level averaged UNIT NAME GINNA STATION, UNIT Ii'I 100% in the Report Month. The exception were: A unit shutdown, detailed below, DATE January 5, 1978 and a Reactor Power Level reduction to

~ 96% on 12/16 to perform an Auxiliary Feedwater System Periodic Test.

COMPLETED BY Andrew E. McNamara, Operation ide TELEPHQNE 1-716-546-2700 Ext. 291-205, at Ginna December, 1977 REPORT MONTH UNIT SHUTDOWN AND POWER REDUCTIONS METHOD OF TYPE SHUTTING DOWN F-FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS/COMMENTS NO. DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POWER (2) 12/03/77 17 /5 A Leaking Pipe Tap Residual Heat Removal System (I) REASON: '(2) METHOD:

A - EQUIPMENT FAILURE (EXPLAIN) I - MANUAL 8 - MAINT OR TEST 2 - MANUAL SCRAM C - REFUELING 3 - AUTOMATIC SCRAM D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

E - OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)

REU. 10/75 49 89