Forwards Monthly Operating Status Report for Month of December 1977
ML18142B362
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/05/1978
From: Lang L
Rochester Gas & Electric Corp
To:
NRC/IE
References
Download: ML18142B362 (10)


Text

U.S. NUCLEAR RFGULATORY COMMIS NRC FORa'5 I2.7640 NRC DISTRlBUTION FQR PART 50 DOCKET M/TERIAL OO ET NUMBER TO: I N.R;C.

FROM:

Rochester, N. Y.

14649 Lee S. Lang DATE OF DOCUMENT 01/05/78 DATE RECEIVED Ol/10/78 BETTE R

{@IRIGINAL QCOPY DESCRIPTION 0 NOTOR IZ E D UN C LASS I F I E D PROP INPUT FORM ENCLOSURE NUMBER OF COPIES RECEIVED LTR TED

'IHE FOLLOWING:

1p ANGRY REPCgj.'OP

'DECEMBER, 197.7 PLUG.'

CGMP(XKVZ OPERABILITY & AVAILABIIZIY.

THIS'EPORT TO BE USE IN PHEPARlNG GRAY BOOK BY PLANS 6'OHZATXOHS.

3p.

PLANI~. R. E. GINNA,UNIT 8 1

jcm 01/10/78 HIPG W FOR FOR ACTION/INFORMATION R

INTERNALDISTR I BUTION TIC:

EXTERNAL DISTRIBUTION CONTROL NUMBER

/

78oioooy2

e' F~

0

@ggjgtt Ic,'NffILHNT ZZ~"=";:::;

ROCHESTER GAS AND ELECTRIC CORPORATION 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHONE AREA coDE 715 546.2700 Ginna Station January 5, 1978 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.

C. 20555 E

ggf/P~

Subject:

Monthly report for December, 1977 Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Gentlemen:

Pursuant to Technical Specification 6.9.1.c attached herewith is the monthly operating status report for Ginna Station for the month of December, 1977.

Also, ten additional copies of the attach-ment ere enclosed.

Very truly yours, LSL:fah Attachments

, cc:

Mr. Boyce H. Grier (1)

Mr. William G. McDonald, NRC (2)

Superintendent

0 k'i<:1 +

1 kW OPERATING DATA REPORT DOCKET NO.

OPERATING STATUS UNIT Nl Ginna Station DATf Januar 5

1978 COMPLETED BY

~B'ndrew E.

Mc amara, perat o s ide TELEPHONE Ext. 291-205 at Ginna 1.

REPDRTING PERI0D:

December 1977 GRoss H0URs IN REPoRTING PERI0D:

744 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWeAet):

4.

REASONS FOR RESTRICTION (IF ANY):

S.

NUMBER OF HOURS REACTOR WAS CRITICAL... ~..........

THIS MONTH YR TO DATE 7,569.11 CUMULATIVE 54,038.62 6.

REACTOR RESERVE SHUTDOWN HOURS 7.

HOURS GENERATOR ON LINE 8.

UNIT RESERVE SHUTDOWN HOURS 726.5 0

A2

'i'28

~ ~391~

  • 9.

GROSS THERMAL ENERGY GENERATED(MWH).........

~

Y

~

~

~ ~SEi328. ~U K)8 ~D~942 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH)

~..

~

~.

~

~.

~

~~~ ~l~)4 %2e1i~MO 11.

NET ELECTRICAL ENERGY GENERATED (MWH)........ ~

~.

~

~ ~~~

~~JJt8 29.D332.e294 12.

REACTOR SERVICE FACTOR...

~

13.

REACTOR AVAILABILITYFACTOR lk. UIIITSERVICE FACTOR 15.

UNIT AVAILABILITYFACTOR 16 ~ UNIT CAPACITY FACTOR (Using MDC)

~

~

~

~

~

~

k ll. OMIT CAPACITY FACTOR (U I

R D Il MW )..............,~

18.

UNIT FORCED OUTAGE RATE O

~

~

k

~

\\

19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AHD DURATIOH OF EACH):

20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPE 21.

UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION)1 FORECAST ACHIEVED INITIALCRITICALITY IHITIALELECTRICITY COMMERCIALOPERATION

  • Cumulative Data Commencing January 1, 1975 40 ee RRVk 10kP75

P

'i) t, AVERAGE DAILYUNIT POWER UNIT

'OCKET NQ.

50 244 UNIT Nl Ginna Stat'Januar 5

1978 MONTH December 1977 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)

COMPLETED BY Andrew P. %cNamara, Operation ide TELEPHONE 1-716-546-2700 Ext. 291-205.at Ginna DAY,AVERAGE DAILYPOWER LEVEL (MWe-Net) 8 10 12 13 14 15 16 416 397 84 385

'13 415 414 415 414 413 414 415 415 416 415 17 18 20 21 22 23 24 25 26 2l 28 29 30 31 415 415 416 417 417 415 416 416 415 414 415 415 416 415 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

49 87 (RKVo I/7$ )

~

~

I I

V.i

DOCKET NO.

50-244 The Reactor Power Level averaged 100% in the Report Month.

The exception were:

A unit shutdown, detailed below, and a Reactor Power Level reduction to

~

96% on 12/16 to perform an Auxiliary Feedwater System Periodic Test.

December, 1977 REPORT MONTH UNIT NAME GINNA STATION, UNIT Ii'I DATE January 5,

1978 COMPLETED BY Andrew E. McNamara, Operation ide TELEPHQNE 1-716-546-2700 Ext. 291-205, at Ginna UNIT SHUTDOWN AND POWER REDUCTIONS NO.

DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)

REASON (I)

METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)

CORRECTIVE ACTIONS/COMMENTS 12/03/77 17 /5 A

Leaking Pipe Tap Residual Heat Removal System (I)

REASON:

A -

EQUIPMENT FAILURE (EXPLAIN) 8 - MAINT OR TEST C - REFUELING D -

REGULATORY RESTRICTION E -

OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)

H -

OTHER (EXPLAIN)

'(2)

METHOD:

I -

MANUAL 2 -

MANUAL SCRAM 3 -

AUTOMATIC SCRAM 4 -

OTHER (EXPLAIN)

REU.

10/75 49 89

4

~ ~v 0

RiCFIVFO QQCQ!<pg

~>.v "~ S~""'i Ul<" "A~ l0 01 9 5

'I