MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] Category:Operating Report
MONTHYEARML18137A2162018-05-31031 May 2018 Annual Radiological Environmental Operating Report: January 1, 2017 - December 31, 2017 ML18137A2132018-05-11011 May 2018 and Independent Spent Fuel Storage Installation - Submittal of 2017 Annual Radioactive Effluent Release Report and 2017 Annual Radiological Environmental Operating Report ML0509503022005-03-30030 March 2005 R. E. Ginna Nuclear Power Plant, Transmittal of Core Operating Limits Report (COLR) ML0414204852003-12-31031 December 2003 2003 Annual Radiological Environmental Operating Report ML18142B3531978-09-0707 September 1978 Forwards Monthly Operating Status Report for Month of August 1978 ML18142B3541978-08-0303 August 1978 Forwards Monthly Operating Status Report for Month of July, 1978 ML18142B3551978-07-10010 July 1978 Forwards Monthly Operating Status Report for Month of June, 1978 ML18142B3561978-06-14014 June 1978 Forwards Monthly Operating Status Report for Month of May, 1978 ML18142B3571978-04-0505 April 1978 Forwards Monthly Operating Status Report for Month of March, 1978 ML18142B3581978-03-0707 March 1978 R.E. Ginna - Forwards Monthly Operating Status Report for Month of February 1978 ML18142B3591978-02-0909 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3611978-02-0606 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3621978-01-0505 January 1978 Forwards Monthly Operating Status Report for Month of December 1977 ML18142B3631977-12-0505 December 1977 Forwards Monthly Operating Status Report for Month of November 1977 ML18142B3851976-05-0505 May 1976 R.E Ginna - Forwards Monthly Operating Status Report for Month of April 1976 ML18142B3861976-03-0808 March 1976 Forwards Monthly Operating Status Report for Month of March 1976 ML18142B3871976-03-0505 March 1976 Forwards Monthly Operating Status Report for Month of February 1976 ML18142B3971975-07-0707 July 1975 R. E. Ginna - Forwards Monthly Operating Status Information for Month of June 1975 2018-05-31
[Table view] Category:Monthly
MONTHYEARML18142B3531978-09-0707 September 1978 Forwards Monthly Operating Status Report for Month of August 1978 ML18142B3541978-08-0303 August 1978 Forwards Monthly Operating Status Report for Month of July, 1978 ML18142B3551978-07-10010 July 1978 Forwards Monthly Operating Status Report for Month of June, 1978 ML18142B3561978-06-14014 June 1978 Forwards Monthly Operating Status Report for Month of May, 1978 ML18142B3571978-04-0505 April 1978 Forwards Monthly Operating Status Report for Month of March, 1978 ML18142B3581978-03-0707 March 1978 R.E. Ginna - Forwards Monthly Operating Status Report for Month of February 1978 ML18142B3591978-02-0909 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3611978-02-0606 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3621978-01-0505 January 1978 Forwards Monthly Operating Status Report for Month of December 1977 ML18142B3631977-12-0505 December 1977 Forwards Monthly Operating Status Report for Month of November 1977 ML18142B3851976-05-0505 May 1976 R.E Ginna - Forwards Monthly Operating Status Report for Month of April 1976 ML18142B3861976-03-0808 March 1976 Forwards Monthly Operating Status Report for Month of March 1976 ML18142B3871976-03-0505 March 1976 Forwards Monthly Operating Status Report for Month of February 1976 ML18142B3971975-07-0707 July 1975 R. E. Ginna - Forwards Monthly Operating Status Information for Month of June 1975 1978-09-07
[Table view] |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM <RIDS)
DISTRIBUTION FOR INCOMING MATERIAL 50-244 REC: ORG: SNOW B DOCDATE: 09/07/78
'NRC ROCHESTER GAS 8( ELEC DATE RCVD: 09/18/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR 1 ENCL 1 FORWARDING SUBJECT FACILITY"8 MONTHLY OPERATING REPT FOR THE MONTH OF AUGUST>
1978.
PLANT NAME: RE GINNA UNIT 1 REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL:
~
wee w H +e%%%o+m+x DISTRIBUTION OF TH IS MATERIAL IS AS FOLl OWS ++w+ww+wwwwww+ww++
')
'ANNUAL'EMI-ANNUAL0 MONTflLY OPERATING RPTS (OL STAGE>
( DISTRIBUTION CODE A008)
FOR ACTION: BR CHIEF ORBS2 BC@->W/6 ENCL INTERNAL: NRC PDR+4W/ENCL I 0 E~~~W/2 ENCL MIPC4>W/2 ENCL k<ANAUER+~W/ENCL DIRECTOR DOR4~+W/ENCL AD FOR SYS 8( PROJ>+W/ENCL ENGINEERING BR>>W/ENCL REACTOR SAFETY BR++W/ENCL PLANT SYSTEMS BR<%W/ENCL EEB~~W/ENCL CORE PERFORMANCE BR>4W/ENCL EFFLUENT TREAT SYS<NW/ENCL EXTERNAL: LPDR S ROCHESTER) NY++W/ENCL NATL LAB ORNL+4W/ENCL TERA++W/ENCL NSIC>+W/ENCL BROOk'HAVEN>wW/ENCL ACRS CAT 8+NW/16 ENCL DISTRIBUTION: LTR 43 ENCL 43 CONTROL NBR: 780870316 SIZE: 1P+5P
%%%4%% 4 %%%% 4 %%%4%%%%%%%% 0M %%%%%%%% 4 THE END 44f+%%%%4%%4%%%%%%%%%%%%A4ENk
~ ~
R I II, I I R
I h
R I J.
II Ji.
il II R
I,
R1 II R
I I li J
II I
~
"l R R
I R, R R R
' I
~ R R R ~
'I I I 1 II
'l IR ,
t /IIIIIIIIII/ IIIIIII/
IIIII// I ///I/////Z/I II/I///I /IIIIIII/
ROCHESTER GAS AND ELECTRIC CORPORATtON ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHONIC AREA coDc 7>6 546 2700
'7 CD v<
Gi'nna Stag.on September'~7, 1978 i
~,
~ I
- X;.2 ~j gl,fJkg)
~ <<g n
Vl C/)
Director, Office of Management Information and Program Control U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555
Subject:
Monthly Report for August, 1978 Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the aenthly operating status report for Ginna Station for the month of August, 1978.
Very truly yours, Bruce Snow Superintendent Attachments 780870316 oof s+
I ]
0 'I u
II,
OPERATlNG DATA REPORT DOCKET NO.
DATF Se tember 8 1978 COMPLETED BY 2' Andrew E. Mc amara, Operat on e TELEPHONE 1-716-546-2700
~ OPERATING STATUS Ext. 291-205 at Ginna
- 1. Unit Name: GINNA STATION N Notes The. Unit experienced Reporttng Period'u us t 1978 one outage during the Report
- 3. Licensed Thermal Power (MWt):
1520 Period, detailed on Page 3.
A Power Level Reduction to
- 4. Nameplate Rating (Gross MWe):
470 ~48% on 8/20 is detailed
- 5. Design Electrical Rating (Net MWe): on Page 4.
- 6. hiaximum Dependable Capacity (Gross hfWe):
- 7. hiaximum Dependable Capacity (Net hiWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, If Any (Net hIWe):
- 10. Reasons For Restrictions, If Any:
This hionth Yr:to-Date Cumulative 744 5 831 76 823
- 11. Hours In Reporting Period
- 13. Reactor Reserve Shutdown Hours 5. 75 445.42 1 546.51 >>
- 14. Hours Generator On-Line 8.5
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1 081 872 614802 74 585 07
- 17. Gross Electrical Energy Generated (MWH) 355 865 1 928 512 24 116 372
- 18. Net Electrical Energy Generated (hiWH) 338 684 1 831 418 22 813 712 96% 71% 74%
- 19. Unit Service Factor
- 20. Unit Availability Factor 96% 69% 68%
- 21. Unit Capacity Factor (Using MDC Net) 96% 69% 68%
- 22. Unit Capacity Factor (Using,DER Net) 2% 6% 11%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. If Shut Down At End Of Report. Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COhihiERCIAL OPERATION
>> Cumulative Total Commencing January 1, 1975 49 dd (Rav 1/7dl
S 1
1 S
AVERAGE DAILY UNIT POWER UNIT DOCKET NO.
UNIT III @irma Stat'o Se tember 8 1 8 COMPLETED BY Andrew E. McNamara, Operations Aide TELFPHON F 1-716-546-2700 Ext. 291-205, at Ginna MONTH August, 1978 DAY AVERAGE DAILY POWER LEVEL DAYAVERAGEDAlLY POWER LEVEL (MWe-Net) (MWe-Net) 471 468 17 18 477 ls 46 473 20 409 472 21 ~ 468 22 23 4 0 24 470 25 474 10 26 27 12 28 13 29 477 14 470 30 474 15 31 469 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
to the nearest whole megawatt. 'ompute 4> 87 (REVe 1/78)
I pr 4 I r
I
' ~
R
~
~ ~ ~
C 4
C
/lW 4
DOCKET NO. SO-244
¹1 Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS COMPLETED I3 Y Andrew E. HcNamara, Operations Aide TELEPllONE 1-716-546-2700 Ezt. 291-205, at Ginna 0
e~0 c 0 Licensee c
0 ltd Couse & Corrective 0
Em= c Ho. Dote 0 0 o ~>L Event 0 0 0 Action to a 0 Ul 0 X,' ~ l 0 n C Report ¹ iA 0 E Prevent Recurrencc 0 O O
780826 F 18.25 A Not IA Instru. Burned out coil in Reactor Trip Applicable Logic.
1 2 F: Forced Reason: hlethod: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1 hlanual for Preparation of Data I3-hlaintcnancc or Test 2-hlanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) 49 89 (REV t/78) H-Other (Explain) Exhibit 1 - Same Source
+~~
~ I ~
~ ~
'4 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 0 2 UNIT Ginna Station Unit 81 DATE Se tember 8 1978 COMPLETED BY Andrew E. McNamara, Operations de TELEPHONE 1-716-546-2700 Ext. 291-205, at Ginna MONTH AUGUST 1978 4
The Reactor Power Level averaged 100% in the Report Month, with the following major exceptions:
On 8/20, the Reactor Power Level was reduced to~48% to perform the Turbine Main Steam Stop Valves Test.
On 8/26, a Reactor Trip/Turbine Trip occurred, due to a burned out coil in Reactor Trip Logic. See Details, Page 3. The Unit was restored to service on 8/27 after repairs were effected.
49 123 u/ 73)
'I ~ l
~ - r
Ginna Station MAINTENANCE REPORT FOR AUGUST, 1978 During August, normal inspection and minor maintenance was performed.
Major safety related maintenance indluded:
- 1. Replacement of a diaphragm on the boric acid filter outlet valve.
- 2. Repair of the fuse block stabs on the 1B Emergency Diesel Generator Tie Breaker to Bus 16 (LER 78-07).
- 3. Completed replacement of the hinge assembly on the containment personnel hatch outer door due to a bent hinge pin.
- 4. Repair of a defective torque switch to valve 3504 Main Steam to the Auxiliary Feedwater Pump.