Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) 2024-09-25
[Table view] Category:Operating Report
MONTHYEARML18137A2162018-05-31031 May 2018 Annual Radiological Environmental Operating Report: January 1, 2017 - December 31, 2017 ML18137A2132018-05-11011 May 2018 and Independent Spent Fuel Storage Installation - Submittal of 2017 Annual Radioactive Effluent Release Report and 2017 Annual Radiological Environmental Operating Report ML0509503022005-03-30030 March 2005 R. E. Ginna Nuclear Power Plant, Transmittal of Core Operating Limits Report (COLR) ML0414204852003-12-31031 December 2003 2003 Annual Radiological Environmental Operating Report ML18142B3531978-09-0707 September 1978 Forwards Monthly Operating Status Report for Month of August 1978 ML18142B3541978-08-0303 August 1978 Forwards Monthly Operating Status Report for Month of July, 1978 ML18142B3551978-07-10010 July 1978 Forwards Monthly Operating Status Report for Month of June, 1978 ML18142B3561978-06-14014 June 1978 Forwards Monthly Operating Status Report for Month of May, 1978 ML18142B3571978-04-0505 April 1978 Forwards Monthly Operating Status Report for Month of March, 1978 ML18142B3581978-03-0707 March 1978 R.E. Ginna - Forwards Monthly Operating Status Report for Month of February 1978 ML18142B3591978-02-0909 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3611978-02-0606 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3621978-01-0505 January 1978 Forwards Monthly Operating Status Report for Month of December 1977 ML18142B3631977-12-0505 December 1977 Forwards Monthly Operating Status Report for Month of November 1977 ML18142B3851976-05-0505 May 1976 R.E Ginna - Forwards Monthly Operating Status Report for Month of April 1976 ML18142B3861976-03-0808 March 1976 Forwards Monthly Operating Status Report for Month of March 1976 ML18142B3871976-03-0505 March 1976 Forwards Monthly Operating Status Report for Month of February 1976 ML18142B3971975-07-0707 July 1975 R. E. Ginna - Forwards Monthly Operating Status Information for Month of June 1975 2018-05-31
[Table view] Category:Monthly
MONTHYEARML18142B3531978-09-0707 September 1978 Forwards Monthly Operating Status Report for Month of August 1978 ML18142B3541978-08-0303 August 1978 Forwards Monthly Operating Status Report for Month of July, 1978 ML18142B3551978-07-10010 July 1978 Forwards Monthly Operating Status Report for Month of June, 1978 ML18142B3561978-06-14014 June 1978 Forwards Monthly Operating Status Report for Month of May, 1978 ML18142B3571978-04-0505 April 1978 Forwards Monthly Operating Status Report for Month of March, 1978 ML18142B3581978-03-0707 March 1978 R.E. Ginna - Forwards Monthly Operating Status Report for Month of February 1978 ML18142B3591978-02-0909 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3611978-02-0606 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3621978-01-0505 January 1978 Forwards Monthly Operating Status Report for Month of December 1977 ML18142B3631977-12-0505 December 1977 Forwards Monthly Operating Status Report for Month of November 1977 ML18142B3851976-05-0505 May 1976 R.E Ginna - Forwards Monthly Operating Status Report for Month of April 1976 ML18142B3861976-03-0808 March 1976 Forwards Monthly Operating Status Report for Month of March 1976 ML18142B3871976-03-0505 March 1976 Forwards Monthly Operating Status Report for Month of February 1976 ML18142B3971975-07-0707 July 1975 R. E. Ginna - Forwards Monthly Operating Status Information for Month of June 1975 1978-09-07
[Table view] |
Text
F REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DISTRIBUTION FOR INCOMING MATERIAL 50-244 ORG: LANG L S DOCDATE: 02/06/78 ROCHESTER GAS 8. ELEC DATE RCVD: 02/23/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
l" LTR 1 ENCL 10 MONTHLY OPERATING REPT FOR THE MONTH OF JANUARY'978.
PLANT NAME: RE GINNA UNIT 1 REV IEI JER IN I T I AL: X JM DISTRIBUTOR INITIAL:
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.
(DISTRIBUTION CODE AQQ3)
FOR ACTION." BR CHIEF Z IEMANN4+W/2 ENCL INTERNAL: REG FT 'ENCL NRC,PDR+4l J/ENCL OR ACTION++W/2 ENCL EXTERNAL: LPDR S ROCHESTER'Y++W/ENCL T I C+wW/ENCL NS I C+~W/ENCL Bhli(NATLAB)++W/ENCL ACRS CAT 8++4/0 ENCL i
DISTRIBUTION: LTR 10 ENCL 10 CONTROL NBR: 780550018 SIZE: 1 P+4P END
4 I
L
%r
t yzmwzz( ezz IIFeIIM'R;PI I)."~I('i7 i'~.r. <IIII'II Z'~ ZuZiZ ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHONE AREA cooK 7IK 546-2700 Ginna Station February 6, 1978 Director, Office of Inspection and. Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Sub)ect: Monthly Report for January, 1978 Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Gentlemen:
Pursuant to Technical Specification 6.9.l.c attached. herewith is the monthly operating status report for Ginna Station for the month of January, 1978. Also, ten additiona1 copies of the attach-ment are enclosed..
Very truly yours, Lee S. Lang Superintendent LSL:fah Attachments cc: Mr. Boyce H. Grier (1)
Mr. William G. McDona1d, NRC (2) 7505500i5~
A 0 ~ ~
tQ'(VUQ 833lhU3s nairngt>i,'s~g
<<H S f",.
f~;)l 44 H:~An~00 0~~~.:-aaz
OPERATING DATA REPORT DOCKET NO. 5 244 DATE Fe ruar 3 1978 COMPLETED BY Andrew E. McNamara, Operations Aide TELEPHONE 1-716-546-2700 OPERATING STATUS Ext. 291-205 at Ginna
- l. Unit Name'GINNA STATION Notes Line 11:
- 2. Reporting Period: The number of hours in
- 3. Licensed. Thermal Power (MWt): Reporting Period, Cumula-490 tive, are from date of
- 4. Nameplate Bating (Gross MWe):
- 5. Design Electrical Rating (Net MWe): Initial, on-line of
- 6. Maximum Dependable Capacity (Gross MWc): 490 generator, not date of 470 commercial operation.
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative ll. Hours In Reporting Period 744 744 587 71 736
- 12. Number of Hours Reactor Was Critical 54,625.62',101.09
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line jal Unit Reserve Shutdown Hours 8.5
872,256 872,256 .69,309,298
- 16. Gross Thermal Energy Generated (MWH) 239,624 239,624 22 427 484
- 18. Net Electrical Energy Gcncrated (MWH) 79% 79% 74%
- 19. Unit Service Factor
- 20. Unit Availability Factor 2 Et/ 72% 70%
- 21. Unit Capacity Factor (Using MDC Net) 72% 70%
- 22. Unit Capacity Factor (Using,DFR Net) 12%
21%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Schcdulcd Over Next 6 Months (Type, Date and Duration of Each):
Refueling March 17, 1978 6 weeks
- 25. If Shut Down At End Of Report. Period, Estimated Date of Startup: February
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achtcved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 40 ~ 88 (Rcv 1/7dl
- Cumulative Data Commencing January 1, 1975
~ ~
E
AVERAGE DAILY UNIT POWER UNIT DOCKET NO. 50 244 Stat'o UNIT Nl @irma Februar 3 1978 COMPLETED BY Andrew E. McNamara, Operations Aide 1-716-546-2700, TELEPHONE Ext. 291-205, at Ginna MONTH January, 1978 DAY AVERAGE DAILY POWER LEVEL DAY, AVERAGE DAILY POWER LEVEL (M We-Net) (MWe-Net) 415 17 415 415 18 415 416 1S 416 415 20
,415 415 21 417 416 22 416 416 23 416 416 416 357 25 414 10 26
'fc 376 367
- Unit Shutdown INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month, to the nearest whole megawatt. 'ompute 48 ~ 87 (REVe I/78l
C 4 I J
DOCKET NO.
N1 Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS DATE Februar 3 1978 COMPLEl ED I3Y Andrew E. McNamara, Ope ations AitII'.
REPORT MONTH l'ELEPHONF 1-716-546-2700 Ext. 291-205 At Ginna Pl L
0 01 o- C c ul 0 se c c u Licensee Em- o Cause & Corrective 0 0 0 0 !
0 No. Date 0 0 Vl Cl Event 0 0 0 Action to 0 Vl I- .n 0 X: Cl 0lh C Report lw l/l 0 0
oU Prevent Recurrence 0
n 780125 F 157 A 78-03 .CB HTEXCH "B" Steam Generator, Tube Leak (Refer to L.E.R. 78-03 for Corrective Actions)
F: Forced Reason: hlcthod: Exhibit~ Instructions S: Scheduled A-Equipmcnt Failure (Explain) 1-hlanual for Preparation of Data I3-hfaintenancc or Test 2-hlanual Scram. Entry Sheets for Licensee C-Rcfucling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain) 49.89 (Rave 1/78) H-Other (Explain) Exhibit~- Same Source
sl
, I
., l
> c Ql L
t ~
I ~
C.
I il'J
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 0-2 UNIT DATE February 3, 1978 COBPLETED BY Andrew E. McNamara, Operations Aide TEI,EpHONE 1-716-546-2700, Ext. 291-205 at Ginna MONTH JANUARY, 1978 The Reactor Power Level averaged 100% in the Report Month. The exceptions were:
Two unit power level reductions to ~ 48% to repair condenser tube leaks, on 1/ll and 1/14, respectively.
A unit shutdown on 1/25 to effect repairs on the "B" steam generator, tube leak.
The unit remained shutdown at the end of the Report Period.
40 ~ IE3 u/78)
4 a