Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 and Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24067A2532024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators 2024-09-24
[Table view] Category:Operating Report
MONTHYEARML18137A2162018-05-31031 May 2018 Annual Radiological Environmental Operating Report: January 1, 2017 - December 31, 2017 ML18137A2132018-05-11011 May 2018 and Independent Spent Fuel Storage Installation - Submittal of 2017 Annual Radioactive Effluent Release Report and 2017 Annual Radiological Environmental Operating Report ML0509503022005-03-30030 March 2005 R. E. Ginna Nuclear Power Plant, Transmittal of Core Operating Limits Report (COLR) ML0414204852003-12-31031 December 2003 2003 Annual Radiological Environmental Operating Report ML18142B3531978-09-0707 September 1978 Forwards Monthly Operating Status Report for Month of August 1978 ML18142B3541978-08-0303 August 1978 Forwards Monthly Operating Status Report for Month of July, 1978 ML18142B3551978-07-10010 July 1978 Forwards Monthly Operating Status Report for Month of June, 1978 ML18142B3561978-06-14014 June 1978 Forwards Monthly Operating Status Report for Month of May, 1978 ML18142B3571978-04-0505 April 1978 Forwards Monthly Operating Status Report for Month of March, 1978 ML18142B3581978-03-0707 March 1978 R.E. Ginna - Forwards Monthly Operating Status Report for Month of February 1978 ML18142B3591978-02-0909 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3611978-02-0606 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3621978-01-0505 January 1978 Forwards Monthly Operating Status Report for Month of December 1977 ML18142B3631977-12-0505 December 1977 Forwards Monthly Operating Status Report for Month of November 1977 ML18142B3851976-05-0505 May 1976 R.E Ginna - Forwards Monthly Operating Status Report for Month of April 1976 ML18142B3861976-03-0808 March 1976 Forwards Monthly Operating Status Report for Month of March 1976 ML18142B3871976-03-0505 March 1976 Forwards Monthly Operating Status Report for Month of February 1976 ML18142B3971975-07-0707 July 1975 R. E. Ginna - Forwards Monthly Operating Status Information for Month of June 1975 2018-05-31
[Table view] Category:Monthly
MONTHYEARML18142B3531978-09-0707 September 1978 Forwards Monthly Operating Status Report for Month of August 1978 ML18142B3541978-08-0303 August 1978 Forwards Monthly Operating Status Report for Month of July, 1978 ML18142B3551978-07-10010 July 1978 Forwards Monthly Operating Status Report for Month of June, 1978 ML18142B3561978-06-14014 June 1978 Forwards Monthly Operating Status Report for Month of May, 1978 ML18142B3571978-04-0505 April 1978 Forwards Monthly Operating Status Report for Month of March, 1978 ML18142B3581978-03-0707 March 1978 R.E. Ginna - Forwards Monthly Operating Status Report for Month of February 1978 ML18142B3591978-02-0909 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3611978-02-0606 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3621978-01-0505 January 1978 Forwards Monthly Operating Status Report for Month of December 1977 ML18142B3631977-12-0505 December 1977 Forwards Monthly Operating Status Report for Month of November 1977 ML18142B3851976-05-0505 May 1976 R.E Ginna - Forwards Monthly Operating Status Report for Month of April 1976 ML18142B3861976-03-0808 March 1976 Forwards Monthly Operating Status Report for Month of March 1976 ML18142B3871976-03-0505 March 1976 Forwards Monthly Operating Status Report for Month of February 1976 ML18142B3971975-07-0707 July 1975 R. E. Ginna - Forwards Monthly Operating Status Information for Month of June 1975 1978-09-07
[Table view] |
Text
~ ng ll/Qg REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DISTRIBUTION FOR INCOMING MATERIAL 50-244 REC: ORG: LANG L S DOCDATE: 04/05/78 NRC ROCHESTER GAS 8c ELEC DATE RCVD: 04/i0/78 OOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR i ENCL i
=ORWARDING SUBJECT FACILITY"S MONTHLY OPERATING REPT FOR MARCHr i978.
i PLANT NAME: RE GINNA UNIT REVIEWER DISTRIBUTOR INITIAL: XJM INITIAL: ~
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.
(DISTRIBUTION CODE A003)
FOR ACTION: BR CHIEF ++W/2 ENCL INTERNAL: EG FILE++M/E CL NRC PDR+%W/ENCL
/2 ENCL EXTERNAL: LPDR S ROCHESTER'Y++W/ENCL T I C~~+W/ENCL NSI C4 +W/ENCL BNL(NATLAB)4+W/ENCL ACRS CAT B+>W/0 ENCL DISTRIBUTION: LTR iO ENCL iO CONTROL NBR: 78ioi0033 SIZE: i P+5P
%%%4%4%% 4M0M 4%4%%%4HHHF Rf %4 g%%%%4 %4%% THE END %4%+4k4%%4 4 4%4 4 4 %4%%+
~ e (w l I a Rld
~
IIIIII/ IIIIIIIIIII IIII /III IIIIIIIIIIIII ETATK II/g IIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. t4649 TELEPHONE AREA cooE lid 546-2700 Ginna Station 1978 g< EI'k FT$
l LRL En<'I
@))gita's ~le~
~/Q C~
Vl O>
(Tl EOm V CAMEO MA7 Director, Office of Management Information and Program Control U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555
Subject:
Monthly Report for March, 1978 Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Gentlemen:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1978.
Very truly yours, Lee S. Lang Superintendent LSL:fah Attachments 7810iO033 I,or,
0 ~ ~
V:
'I I
,r I
'I V
lt IV I I I
I il ~ ', ~
J II'I;I I I
OPERATING DATA REPORT DOCKET NO. 50 244 DATE April 1, 1978 COMPLETED BY ~
n rew . c am za Operations Aide TELEPHONE 1-716-5 OPERATING STATUS Ext. 291-205, at Ginna
- 1. Unit Name: GINNA STATION N Notes The reactor power level
- 2. Reporting Period: March 1978 averaged 100% in the report
- 3. Licensed Thermal Power (MWt): month. with one exception.
490 See ;"Narrative Summary of
- 4. Nameplate Rating (Gross hAVe):
- 5. Design Electrical Rating (Net MWe): Operating Experience".
- 6. Maximum Dependable Capacity (Gross MWc): 4
- 7. Maximum Depcndablc Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744 73 152 576.92 1 768.50 55,807.12
- 12. Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours 0 17.97 13.
576. 75' 1,761.75 54 280.13
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours 71,067,802
- 16. Gross Thermal Energy Generated (MWH) 870,024 2,630,760 252,383 762,610
- 17. Gross Electrical Energy Generated (MWH) e 21,703,848
'7 O <V
/ CJ/o 82% 74%
- 19. Unit Service Factor 78% 82% 74%
- 20. Unit Availability Factor 71% 66%
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using,DER Net) 68/ 71% 66%
0% 11%
- 23. Unit Forced Outage Rate
/
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. If Shut Down At End Of Report. Period, Estimated Date of Startup: May 1, 1978
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achteved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 49 Sd (Rave 1/Td)
+ Cumulative data commencing January 1, 1975.
0 ~ ~
P
AVERAGE DAILY UNIT POWER UNIT DOCKET NO. 50 244 UNIT ¹I pinna Statio April 1, 1978 COMPLETEDBY d E M N Operations Aide 1-716-546-2700 TELEPHONE Ext. 291-205, at Ginna 1
hlONTH March, 1978 DAY AVERAGE DAILYPOWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 414 416 17 415 416 18 414 416 416 415 20 415 416 21.
415 417 22 415 417 23 414 402 24 414 25 10 26 416 21 415 12 28 414 13 29 415 14 30 416 15 31 415 16 INSTRUCTIONS On this format, list the average daily unit power level in hlWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
6 49 ~ 87 (REV I/78)
DOCKET NO.
Nl Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS COMPLETED I3Y -.
=dndree E.-McNana , pperkiona REPORT hlONTH TELEPllONE. 1-716-546-2700 Aide Ext 291-205 at Ginna e 0 e- a 0 Licensee Ew- c ill Cause 8 Corrective Cl C E id 0 0 0 Ho. Date 0 0 0 e
>L Event 0 0 0 Action to 0 sh 0
0 oin r 0 CL ~ Report II Ill E (J
Prevent Recurrence n0 780325 S 167.25 C ZZ :zz Annual Refueling and Maintenance (NOTE: Duration (hours) reflect repoit month, only) 3 4 F: Forced Reason: hlethod: Exhibit F - Instructions S: Scheduled A-Equipmcnt Failure (Explain) 1-hlanual for Preparation of Data 13-htaintcnance or Test 2-hlanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training &; License Examination F-Administrative G-Operational Error (Explain) 89.89 CREVs 1/78) II-Other (Explain) Exhibit H- Same Source
f
'f f-.
)
l
-I(
" 'I N
(
4 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 0-2 Ginna Station, Unit 81 DATE April 1, 1978 COMPLETED BY Andrew E. McNamara Operations Aide TELEPHONE 1-716-546-2700 Ext. 291-205, at Ginna MONTH March 1978 The reactor power level averaged 100% for the report month until shutdown on* 3/25 for annual refueling and maintenance.
The exception was a reduction of slight duration to ~ 97%
reactor power level on 3/14 to perform the Auxiliary Feedwater System Flow Check. The power level was restored to 100% upon completion of the test. 1 49 '23 u/78)
I C Pi'X 'f .,0 ~ t,g g gf.f, >,
GINNA STATION MARCH, 1978 NARRATIVE
SUMMARY
OF SAFETY RELATED-MAINTENANCE Safety related maintenance for the month of. March included re-placing of the varidrive belts on =the 1B .charging pump due to belt failure, replacement of the exhaust solenoid valve for the containment purge exhaust valve 5879, and repair of the B phase connector for the power supply breaker to diesel genera-tor auxiliary motor control center 1H.
'1