ML18142B357

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Status Report for Month of March, 1978
ML18142B357
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/05/1978
From: Lang L
Rochester Gas & Electric Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML18142B357 (14)


Text

~ ng ll/Qg REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DISTRIBUTION FOR INCOMING MATERIAL 50-244 REC: ORG: LANG L S DOCDATE: 04/05/78 NRC ROCHESTER GAS 8c ELEC DATE RCVD: 04/i0/78 OOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR i ENCL i

=ORWARDING SUBJECT FACILITY"S MONTHLY OPERATING REPT FOR MARCHr i978.

i PLANT NAME: RE GINNA UNIT REVIEWER DISTRIBUTOR INITIAL: XJM INITIAL: ~

DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.

(DISTRIBUTION CODE A003)

FOR ACTION: BR CHIEF ++W/2 ENCL INTERNAL: EG FILE++M/E CL NRC PDR+%W/ENCL

/2 ENCL EXTERNAL: LPDR S ROCHESTER'Y++W/ENCL T I C~~+W/ENCL NSI C4 +W/ENCL BNL(NATLAB)4+W/ENCL ACRS CAT B+>W/0 ENCL DISTRIBUTION: LTR iO ENCL iO CONTROL NBR: 78ioi0033 SIZE: i P+5P

%%%4%4%% 4M0M 4%4%%%4HHHF Rf %4 g%%%%4 %4%% THE END %4%+4k4%%4 4 4%4 4 4 %4%%+

~ e (w l I a Rld

~

IIIIII/ IIIIIIIIIII IIII /III IIIIIIIIIIIII ETATK II/g IIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. t4649 TELEPHONE AREA cooE lid 546-2700 Ginna Station 1978 g< EI'k FT$

l LRL En<'I

@))gita's ~le~

~/Q C~

Vl O>

(Tl EOm V CAMEO MA7 Director, Office of Management Information and Program Control U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555

Subject:

Monthly Report for March, 1978 Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Gentlemen:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1978.

Very truly yours, Lee S. Lang Superintendent LSL:fah Attachments 7810iO033 I,or,

0 ~ ~

V:

'I I

,r I

'I V

lt IV I I I

I il ~ ', ~

J II'I;I I I

OPERATING DATA REPORT DOCKET NO. 50 244 DATE April 1, 1978 COMPLETED BY ~

n rew . c am za Operations Aide TELEPHONE 1-716-5 OPERATING STATUS Ext. 291-205, at Ginna

1. Unit Name: GINNA STATION N Notes The reactor power level
2. Reporting Period: March 1978 averaged 100% in the report
3. Licensed Thermal Power (MWt): month. with one exception.

490 See  ;"Narrative Summary of

4. Nameplate Rating (Gross hAVe):
5. Design Electrical Rating (Net MWe): Operating Experience".
6. Maximum Dependable Capacity (Gross MWc): 4
7. Maximum Depcndablc Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744 73 152 576.92 1 768.50 55,807.12
12. Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours 0 17.97 13.

576. 75' 1,761.75 54 280.13

14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours 71,067,802
16. Gross Thermal Energy Generated (MWH) 870,024 2,630,760 252,383 762,610
17. Gross Electrical Energy Generated (MWH) e 21,703,848

'7 O <V

/ CJ/o 82% 74%

19. Unit Service Factor 78% 82% 74%
20. Unit Availability Factor 71% 66%
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using,DER Net) 68/ 71% 66%

0% 11%

23. Unit Forced Outage Rate

/

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shut Down At End Of Report. Period, Estimated Date of Startup: May 1, 1978
26. Units In Test Status (Prior to Commercial Operation): Forecast Achteved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 49 Sd (Rave 1/Td)

+ Cumulative data commencing January 1, 1975.

0 ~ ~

P

AVERAGE DAILY UNIT POWER UNIT DOCKET NO. 50 244 UNIT ¹I pinna Statio April 1, 1978 COMPLETEDBY d E M N Operations Aide 1-716-546-2700 TELEPHONE Ext. 291-205, at Ginna 1

hlONTH March, 1978 DAY AVERAGE DAILYPOWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 414 416 17 415 416 18 414 416 416 415 20 415 416 21.

415 417 22 415 417 23 414 402 24 414 25 10 26 416 21 415 12 28 414 13 29 415 14 30 416 15 31 415 16 INSTRUCTIONS On this format, list the average daily unit power level in hlWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

6 49 ~ 87 (REV I/78)

DOCKET NO.

Nl Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS COMPLETED I3Y -.

=dndree E.-McNana , pperkiona REPORT hlONTH TELEPllONE. 1-716-546-2700 Aide Ext 291-205 at Ginna e 0 e- a 0 Licensee Ew- c ill Cause 8 Corrective Cl C E id 0 0 0 Ho. Date 0 0 0 e

>L Event 0 0 0 Action to 0 sh 0

0 oin r 0 CL ~ Report II Ill E (J

Prevent Recurrence n0 780325 S 167.25 C ZZ :zz Annual Refueling and Maintenance (NOTE: Duration (hours) reflect repoit month, only) 3 4 F: Forced Reason: hlethod: Exhibit F - Instructions S: Scheduled A-Equipmcnt Failure (Explain) 1-hlanual for Preparation of Data 13-htaintcnance or Test 2-hlanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training &; License Examination F-Administrative G-Operational Error (Explain) 89.89 CREVs 1/78) II-Other (Explain) Exhibit H- Same Source

f

'f f-.

)

l

-I(

" 'I N

(

4 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 0-2 Ginna Station, Unit 81 DATE April 1, 1978 COMPLETED BY Andrew E. McNamara Operations Aide TELEPHONE 1-716-546-2700 Ext. 291-205, at Ginna MONTH March 1978 The reactor power level averaged 100% for the report month until shutdown on* 3/25 for annual refueling and maintenance.

The exception was a reduction of slight duration to ~ 97%

reactor power level on 3/14 to perform the Auxiliary Feedwater System Flow Check. The power level was restored to 100% upon completion of the test. 1 49 '23 u/78)

I C Pi'X 'f .,0 ~ t,g g gf.f, >,

GINNA STATION MARCH, 1978 NARRATIVE

SUMMARY

OF SAFETY RELATED-MAINTENANCE Safety related maintenance for the month of. March included re-placing of the varidrive belts on =the 1B .charging pump due to belt failure, replacement of the exhaust solenoid valve for the containment purge exhaust valve 5879, and repair of the B phase connector for the power supply breaker to diesel genera-tor auxiliary motor control center 1H.

'1