R. E. Ginna - Forwards Monthly Operating Status Information for Month of July 1975
ML18142B396
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/05/1975
From: Platt C
Rochester Gas & Electric Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML18142B396 (10)


Text

MOMTtlREPORTS (FOR GRAY BOOK PREFAB3N)

NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)

.~86 FILE MONTHLY REPORT FILE FROM:Rochester Ga,s 0 Electric Rochester, N.Y.

DATE OF DOC DATE REC'D LTR TWX RPT OTHER TO:

NCR ORIG 1 Signed.

CC OTHER SENT AEC PDR SENT LOCALPDR CLASS V~ASS PROP INFO I

DESCRIPTION:

Ltr trans the following:

PLANT NAME: RE Ginna g1 INPUT NO CYS REC'D 1

ENCLOSURES:

DOCKET NO:

50"244 Monthly Report for Plant 6 Component Operability 6 Availability This Report to be used in preparing Gray Book by Plans

& Operations.

NUMBER OF COPIES REC'D:

FOR ACTION/INFO RIVIATION BUTLER (L)

W/'opies CLARK (L)

W/ Copies PARR (L)

W/ Copies KNIEL (L)

W/ Copies

~ NRC PDR OGC, ROOM P-506A.

GOSS I CK/STAF F CASE GIAMBUSSO BOYD MOORE (L)

DEYOUNG (L)

SKOVHOLT (L)

GOLLER (L) (Ltr)

P. COLLINS DENISE REG OPR FII.F. 6 REGION (2)

STEELE SCHWENCER (L W/ Copies STOLZ (L)

W/ Copies VASSALLO (L)

W/ Copies

~PURPLE (L)

W/ Copies TECH REVIEW SCHROEDER MACCARY KNIGHT PAWLICKI SHAO STE LLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO J.

COLLXNS LAIN AS BENAROYA VOLLMER

)

ZIEMANN(L)

BEGAN (E)

".'",;.'",', DOXOT REMOVE

/

~

~

gcgjqo~gKDQKD INTERNALDISTRIBUTION DENTON

~ LIC ASST A/T IND

~

GR IMES R. DIGGS (L)..

BR A ITM AN GAMMILL (H. GEAR IN (L) 'ALTZMAN KASTNER E. GOU LBOURNE (L)

ME LTZ BALLARD P. KREUTZER (E)

SPANGLER J. LEE (L)

PLANS M. RUBIABROOK (L)

~ MCDONAI,D ENVIRO S. REED (E)

CHAPMAN MULI ER M. SERVICE (L)

DUBE (Ltr)

DICKER

/$. SHEPPARD (L)

E CO KNIGHTON M. SLATER (E)

PETERSON YOUNGBLOOD H. SMITH (L)

HARTFIELD (2)

REGAN S. TEETS (L)

KLECKER PROJECT LDR G. WILLIAMS(E),

V. Wl LSON (L)

WIGGINTON HARLESS R. INGRAM (L)

M DUNCA E

EXTERNAL DISTRIBUTION

~1 LOCALPD RgmeogyE.kC 7lg

~1 TIC (ABERNATHY)

(1)(2)(10) NATIONALLABS

~1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 ASLB 1

CONSULTANTS 1 Newton Anderson NEWMARK/8LUME/AGBABIAN 1 PD R-SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULR I KSON, 0 R N L 1 AGMED (RUTH GUSSMAN)

Rm B-127 GT 1 J. D. RUNKLES, Rm E-201 GT

,. ~

~

~

~

k J I

e

-A

/

e 1

/Rdt IRR

'l/ggi/I/ IIIIIIIIIII II/gal t IIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, ROCHESTER, N.Y. I4649 TCLCPHONC AREA eood '2ld 546-2700 Ginna Station August 5>

1975 Office of Plans and Schedules Directorate. of Licensing U. S. Nuclear Regulatory Commission Washingtong D.

C.

20555 Pjpp C4jp~

Subject:

Monthly Report for July>

1975

,gperating Status Information k';- E. Ginna Nuclear Power Plant Unit No.

1 Docket No. 50-244 Gentlemen:

Pursuant to the letter dated February 19>

1974 of Mr. L. Manning Muntzing>

Director of Regulation, enclosed herewith is the requested operating status information of the Ginna Station for the month, of July>

1975.

CEP:fah Enclosures cc:

Mr. James P. O'Reilly Very truly yours>

C Charles E. Platt Superintendent

! Rg

~gHR~q 8/3 (g~

getgyd et (7eg 88 Ext, 291-214 DAILY PLANT POWER OUTPUT MONTH July 1975 DAY 9

10 12 13 14 15 16 17 18 19 20 21 22 23 AVERAGE DAILY hBUe-net 479.17 479.0 474.9 474.8 468.37 467.33 467.42 460.54 466.54 466.67 469.5 469. 1 471.25 474.46 472.71 472 '

470.88 467.88 468.33 399'7 468.9 468. 5'-.

468.1 282.0 DAY 25 26 27 28 29 30 31 AVERAGE DAILY LOVe-net 355'7 465.79 465.83 466.0 467.46 360.58 466.96 49 ~ 87

~I

'E o

~ 5 o

s ~

~ -

'I

UNIT NAME:

G Sta Unit 81 DATE'ugust 5>

1975 COMPLETED BY:

Andrew E. McNamara>

Operations Aide3 Telephone, 81-716-546-27009 OPERATING STATUS 1.

REPORTING PERIOD:

TO 2400 9 75073 1 GROSS HOURS IN REPORTING PERIOD:

744 2.

CURRENTLY AUTHORIZED POWER LEVEL h)Wt 1520 Max. Depend.

Capacity (hLWe-Net) 3

~

POWER LEVEL TO WHICH RESTRICTED (IF ANY): (hHVe Net) 4

~

REASONS FOR RESTRICTIONS (IF ANY):

470 5.

NUh)BER OF HOURS THE REACTOR WAS CRITICAL..

6.

REACTOR RESERVE SHUTDOWN HOURS............

7.

HOURS GENERATOR ON LINE 8.

UNIT RESERVE SHUTDOWN HOURS.......

~..

9 ~

GROSS THERMAL ENERGY GENERATED (h)WH)

~

~

~

~

~

~

10.

GROSS ELECTRICAL ENERGY GENERATED (MWH)...

11.

NET ELECTRICAL ENERGY GENERATED (h)WH).

~...

12. REACTOR AVAILABIIITY FACTOR (1)..........

13.

UNIT AVAILABILTYFACTOR (2)..............

14 'NIT CAPACITY FACTOR (3) 15.

UNIT FORCED OUTAGE RATE (4). "....... "

742.33 39260.54

.83 731.75 291.22 3,124 '5

~1088

< 160 355 476 C

. 337,999 99.78%

~935 96 '2%

493349971 1 416 337 193443102 64.1%

61 43 56.06%

1.65%

8.2%

THI S MONTH YEAR TO DATE CUMULATIVE TO DATE 37,9579.00 291.2256'69326.88 53'4 4499999290 15 023 155 1431959264 74.9%

73.

0'6.3%

9.57%

16.

SHUTDOWNS SCHEDULED OVER NEXT 6 h)ONTHS, (TYPE, DATE AND DURATION OF EACH):

4'Cumulative Data Commencing January 1>

1975

17. IF SHUT DOWN AT END OF REPORT
PERIOD, ESTIh)ATED DATE OF STARTUP:

18 'NITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

DATE FORECASTED DATE ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COhlMERCIAL OPERATION 01 00 (2)

UNIT AVAILABILITYFACTOR (4)

FORCED OUTAGE RATE FORCED OUTAGE HOURS

~s1 00 HOURS GENERATOR ON-LINE+ FORCED OUTAGE HOURS (1)

REACTOR AVAILABILITYFACTOR =

HOURS REACTOR WAS CRITICAL GROSS HOURS IN REPORTING PERIOD HOURS GENERATOR ON-LINE e100 GROSS HOURS IN REPORTING PERIOD (3)

UNIT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED 8100 CURRENTLY LICENSED POWER LEVELOGROSS HRS IN REPORTING PERIOD 49 88

l L

9'Y

~

~

4 ~

a

~

~

~ l 1

~

~

~

SUMMARY

Reactor Power at 100% level during majority. of month.

Major exceptions were:

Outage i)12~ detailed below Reduction in power to 14% level on 7/20 to repair leak in drain line on H. P. Turbine.

Reduction in. power to 48% level on 7/30 to check for tube leaks in the 1-A-1 and 1-A-2 condenser, water boxes.

REPORT MONTH UNIT NAME Ginna Station> Unit 81 August 5>

1975 DATE f3w~

Andrew E.

McNamara> Operations Aide Telephone gl-716-546-2700>

Ext.'291-214 at Ginna PLANT SHUTDOWNS DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)

REASON (I)

METHOD OF SHUTTING DOWN THE REACTOR (2)

COMMENTS 12 7/24/75 F

12.25 A

Turbine Trip - Lightning Strike> Station 13A (Station Switchyard)

The relays and lockout circuits were tested and the generator differential solid state relay was found to have a diode failure in the trip circuit.

This is believed to be the cause of the unit trip.

(I)

REASON:

A -

EOUIPMENT FAILURE (EXPLAIN) 8 - MAINT.

OR TEST C - REFUELING D -

REGULATORY RESTRICTION E -

OPERATOR TRAINING AND I.ICENSE EXAMINATION F - ADMINISTRATIVE G -

OPERATIONAL ERROR (EXPLAIN)

(2)

METHOD:

A -

MANUAL 8 -

MANUAL SCRAM C -

AUTOMATIC SCRAM I g9. 89

o