Forwards Monthly Operating Status Report for Month of November 1977
ML18142B363
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/05/1977
From: Lang L
Rochester Gas & Electric Corp
To:
NRC/IE
References
Download: ML18142B363 (10)


Text

U.S. NUCLEAR REGULATORY COMMISS DOCKET NUMBE NRC FOr"v 105 ~ IP I2:75/

FILE NUMBER

'hlRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL MO Y R

c. FROM: DATE OF DOCUMENT TP:

Rochester Gas Bc Electric Corp+ 12/05/77 Ne Re Ce Rochester, New York DATE RECEIVED Lee So Lang 12/13/77 LETTER QNOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED CfOR IG INAL ~UNCLASSIFIED OCOP Y DESCRIPTION ENCLOSURE I

II' L'etter trans the following'. Month+ Report for November 1977 Plant 8: Component Operability k. Availability.

This Report to be used in preparing Gray Book by Planh 8c Operations.

PL@K NAME: Ri Ei Ginna Unit No, 1 RJL 12/13/77 epE8 LxR.

FOR ACTION/INFORMATION

& CYS R CT N INTERNAL DISTR I BUTION eg x s rane e EXTERNAL DISTRIBUTION CONTROL NUMBER NRC FORM I95 I2.76)

/'EiNiF( WII K%I.H5 l)OFG I I.f IlII(),----f';:;-,-'Z

'5'OCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHONE AREA cooE 'IIE 546 2700 Ginna Station December 5, 1977 "eel I'~c>story~

Director, Office of Inspection and Enforcement U, S, Nuclear Regulatory Conuqission I

'g ( .

Washington, D. C, 20555 Subject; Monthly Report for November, 1977 C Operating Status Information R, E. Ginna Nuclear Power Plant Uhit'. No, 1 Docket No, 50-244 Gentlemen; l

Pursuant to Technical Specification 6.9.1.c attached herewith is the monthly operating status report for Ginna Station for the month of November, 1977. Also, ten additional copies of the attachment are enclosed.,

Very truly yours, Lee ST Lang superintendent LSL:fah Attachments cc: Mr. Boyce H. Grier'1)

Mr. William G, McDonald., ~C (2P 77348000i 1

I'

~ I tUP r OPERATING DATA REPORT DOCKET NO. 50 244 UNIT ¹1 Ginna Station DATE COMPLETED BY Andrew E. McNamara, SX pera ons e TELEPHONE 1-716-546-2700 Ext. 291-205, at Ginna OPERATING STATUS

1. REPDRTING PERloD: November 1977 GRoss H0URs IN REPQRTING PERIDDs
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt)s~~ MAX. DEPEND. CAPACITY (MWe-Net)s
3. POWER LEVEL To WHICH RESTRICTED (IF ANY) (MWerNet)s
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR To DATE CUMULATIVE'.

NUMBER OF HOURS REACTOR WAS CRITICAL

6. REACTOR RESERVE SHUTDOWN IIOURS.. T................ ~k5 ~9881*
7. HOURS GENERATOR ON LIHE....... ~ LZIB S
8. UNIT RESERVE SHUTDOWH HOURS
9. GROSS THERMAL ENERGY GENERATED (MWH)..............
10. GROSS ELECTRICAL ENERGY GENERATED (MWH)
11. NET ELECTRICAL ENERGY GENERATED (MWH) ~ ..

~ ~

~

~

~

~

~

~ ~

~ ~ ~

~

~ ~

~ ~

~ ~

~

~~

~252 ~U~EQQ.

~~M

~~6

~~)'2

12. REACTOR SERVICE FACTOR ..
13. REACTOR AVAILABILITYFACTOR

~

14. UNIT SERVICE FACTOR.
15. UNIT AVAILABILITYFACTOR
16. UNIT CAPACITY FACTOR (Using MDC)

IT UNIT CAPACITY FACTOR (U I T O IT MW I..... ~..... ~ ~ ~ ~

O

18. UNIT FORCED OUTAGE RATE T ~ ~ ~ ~ \ ~
19. SHUTDOWHS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPs
21. UNITS IN TEST STATUS (PRIOR To COMMERCIAL OPERATION)s FORECAST ACHIEVED INITIALCRITICALITY IHITIALELECTRICITY COMMERCIAL OPERATION

~

~

  • Cumulative Data Commencing January 1, 1975 40 ee RKV tO/Tst

'I 1

N

$ ~

g

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. >> 244 UNIT III Ginna Station DATE Andrew E.V1cFamara, Operations de TELEPHONE Ext. 291-205, at Ginna MONTH NOVEMBER, 1977 DAY AVERAGE DAILYPOWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 17 415 18 202 415 ltl 411 393 413 20 21 22 414 266 414

,7 23 416 24 412 413 25 10 412 414 26 413 415 27 12 413 28 13 413 415 28 30 416 15 413 31 388 16 INSTRUCTIONS On this form, list the average daily unit power level in MWe&et for each.day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum depend-able capacity, is used for the net electrical rating of the unit, there may'be occasions when the daily average power level exceeds the 100fo line (or the restricted power level line). In such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly.

40 87 RKVI 10/75

0+

R 4 1

DOCKET NO. 50-244

SUMMARY

The Reactor Power Level averaged GINNA STATION> UNIT A'I 100% in the report month, (with the exception of the two unit shutdowns, detailed below DATE COMPLETED BY Andrew E. McNamara, Operate ns Aide TELEPHQNE 1-716-546-2700 Ext. 291-205 at Ginna REPORT MONTH NOSER~ 1977 UNIT SHUTDOWN AND POWER REDUCTIONS METHOD OF TYPE SHUTTING DOWN F- FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS/COMMENTS NO. DATE S-SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) 5 11/04/77 48 "B" Steam Generator One inoperative snubber 6 11/17/77 30 A Inoperable Control"Rods (I) REASON: (2) METHOD:

A - EQUIPMENT FAILURE (EXPLAIN) I - MANUAL 8 - MAINT. OR TEST 2 - MANUAL SCRAM C - REFUELING 3 - AUTOMATIC SCRAM D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

E - OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)

H - "OTHER (EXPLAIN)

REV. 10/75 ls. 89

r.

4 AF.'c".Iv~n oocvwc~p

'""~lHG UHfT

9Tl DEC l2 PJH 2  !',

~ J