Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] Category:Operating Report
MONTHYEARML18137A2162018-05-31031 May 2018 Annual Radiological Environmental Operating Report: January 1, 2017 - December 31, 2017 ML18137A2132018-05-11011 May 2018 and Independent Spent Fuel Storage Installation - Submittal of 2017 Annual Radioactive Effluent Release Report and 2017 Annual Radiological Environmental Operating Report ML0509503022005-03-30030 March 2005 R. E. Ginna Nuclear Power Plant, Transmittal of Core Operating Limits Report (COLR) ML0414204852003-12-31031 December 2003 2003 Annual Radiological Environmental Operating Report ML18142B3531978-09-0707 September 1978 Forwards Monthly Operating Status Report for Month of August 1978 ML18142B3541978-08-0303 August 1978 Forwards Monthly Operating Status Report for Month of July, 1978 ML18142B3551978-07-10010 July 1978 Forwards Monthly Operating Status Report for Month of June, 1978 ML18142B3561978-06-14014 June 1978 Forwards Monthly Operating Status Report for Month of May, 1978 ML18142B3571978-04-0505 April 1978 Forwards Monthly Operating Status Report for Month of March, 1978 ML18142B3581978-03-0707 March 1978 R.E. Ginna - Forwards Monthly Operating Status Report for Month of February 1978 ML18142B3591978-02-0909 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3611978-02-0606 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3621978-01-0505 January 1978 Forwards Monthly Operating Status Report for Month of December 1977 ML18142B3631977-12-0505 December 1977 Forwards Monthly Operating Status Report for Month of November 1977 ML18142B3851976-05-0505 May 1976 R.E Ginna - Forwards Monthly Operating Status Report for Month of April 1976 ML18142B3861976-03-0808 March 1976 Forwards Monthly Operating Status Report for Month of March 1976 ML18142B3871976-03-0505 March 1976 Forwards Monthly Operating Status Report for Month of February 1976 ML18142B3971975-07-0707 July 1975 R. E. Ginna - Forwards Monthly Operating Status Information for Month of June 1975 2018-05-31
[Table view] Category:Monthly
MONTHYEARML18142B3531978-09-0707 September 1978 Forwards Monthly Operating Status Report for Month of August 1978 ML18142B3541978-08-0303 August 1978 Forwards Monthly Operating Status Report for Month of July, 1978 ML18142B3551978-07-10010 July 1978 Forwards Monthly Operating Status Report for Month of June, 1978 ML18142B3561978-06-14014 June 1978 Forwards Monthly Operating Status Report for Month of May, 1978 ML18142B3571978-04-0505 April 1978 Forwards Monthly Operating Status Report for Month of March, 1978 ML18142B3581978-03-0707 March 1978 R.E. Ginna - Forwards Monthly Operating Status Report for Month of February 1978 ML18142B3591978-02-0909 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3611978-02-0606 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3621978-01-0505 January 1978 Forwards Monthly Operating Status Report for Month of December 1977 ML18142B3631977-12-0505 December 1977 Forwards Monthly Operating Status Report for Month of November 1977 ML18142B3851976-05-0505 May 1976 R.E Ginna - Forwards Monthly Operating Status Report for Month of April 1976 ML18142B3861976-03-0808 March 1976 Forwards Monthly Operating Status Report for Month of March 1976 ML18142B3871976-03-0505 March 1976 Forwards Monthly Operating Status Report for Month of February 1976 ML18142B3971975-07-0707 July 1975 R. E. Ginna - Forwards Monthly Operating Status Information for Month of June 1975 1978-09-07
[Table view] |
Text
U.S. NUCLEAR REGULATORY COMMISS DOCKET NUMBE NRC FOr"v 105 ~ IP I2:75/
FILE NUMBER
'hlRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL MO Y R
- c. FROM: DATE OF DOCUMENT TP:
Rochester Gas Bc Electric Corp+ 12/05/77 Ne Re Ce Rochester, New York DATE RECEIVED Lee So Lang 12/13/77 LETTER QNOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED CfOR IG INAL ~UNCLASSIFIED OCOP Y DESCRIPTION ENCLOSURE I
II' L'etter trans the following'. Month+ Report for November 1977 Plant 8: Component Operability k. Availability.
This Report to be used in preparing Gray Book by Planh 8c Operations.
PL@K NAME: Ri Ei Ginna Unit No, 1 RJL 12/13/77 epE8 LxR.
FOR ACTION/INFORMATION
& CYS R CT N INTERNAL DISTR I BUTION eg x s rane e EXTERNAL DISTRIBUTION CONTROL NUMBER NRC FORM I95 I2.76)
/'EiNiF( WII K%I.H5 l)OFG I I.f IlII(),----f';:;-,-'Z
'5'OCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHONE AREA cooE 'IIE 546 2700 Ginna Station December 5, 1977 "eel I'~c>story~
Director, Office of Inspection and Enforcement U, S, Nuclear Regulatory Conuqission I
'g ( .
Washington, D. C, 20555 Subject; Monthly Report for November, 1977 C Operating Status Information R, E. Ginna Nuclear Power Plant Uhit'. No, 1 Docket No, 50-244 Gentlemen; l
Pursuant to Technical Specification 6.9.1.c attached herewith is the monthly operating status report for Ginna Station for the month of November, 1977. Also, ten additional copies of the attachment are enclosed.,
Very truly yours, Lee ST Lang superintendent LSL:fah Attachments cc: Mr. Boyce H. Grier'1)
Mr. William G, McDonald., ~C (2P 77348000i 1
I'
~ I tUP r OPERATING DATA REPORT DOCKET NO. 50 244 UNIT ¹1 Ginna Station DATE COMPLETED BY Andrew E. McNamara, SX pera ons e TELEPHONE 1-716-546-2700 Ext. 291-205, at Ginna OPERATING STATUS
- 1. REPDRTING PERloD: November 1977 GRoss H0URs IN REPQRTING PERIDDs
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt)s~~ MAX. DEPEND. CAPACITY (MWe-Net)s
- 3. POWER LEVEL To WHICH RESTRICTED (IF ANY) (MWerNet)s
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YR To DATE CUMULATIVE'.
NUMBER OF HOURS REACTOR WAS CRITICAL
- 6. REACTOR RESERVE SHUTDOWN IIOURS.. T................ ~k5 ~9881*
- 7. HOURS GENERATOR ON LIHE....... ~ LZIB S
- 8. UNIT RESERVE SHUTDOWH HOURS
- 9. GROSS THERMAL ENERGY GENERATED (MWH)..............
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) ~ ..
~ ~
~
~
~
~
~
~ ~
~ ~ ~
~
~ ~
~ ~
~ ~
~
~~
~252 ~U~EQQ.
~~M
~~6
~~)'2
- 12. REACTOR SERVICE FACTOR ..
- 13. REACTOR AVAILABILITYFACTOR
~
- 14. UNIT SERVICE FACTOR.
- 15. UNIT AVAILABILITYFACTOR
- 16. UNIT CAPACITY FACTOR (Using MDC)
IT UNIT CAPACITY FACTOR (U I T O IT MW I..... ~..... ~ ~ ~ ~
O
- 18. UNIT FORCED OUTAGE RATE T ~ ~ ~ ~ \ ~
- 19. SHUTDOWHS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPs
- 21. UNITS IN TEST STATUS (PRIOR To COMMERCIAL OPERATION)s FORECAST ACHIEVED INITIALCRITICALITY IHITIALELECTRICITY COMMERCIAL OPERATION
~
~
- Cumulative Data Commencing January 1, 1975 40 ee RKV tO/Tst
'I 1
N
$ ~
g
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. >> 244 UNIT III Ginna Station DATE Andrew E.V1cFamara, Operations de TELEPHONE Ext. 291-205, at Ginna MONTH NOVEMBER, 1977 DAY AVERAGE DAILYPOWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 17 415 18 202 415 ltl 411 393 413 20 21 22 414 266 414
,7 23 416 24 412 413 25 10 412 414 26 413 415 27 12 413 28 13 413 415 28 30 416 15 413 31 388 16 INSTRUCTIONS On this form, list the average daily unit power level in MWe&et for each.day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum depend-able capacity, is used for the net electrical rating of the unit, there may'be occasions when the daily average power level exceeds the 100fo line (or the restricted power level line). In such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly.
40 87 RKVI 10/75
0+
R 4 1
DOCKET NO. 50-244
SUMMARY
- The Reactor Power Level averaged GINNA STATION> UNIT A'I 100% in the report month, (with the exception of the two unit shutdowns, detailed below DATE COMPLETED BY Andrew E. McNamara, Operate ns Aide TELEPHQNE 1-716-546-2700 Ext. 291-205 at Ginna REPORT MONTH NOSER~ 1977 UNIT SHUTDOWN AND POWER REDUCTIONS METHOD OF TYPE SHUTTING DOWN F- FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS/COMMENTS NO. DATE S-SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) 5 11/04/77 48 "B" Steam Generator One inoperative snubber 6 11/17/77 30 A Inoperable Control"Rods (I) REASON: (2) METHOD:
A - EQUIPMENT FAILURE (EXPLAIN) I - MANUAL 8 - MAINT. OR TEST 2 - MANUAL SCRAM C - REFUELING 3 - AUTOMATIC SCRAM D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
E - OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)
H - "OTHER (EXPLAIN)
REV. 10/75 ls. 89
r.
4 AF.'c".Iv~n oocvwc~p
'""~lHG UHfT
- 9Tl DEC l2 PJH 2 !',
~ J