Forwards Monthly Operating Status Report for Month of November 1977
ML18142B363
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/05/1977
From: Lang L
Rochester Gas & Electric Corp
To:
NRC/IE
References
Download: ML18142B363 (10)


Text

U.S. NUCLEAR REGULATORY COMMISS DOCKET NUMBE

~IP FILE NUMBER MO Y

R NRC FOr"v 105 I2:75/

'hlRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL TP:

c.

Ne Re Ce FROM:

Rochester Gas Bc Electric Corp+

Rochester, New York Lee So Lang DATE OF DOCUMENT 12/05/77 DATE RECEIVED 12/13/77 LETTER CfOR IGINAL OCOP Y QNOTORIZED

~UNCLASSIFIED PROP INPUT FORM NUMBER OF COPIES RECEIVED DESCRIPTION I

II' L'etter trans the following'.

ENCLOSURE Month+ Report for November 1977 Plant 8: Component Operability

k. Availability.

This Report to be used in preparing Gray Book by Planh 8c Operations.

PL@K NAME: Ri Ei Ginna Unit No, 1

RJL 12/13/77 FOR ACTION/INFORMATION epE8 LxR.

& CYS R

CT N

eg x

s rane e

INTERNAL DISTR I BUTION EXTERNAL DISTRIBUTION CONTROL NUMBER NRC FORM I95 I2.76)

/'EiNiF( WII K%I.H5 l)OFG I I.f IlII(),----f';:;-,-'Z

'5'OCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHONE AREA cooE 'IIE 546 2700 Ginna Station December 5, 1977 Director, Office of Inspection and Enforcement U, S, Nuclear Regulatory Conuqission Washington, D.

C, 20555 Subject; Monthly Report for November, 1977 Operating Status Information R, E. Ginna Nuclear Power Plant Uhit'. No, 1 Docket No, 50-244 "eel I'~c>story~

. I

'g (

C Gentlemen; l

Pursuant to Technical Specification 6.9.1.c attached herewith is the monthly operating status report for Ginna Station for the month of November, 1977.

Also, ten additional copies of the attachment are enclosed.,

Very truly yours, LSL:fah Attachments cc:

Mr. Boyce H. Grier'1)

Mr. William G, McDonald., ~C (2P Lee ST Lang superintendent 77348000i 1

I'

~ I tUPr OPERATING DATA REPORT DOCKET NO.

50 244 UNIT

¹1 Ginna Station DATE COMPLETED BY SX Andrew E. McNamara, pera ons e

TELEPHONE 1-716-546-2700 Ext. 291-205, at Ginna OPERATING STATUS 1.

REPDRTING PERloD:

November 1977 GRoss H0URs IN REPQRTING PERIDDs 2.

CURRENTLY AUTHORIZED POWER LEVEL(MWt)s~~ MAX. DEPEND. CAPACITY (MWe-Net)s 3.

POWER LEVEL To WHICH RESTRICTED (IF ANY) (MWerNet)s 4.

REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR To DATE CUMULATIVE'.

NUMBER OF HOURS REACTOR WAS CRITICAL 6.

REACTOR RESERVE SHUTDOWN IIOURS.. T................ ~k5 7.

HOURS GENERATOR ON LIHE.......

~

8.

UNIT RESERVE SHUTDOWH HOURS 9.

GROSS THERMAL ENERGY GENERATED (MWH)..............

LZIB S

~9881*

10.

GROSS ELECTRICAL ENERGY GENERATED (MWH)

~

~

~

~

~

~

~

~

~

~ ~252

~U~EQQ. ~~6 11.

NET ELECTRICAL ENERGY GENERATED (MWH)

~..

~

~

~

~

~

~

~

~

~

~~~ ~~M ~~)'2 12.

REACTOR SERVICE FACTOR..

13.

REACTOR AVAILABILITYFACTOR 14.

UNIT SERVICE FACTOR.

15. UNIT AVAILABILITYFACTOR 16.

UNIT CAPACITY FACTOR (Using MDC)

IT UNIT CAPACITY FACTOR (U I

T O IT MW I..... ~.....

~

~

~

~~

18.

UNIT FORCED OUTAGE RATE O

T

~

~

~

~ \\

~

19.

SHUTDOWHS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPs 21.

UNITS IN TEST STATUS (PRIOR To COMMERCIAL OPERATION)s FORECAST ACHIEVED INITIALCRITICALITY IHITIALELECTRICITY COMMERCIAL OPERATION

  • Cumulative Data Commencing January 1,

1975

~

~

40 ee RKV tO/Tst

'I 1

N g

~

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. >> 244 UNIT III Ginna Station DATE Andrew E.V1cFamara, Operations de TELEPHONEExt. 291-205, at Ginna MONTH NOVEMBER, 1977 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)

DAY.AVERAGE DAILYPOWER LEVEL (MWe-Net)

,7 10 12 13 15 16 415 415 393 266 416 412 412 413 413 413 413 388 17 18 ltl 20 21 22 23 24 25 26 27 28 28 30 31 202 411 413 414 414 413 414 415 415 416 INSTRUCTIONS On this form, list the average daily unit power level in MWe&et for each.day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum depend-able capacity, is used for the net electrical rating of the unit, there may'be occasions when the daily average power level exceeds the 100fo line (or the restricted power level line).

In such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly.

40 87 RKVI 10/75

0+

R 4

1

DOCKET NO.

50-244

SUMMARY

The Reactor Power Level averaged 100% in the report month, (with the exception of the two unit shutdowns, detailed below REPORT MONTH NOSER~

1977 GINNA STATION> UNIT A'I DATE COMPLETED BY Andrew E. McNamara, Operate ns Aide TELEPHQNE 1-716-546-2700 Ext. 291-205 at Ginna UNIT SHUTDOWN AND POWER REDUCTIONS NO.

DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)

REASON (1)

METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)

CORRECTIVE ACTIONS/COMMENTS 5

11/04/77 6

11/17/77 48 30 A

"B" Steam Generator One inoperative snubber Inoperable Control"Rods (I)

REASON:

A -

EQUIPMENT FAILURE (EXPLAIN) 8 - MAINT. OR TEST C -

REFUELING D -

REGULATORY RESTRICTION E -

OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G -

OPERATIONAL ERROR (EXPLAIN)

H - "OTHER (EXPLAIN)

(2)

METHOD:

I -

MANUAL 2 -

MANUAL SCRAM 3 -

AUTOMATIC SCRAM 4 -

OTHER (EXPLAIN)

REV.

10/75 ls. 89

AF.'c".Iv~n oocvwc~p

'""~lHG UHfT r.

4

9Tl DEC l2 PJH 2 !',

~

J