ML18142B401
| ML18142B401 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 03/06/1975 |
| From: | Platt C Rochester Gas & Electric Corp |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18142B401 (10) | |
Text
0 AEC DISTRIBUTIO". FQR PART o0 DOCowET fs}ATESJAL ITEI;iPORARY FOR'.I)
CQNTRQL NO:~~~++
FILE..
MONTHLY REPORT F LE FRO<',~:
Rochester Gas 6 Electric Rochester, NY C E Platt DAT Or DOC 3-6-75 DATE R EC'D 3r 12~75 LTR T'v'rX XXXX RPT OTHER Office of Plans6schedulin ORIG one signed CC OTHER SENT AEC POR~
SENT LOCAL PDR CLASS UNCLASS XXXX PROP INFO INPUT NO CYS REC'D 1
DOCKET i~!0:
50-244 DESI R JP IQsl ~
Ltr trans the following:
ry~~r
~
~,qgZ, j f }.P iF'j )i;"r),3UW~
~ 'I 43-P'21ll 0.(~<~
ENCLOSUR ES:
Monthly Report for Februar Plant 6 Component Operability 6, Availability This Report to be used in preparing Grey Book by Plans 6 Opdrations.
No. of Cys Rec'd 1
PLANT NAiiiE:
RE Ginna gl FOR 'CIAO:.'1IN;"OR'.lAilO;
~3-2-75 ~b 33UTLER (S)
W/
Conies CLARK (S)
W/
Copies
~PARR (S)
W/
Copies KNXEL (S)
N~/Ce Ies SCt'TENCER (S) W/ Copies STOLZ (S) Wit Copies VASSALLo (s) W/ Copies PURPLE (S) W/ I Copies TECH REVXEW SCHROEDER }JACCP~Y KNXGHT PAWLICKI SHAO STELLO HOUSTON NOVAK ROSS IPPOLXTO TEDESCO LONG LAXNAS BENAROYA VOLDIER ~ )foe G FI PDR OGCP ROOM P"506-A MU}IZING/STAFF CASE GXAMBUSSO BOYD MsOORE (S) (BWR) DEYOUNG (S) (PhR) SKOVHOLT (S) GOLLER- (S) P. COLLINS DENXSE REG OPR FILE & REGION (2) T.R. WILSON ST~ Ii "LOCAL PDR L n 4"TXC(ABERNAT} ) 4 1-NSXC (BUCHANAN) 1-ASLB 1 -bar.ETON 'A'IJDERSON .;.- '6"ACRS }10LDING ZIEMANN (S) REGAN (E) W/ Copies W/ Copies DXCKER (E) LEAR (S) W/ Copies P} / Copies KNIGHTON (E) 4D. THOMPSON W/ Copies W/ 2 Copies YOUNGBLOOD (E) JNT" 8 L DJSTri I")UTJOs J OENION LIC ASST GRIPZE DIGGS (S) GA}}MILL GEARXN (S) KASTNER GOULBOURNE (S) BALLARD 1QKUTZER (E) ~ SPANGLER LEE (S) MAIGRET (S) ENVIRO REED (E). PSLLER SERVXCE (S) DICER S}KPPARD (S) KNIGHTON SLATER (E) YOUNGBLOOD SMITH (S) REGAN TEETS (S) PROJECT LDR WXLLXAMS (E) WILSON (S) HARLESS INGRAM (S) E>:1 EriNAL DIS r; Ic'JTJON o> NRIIONE-L LsEE 1 "W. PENNXNGTON, RM"E-201G. T ~ 1-coNsULTiji>"rs ~, NET }ARK/BLU}JE/AGBABIAN A/T XND BRAITMAN SALTZ}JAN B ~ HURT LANS i CDONALD @i}}AP}JAN DUBE w/input E ~ COUPE D ~ T}IOMPSON (2) KLEC}ZR E XSENHUT 1-PDR SAN/LA/~s}Y .1-BROOkrUiVEN NAT L l-G.ULRXKSON,ORNL 1-AGMED RUTH GUSSMP ROOM B-127 G.T. 1-J RUi%L~S JQJ-E "2
- r. v
'I I I I P
O e sir ITS ~ ZiZZr ', voav t,"E/"'"'OCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 IELCPHONC AREA coDK 7ld 546-2700 Ginna Station March 6, 1975 > gcjg[a&4~ Office of Plans and Schedules Directorate of Licensing U.S. Nuclear Regulatory Commission t<ashington, D.C. 20555
Subject:
Monthly Report for February, 1975 Operating Status Information R.E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Gentlemen: Pursuant to the letter dated February 19, 1974, of Mr. L. Manning Muntzing, Director of Regulation, enclosed herewith is the re-quested operating status information of the Ginna Station for the month of February 1975. Figure noted with a triple asterisk (+<<~) is a corrected value, to rectify calculating error made in June:and'July 1974 reports. Very truly yours,rP Charles E. Platt Superintendent CEP:dal Enclosures xc: Mr. James P. O'Reilly Se<g $ m jp "- <"~If'(
0 qh 's Jl
UNIT NAh)E: DATE: a COihlPLETED BY: Andrew E. McNamara, Telephone Nl-716-546-2700, Ext 291-214 at Ginna Operations Aide OPERATI NG STATUS TO ~ 2400 75022 1 ~ REPORTING PERIOD: 000 5020 GROSS HOURS IN REPORTING PERIOD: 2. CURRENTLY AUTHORIZED POWER LEVEL h)Wt hlax. Depend. Capacity (i%Ye-Net) 470 3. PO)YER LEVEL TO )YHICH RESTRICTED (IF ANY): (h))Ye Net) 4. REASONS FOR RESTRICTIONS (IF ANY)'HIS MONTH CUMULATIVE YEAR TO DATE TO DATE 5. NUh)BER OF HOURS THE REACTOR WAS CRITICAL,. 6. REACTOR RESERVE SHUTDOWN HOURS........... ~ HOURS GENERATOR ON LINE ~.......... ~..... ~ Vc 671+ 1 5 1 415 33.46 NAx%'4 617. 13*~~ 8. UiNIT RESERVE SHUTDOWN HOURS 9 ~ GROSS THERh)AL ENERGY GENERATED (M)YH) ~ ~ ~ ~ ~ ~ 10. GROSS ELECTRICAL ENERGY GENERATED (h)WH)... 11 ~ NET ELECTRICAL ENERGY GENERATED (hHYH) ~ ~ ~ ~ ~ 0-1 018 003 2 141 851 2Z>MOM Num 42 806 170 12 . REACTOR AVAILABILITYFACTOR (1)..... ~.... 13. UNIT AVAILABILTYFACTOR (2).............. 14. UNIT CAPACITY FACTOR (3) 16. UNIT FORCED OUTAGE RATE (4). " 100% 101.3% 100% 101%
- 76. 8%
67.09% 9.3% 16. SHUTDOWNS SCHEDULED OVER NEXT 6
- MONTHS, (TYPE, DATE AND DURATION OF EACH):
March 15,1975 - Refueling, Maintenance 8 Weeks Duration
- 17. IF SHUT DO)YN AT END OF REPORT
- PERIOD, ESTIhlATED DATE OF STARTUP:
18 ~ UNITS IN TEST STATUS (PRIOR TO COhLMERCIAL OPERATION): DATE ACHIEVED DATE FORECASTED INITIAL CRITICALITY INITIAI ELECTRICAL POWER GENERATION COh)h)ERCIAL OPERATION (2) UNIT AVAILABILITYFACTOR (1) REACTOR AVAILABILITYFACTOR HOURS REACTOR WAS CRITICAL GROSS HOURS IN REPORTING PERIOD HOURS GENERATOR ON"LINE GROSS HOURS IN REPORTING PERIOD e100 0100 (3) UNIT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED 8100 CURRENTLY LICENSED POWER LEVELeGROSS HRS ~ IN REPORTING PERIOD (4) FORCED OUTAGE RATE = FORCED OUTAGE HOURS ~'100 HOURS GENERATOR ON-LINE FORCED OUTAGE HOURS Eastern Standard Time to Eastern Daylight Savings Time Data Not Available Corrected Value, to rectify calculating error made in June & July, 1974 reports 49 88
'P 4 ~
ENCLOSURE A UNIT March 6 1975 COMPLETED BY
- g. Pit Andrew E. McNamara, Telephone hl-716-Operations Aide 546-2700 Ext. 291-214 DAILY PLANT POWER OUTPUT MONTH DAY AVERAGE DAILY MWe-net DAY AVERAGE DAILY Mme-net 473.96 474. 67 475 63 476 33 476 5
~47 ~6 25 26 27 28 29 30 31 kZB S k29 'i kZ9~ 10 12 13 14 15 17 18 20 21 474. 96 475.08 475.0 476. 5 474. 5 475 33 kZ5~ hZ7~L 477.75 476. 21 23 476.33 49 ~ 87
II t /p w)
SUMMARY
- Reactor Power Level at 100% during the month with the exception of a reduction to 94% level on 2/24 to perform T-18A, Monthly Intercept and Reheat Stop Valve Test.
UNIT NAME nit fP1 <<DATE COMPLETED BY Andrew E. McNamara, Telephone 8 1-716-546-2700, 2xto Ext. 291-214 at Ginna REPORT MONTH PLANT SHUTDOWNS NO. DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS) REASON (1) METHOD OF SHUTTING DOWN THE REACTOR (2) COhNENTS (I) REASON: A - EQUIPMENT FAILURE (EXPLAIN) 6 - MAINT~ OR TEST C - REFUELING D - REGULATORY RESTRICTION E - OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN) (2) METHOD: A - MANUAL B - MANUAL SCRAM C - AUTOMATIC SCRAM 49 89}}