~'EC I
RIBUTIOU:-OR PART 50 3)."CI'.);T I; RIAL (T&..ik)Oi)kY POR! i)
CONTROL No:
5441 plLE. Honthly Rpt Pile I'ROI~'ochester Gas 6 Elec. Corp.
Rochester, N.Y.
14649 Charles E. Platt TO:
DRL DATE Ok'OC 5-8 "75 ORIG 1 signed DATE P.EC'D 5>>16-75 CC OZHER LTR RPT OTifER SENT AEC PDR XX CLASS UNCLASS DESCRXPTXON PROP INFO INPUT NO CY'S kkEC'D ENCLOSURES:
DOCKET KO:
50-244 Ltr trans the following...
PLANT NAIA:
R p Ginna Ifonthly Report for April 1975 Plant fR Component Operability
& Availability This Report to be used in prepyring Prey Book by Plans
& Oporatlons. figfi)JIIIiitfzgfj@Pj
~0'0 Pe POR ACTION/IRPO)O/ATIOR DHL 5-17-75 BUTLER(L)
It/
Cap> ~as CL>ZX(L)
V/
Copies PARR{L)
IP'/
Copies I)'NXEL(L)
LLT/
Copies SCh:(ENCER(L)
U/
Copies STOLZ (L)
U/
Copies VASSALLO(L)
'P/
Copies URPL'E (L)
H/I Copies ZXEIIANN(L) fl/
Copies DICKER(E)
H/
Copies'NXGHTON(E) "
It/
Copies YOUNGBLOOD(E)
H/
Copies n'ssrkoy rsssA T REGAN{E)
If/, Copies LEAR(L)
W~O~NKHC/pS M/+copies M/
Copies
TZXNC/STtZI.'ASH GXAIIBUSSO BOYD HOORE (L) (YL.CR)
D"=YOUNG(L){r~R)
SKGVIiOLT (L)
GOLLER(3.)
P, COLLINS DI")1XSE RRC O! R PIL."
& PRIIO7 (I)'P)ORRIS T"'Cii REVX
~>I SCHROED-R HACCARY IQ))XGHT PAMLICKI SIIAO STELLO HOUSTON NOVAK ROSS XPPOLXTO TEDESCO LONG LAINAS BENAROYA VOLIZER DE3TOII GPXIIHS GAIfHILL k&S'k' BALLAIG)
SPAI)GLER ERPIRO IiOLLER DICKER IQIXGHTON YOUNGBLOOD REGAN PROJECT LDR HARLESS LXC ASST DXGGS (L)
GEAR1N (L)
GOULBCURNE (L)
KREUTZER (E)
LEE (L)
IIAIGRET (I,)
REED (E)
SERVXCE (L)
SHEPPARD (L)
SLATER (E)
SMITH (1.)
TEETS (L)
MXLLXAHS {E)
WILSON (L)
A/T I'a:D BRAXTi~fAN SALTZi)~)).')7 B.
HURT PPLAI)IS MIICDONALD
~CHAPi~fAN DUBE w/input E.
COUPE D.
Tffo.'fPSON (2)
KLECI&R EX&I;NHUL
")""~>3 DXS-"'"U/I'I"'I I/~1 - LOCA'i. ~ons~NX -~~ster, N.Y T
C
<:.--,'.,: I.:'.")
(1)(2)(10)--'".TIO". L 1 - ASLB 9.-N.
Pr".Na71".C'i'G.',
Pa E-201 GT Ne(stnn Anoerson 1.-B~,:I S'>I i:."BI'.Ot)D, Rm E-201 C'L 16 ACRS HOLDXNG l-CQ'.iS1:)'
) ~
~
t II
~
ll y
)
~
~
1
(\\, ~
~"
. s ~
f, 'I'III
~
~
~
J t C~
EEfE /Eu
,itei,uietgy pocket Jiie ROCHESTER GAS AND ELECTRIC CORPORATION
, t o
89 EAST AVENUE, ROCHESTER, N.Y. 14649 I lg
~Op~
P5~
s Office of Plans and Schedules Directorate of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 TfLKPHONE ARCA COOK 7la 546-2700 Ginna Station May 8>
1975 q
8 Pgp ~~
CJ o
W<gP~c,>+>~
~I+
Subject:
Monthly Report, for April> 1975 Operating Status Information R.
E. Ginna Nuclear Power Plant Unit No.
1 Docket No. 50-244 Gentlemen:
Pursuant to the letter dated February 19>
1974 of Mr. L, Manning Muntzing> Director of Regulation>
enclosed herewith is the re-quested operating status information of the Ginna Station for the month of April~ 1975.
Very truly yours, C
zP~
Charles E. Platt Superintendent CEP:fah Enclosures
ll
'4p 'ff k
e 5
~ 'I
~
(
4 e
t t'nit <fl DATE:
Ma 77 1975 COhfPLETED BY:
Andrew E. McNamara Operations Aide
'Regulatory Docket File Telephone 01-716-546-2700, Ext. 291-214 at Ginna OPERA'TING STATUS 1.
REPORTING PERIOD:
0001 750401 TO 2400 750430 GROSS HOURS IN REPORTING PERIOD:
2
~
CURRENTLY AUTHORIZED POWER LEVEL hfWt 1520 hfax. Depend.
Capacity (hfWe-Net) 470 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY): (h(We Net) 4.
REASONS FOR RESTRICTIONS (IF ANY):
5
~
NUMBER OF HOURS THE REACTOR WAS CRITICALLY 6.
REACTOR RESERVE SHUTDOWN HOURS............
7.
HOURS GENERATOR ON LINE.................
~.
8.
UNIT RESERVE SHUTDOWN HOURS THIS hIONTH YEAR TO DATE 0
li663.0 0
1.18 0
lg646.0 CUhIULATI VE TO DATE 35 981.46 NA~r 34 848.13 9 ~
GROSS THERhfAL ENERGY GENERATED (hfWH) ~
~
~
~
~
~
10.
GROSS ELECTRICAL ENERGY GENERATED (MWH)...
11.
NET ELECTRICAL ENERGY GENERATED (MWH) ~.
~.
~
12.
REACTOR AVAILABILITYFACTOR (1)..........
13.
UNIT AVAILABILTYFACTOR (2).
~.....
14.
UNIT CAPACITY FACTOR (3) 0%
00/
.2 467 771 812g925 774 089 57.77%
57.
17'7.
2%
43 132 090 14p419g743 13 625 251 75.0%
73 26
- 65. 38%
15.
UNIT FORCED OUTAGE RATE (4)."
~
1 6
~
SHUTDOWNS SCHEDULED OVER NEXT 6 hfONTHS 7
( TYPE 7 DATE AND DURATION OF EACH):
- 17. IF SHUT DOWN AT END OF REPORT
- PERIOD, ESTIhlATED DATE OF STARTUP:
May 15'975 18.
UNITS IN TEST STATUS (PRIOR TO Coh(MERCIAL OPERATION):
INITIAL CRITICALITY INITIAL ELECTRICAl POWER GENERATION COhfhfERCIAL OPERATION DATE FORECASTED DATE ACHIEVED (1)
REACTOR AVAILABILITYFACTOR =
HOURS REACTOR WAS CRITICAL GROSS HOURS IN REPORTING PERIOD HOURS GENERATOR ON-LINE GROSS HOURS IN REPORTING PERIOD e100 0100 (3)
UNIT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED
<<7100 CURRENTLY LICENSED POWER LEVEL<<'GROSS HRS:
IN REPORTING PERIOD (4)
FORCED OUTAGE RATE
=
FORCED OUTAGE HOURS
<<c1 00 HOURS GENERATOR ON-LINE+ FORCED OUTAGE HOURS
~'('Data Not Available 48-88
I I
4
~
~
ENCLOSURE A
UNZT.Ginna Station> Unit gl May't 1975 COMPLETED BY Andrew E. McNamarat Telephone gl-716-546-2700 Operations Aide Ext. 291-214 at Ginna DAILY PLANT POWER OUTPUT hioNTII Aprilt 1975 DAY C
10 13 15 16 17 18 20 21 22 23 AVERAGE DAILY hBVe-net 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0
~ 0 0
DAY 25 26 27 28 29 30 31 AVERAGE DAILY Mme-net 0
0
. 0 0
0 0
49 87
P
SUMMARY
- Annual Refueling - Steam Generator Inspection - other maintenance REPORT MONTH April> 1975 UN I T NAME Ginna Stationy Unit 81 DATE Ma 7
1975 OOMPLEYEO BY Andrew E. McNamara, Telephone 1-716-546-2700 Operations Aide Ext. 291-214 at Ginna PLANT SHUTDOWNS NO.
DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)
REASON (I)
METHOD OF SHUTTING DOWN THE REACTOR (2)
COMMENTS 750310 720 A
Annual refueling shutdown continues, see date column.
(I)
REASON:
A -
EOUIPMENT FAILURE (EXPLAIN)
B - MAINT. OR TEST C - REFUELING D -
REGULATORY RESTRICTION E -
OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G -
OPERATIONAL ERROR (EXPLAIN)
(2)
METHOD:
A -
MANUAL B -
MANUAL SCRAM C -
AUTOMATIC SCRAM 49 89
- ~
(