ML18142B387
| ML18142B387 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 03/05/1976 |
| From: | Platt C Rochester Gas & Electric Corp |
| To: | NRC/IE |
| References | |
| Download: ML18142B387 (10) | |
Text
NRC FqAM 106 f2-76t U.S. NUCLEnil BEOULnTOAV COMMiSSiON DOCKET NUMOLll SO-244 NFIC DISTRIBUTION FoR PAR vO DOCI<I:-TMATERIAL FROM.
Of HEST R (rA '6 ELEC CORP ROCHESTER, NY FILE NUMQFR HONTIILY REPORT DATI: Ol: DOCUMENT 3-5<<76 NRC QI.ETTEB QOAiOINnL QCOPV QNOTOBIZED QUNCLnSSIFiED PROP C
E PLATT INPUT FORM DATE RECEIVED 3-12-76 NUMIIEBOF COPIES RECEIVED 1 signed DESCRIPTION LETTER TRANS THE FOLLO>nNG:
ENCLOSURF HOATIILY REPORT FOR FEBRUARY 1976 PLANT 6 COHPONENT OPERABILXTY 6c AVAILABILITY'HISREPORT TO BE USED XN PREPARING GRAY BOOK BY PLANS 6 OPERATXONS.
PLANT NAHE:. QxAAA l
I, 'f,'fbi~
HXPC CYS FOR AC ON FOR ACTION/INFORViATION BP~~GS INTERNALDIsl Rl BUTION iQ)SM M~Q,Pdd BRANCH CHXE1+L ua(
~
&1DR.'rc EXl ERNAL DISTRIBUTION CONTROL NUMBER NAC I:OflM 166 f2.76)
llilgf SS/
'(igjzi zwzz
////II/I/I
///SIFT///
ii ROCHESTER GAS AND ELECTRIC CORPORATION o
89 EAST AVENUE, Rye iX ROCHESTER, N.Y. 14649 TELEPHONE AREA cooE 7IE 546-2700 GINNA STATION March 5, 1976
$<gi le."~"t LICCii8tQIf8, Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C, 20555 LOS tgegigq
Subject:
Monthly Report for February 1976 Operating Status Informatio'n R. E. Ginna Nuclear Power Plant Unit No.
1 Docket No. 50-244 Gentlemen:
Pursuant to Technical Specification 6.9.l.c attached herewith is the monthly operating status report for Ginna Station for the month of
- February, 1976.
Also, ten addition'al copies of the attachment are enclosed.
Very truly yours, C~ C.
Charles E. Platt Superintendent CEP:bts Attachments cc:
Mr. James P. O'Reilly, NRC (1)
Mr. William G. McDonald, NRC (2) /'(K(j)
'hAQ]
p)9)6 ~
'~ AlvR'Y E&llO'1$jQg
- HEI $~(w 2533
0 I'
~
OPERATING DATA REPORT DOCKET NO.
50 2~4 OPERATING STATUS UNIT II1 Ginna Station DATE March 5, 1976 COMPLETEDBY~~
Andrew McNama a PERATI NS AIDE TELEPHONE Ext. 291-214, at Ginna 1,
REP0RTING PERI0D: Februar 1976 GRoss'HDURs IN REPDRTING PERIQD:
696 2.
cURRENTLY AUTHDRlzED PowER LEvEL (pwt)t 1520 MAxe DEPEND cAPAcITY (Mwe-Net)t 470 DESIGN ELECTRICAL RATING (MWe-Net)t 470 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe>et):
4.
REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL 6.
REACTOR RESERVE SHUTDOWN HOURS.
~
~
7.
HOURS GENERATOR ON LINE.;....
~
~
~
~
~
~
0 00',376.89 66.2 371 41,545.59 358.33*
40,283.63 8.
UNIT RESERVE SHUTDOWN HOURS 0
9.
GROSS THERMAL ENERGY GENERATED (MWH).
~.. ~......
~..
0 0
532,560 8.5*
50,903,434 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 11.
NET ELECTRICAL ENERGY GENERATED (MWH)~.........
~ ~,
0 175 205 16 981 066 166,526
'.1 6,058,891 12.
REACTOR SERVICE FACTOR 13.
REACTOR AVAILABILITYFACTOR 14.
UNIT SERVICE FACTOR 0
0 0
26%
31%
26%
75%
76%
73%
- 15. UNIT AVAILABILITYFACTOR 0
16.
UNIT CAPACITY FACTOR (Uslntt MDC)...
~
~
~
17.
UNIT CAPACITY FACTOR (Veiny Deslttn MWe)..
~
~
~
~
~
~
~
~
~
~
~
0 18.
UNIT FORCED OUTAGE RATE 0
25%
50%
66%
10%
~26'3%
25%
66%
19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)t 20.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPE A ri1 1 1976 2'I UNITS IN TEST STATUS (PRIOR TO COMMERCIALOPERATION):
FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
- Cumulative Date Commencing January 1,
1975 se ss Rtpv
$ 0/75
~ -w 8
o~
V l/
1 sk>>
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO..50 244 UNIT Nl @irma Station DATE March 5, 1976 COMPLETED BY Andrew McNamara, Operations Aide TELEPHON E 1-716-546-2700 Ext.291-214 at Ginna MONTH
- Februar, 1976 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)
DAY.AVERAGE DAlLYPOWER LEVEL (MWe-Net) 0 17 18 10 11 12 13 14 15 16 20 21 22 23 24 25 26 27 28 29
,30 31 INSTRUCTIONS On this form, list the average daily unit power level in MWe<'et for each.day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum depend-able capacity.'is used for the net electrical rating of the unit, there may.'be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). 'n such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly.
4 YY 4
g
~
41, 4
1 I f/~ QY
DOCKET NO.
50-244
SUMMARY
- Annual Re-fueling Outage Began.
Work Continued on f2 Low Pressure Turbine Blades Repair.
"A" & "B" Steam Generators, Inspection and Repair - Other Maintenance.
- February, 1976 NAME GINNA STATION, UNIT III March 5,1976 COMPLETED BY~~
'ndrew McNamara, Operations Aide TELEPH0NE 1-716-546-2700 Ext. 291-214 at Ginna UNIT SHUTDOWN AND POWER REDUCTIONS DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)
REASON (I)
METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)
CORRECTIVE ACTIONS/COMVIENTS 14 760129 696 C
- Continuation of this outage for entire report month.
- + Yearly outage fJl began on 1/29/76 as a forced unit shutdown.
Unit shutdown hours beginning 2/1/76 at 0001 were designated as scheduled shutdown hours for annual re-fueling and other maintenance.
(I)
REASON:
A -
EQUIPMENT FAILURE (EXPLAIN) 8 - MAINT. OR TEST C -
REFUELING D -
REGULATORY RESTRICTION E -
OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE OPERATIONAL ERROR (EXPLAIN)
H -
OTHER (EXPLAIN)
(2)
METHOD:
I -
MANUAL 2 -
MANUAL SCRAM 3 -
AUTOMATIC SCRAM 4 -
OTHER (EXPLAIN)
RKV.
l 0j75 i9 89
<.ri "
(
(~
)
~
~
~
~
~
4 J.
i I
a
~L u