Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209B818 + (21:07:20, 23 May 2025)
- ML20209B812 + (21:07:23, 23 May 2025)
- ML20209B809 + (21:07:24, 23 May 2025)
- L-99-024, Responds to NRC RAI Re Conversion to ITS for Chapters 3.4, 3.5,3.6,3.7,3.9 & 5.0,per 990419-20 Meetings with NRC + (21:07:25, 23 May 2025)
- ML20209B805 + (21:07:28, 23 May 2025)
- ML20209B799 + (21:07:30, 23 May 2025)
- 05000336/LER-1987-002, :on 870102,reactor Tripped on Low Steam Generator Level.Caused by Failure of Steam Generator 2 Feedwater Regulating Valve.Valve Repaired + (21:07:32, 23 May 2025)
- ML20209B794 + (21:07:34, 23 May 2025)
- ML20209B787 + (21:07:37, 23 May 2025)
- ML20209B780 + (21:07:40, 23 May 2025)
- ML20209B778 + (21:07:41, 23 May 2025)
- ML20209B777 + (21:07:43, 23 May 2025)
- 05000440/LER-1986-044, :on 860806,electrical Protection Assembly (EPA) Tripped.Caused by Failure of Capacitors in GE EPA Electronic Process Control (Pc) Board.Replacement of EPA Pc Boards Underway + (21:07:44, 23 May 2025)
- 05000336/LER-1987-001, :on 861222,intermittent Fire Alarms Received from Heat Detectors Above Reactor Coolant Pump 5.Caused by Heat Detector Failure.Faulty Detector Will Be Replaced.W/ + (21:07:52, 23 May 2025)
- ML20209B731 + (21:07:58, 23 May 2025)
- ML20209B724 + (21:08:02, 23 May 2025)
- 05000409/LER-1987-001, :on 870107,reactor Scrammed When Turbine Stop Valve Partially Closed.Possibly Caused When Turbine Reset During Simulated Overspeed Test or Oil Pressure at Stop Valve Temporarily Decreasing.Valve Closed + (21:08:05, 23 May 2025)
- ML20209B706 + (21:08:09, 23 May 2025)
- ML20209B703 + (21:08:11, 23 May 2025)
- L-99-104, Responds to GL 98-01,Suppl 1, Y2K Readiness at Nuclear Power Plants. Disclosure Rept Encl + (21:08:13, 23 May 2025)
- ML20209B690 + (21:08:18, 23 May 2025)
- ML20209B686 + (21:08:21, 23 May 2025)
- ML20209B682 + (21:08:23, 23 May 2025)
- 05000298/LER-1999-004, :on 990426,SRVs Were Found Outside TS Safety Function Lift Setpoint.Caused by Sufficient Corrosion Bonding.Srv Pilot Valve Assemblies Removed for Testing Were Replaced + (21:08:26, 23 May 2025)
- ML20209B676 + (21:08:28, 23 May 2025)
- ML20209B669 + (21:08:30, 23 May 2025)
- ML20209B665 + (21:08:33, 23 May 2025)
- 05000456/LER-1987-001, :on 870102,personnel Failed to Take Required Gas Sample w/H2 & O2 Analyzers Inoperable.Caused by Design Deficiency in Moisture Separator Filter.Filter Placed in Sample Gas Inlet Line to Remove Water + (21:08:36, 23 May 2025)
- ML20209B650 + (21:08:41, 23 May 2025)
- ML20209B642 + (21:08:44, 23 May 2025)
- ML20209B638 + (21:08:47, 23 May 2025)
- 05000440/LER-1986-042, :on 860801 & 19,diesel Generator Bldg Ventilation Sys Supply Fan Autostarted.Caused by Intermittent Signals Generated from Control Tachometer Due to Sys Noise.Tachometers Replaced + (21:08:48, 23 May 2025)
- ML20209B630 + (21:08:51, 23 May 2025)
- ML20209B624 + (21:08:53, 23 May 2025)
- ML20209B618 + (21:08:56, 23 May 2025)
- ML20209B605 + (21:09:00, 23 May 2025)
- ML20209B601 + (21:09:04, 23 May 2025)
- ML20209B597 + (21:09:07, 23 May 2025)
- ML20209B591 + (21:09:10, 23 May 2025)
- ML20209B585 + (21:09:12, 23 May 2025)
- 05000440/LER-1986-041, :on 860731,div 3 Diesel Generator & HPCS Pump Autostarted.Caused by Fluctuations in Output of Reserve Charger.Amplifier Card Replaced.Design Mod to Install Filter Network in Battery Charger Output Circuit Being Processed + (21:09:14, 23 May 2025)
- ML20209B568 + (21:09:18, 23 May 2025)
- ML20209B566 + (21:09:19, 23 May 2025)
- ML20209B560 + (21:09:21, 23 May 2025)
- ML20209B556 + (21:09:23, 23 May 2025)
- ML20209B553 + (21:09:25, 23 May 2025)
- 05000382/LER-1986-011-01, Forwards LER 86-011-01,revised Per Determination That Deviations to App R Requirements for Fire Barriers w/228 Seals Identified to Have Sleeve Type Configuration as Described in LER Not Required + (21:09:27, 23 May 2025)
- ML20209B551 + (21:09:27, 23 May 2025)
- ML20209B544 + (21:09:30, 23 May 2025)
- ML20209B537 + (21:09:32, 23 May 2025)
- CLI-81-30, Forwards Ltr to Util Re Approval of Teledyne Engineering Svcs 820402 Plan for Phase I of Independent Design Verification Program Per Commission Order CLI-81-30 & Request for Addl Info + (21:10:12, 23 May 2025)