Text
- , [p":vg y w/
o, UNITED STATES
' 8 *i
'. g jj NUCLEAR REGULATORY COMMISSION j ^e WASHINGTON, D. C. 20555 4
5
- DEC 15 1982 M
LI MEMORANDUM FOR: Darrell G. Eisenhut, Direqtor Division of Licensing FROM:
Richard H. Vollmer, Director Division of Engineering
SUBJECT:
DIABLO CANYON IDVP Attached is an updated DE program plan for conduct of the Diablo Canyon IDVP review. The plan currently focuses on completion of activities necessary for fuel load and thus extends through March 1983. As the PG&E program matures in early 1983 we will continue to update the plan and extend it through low power operation and full power operation.
Review of the program for restoration of the breakwater continues in the HGEB, outside the scope of this plan.
We have divided the IDVP review activities into four groups of review tasks as discussed below and as indicated on Enclosures 1 thru 4 The first group of review tasks concerns evaluation of the ir.terim technical reports (ITRs) produced by the IDVP. The information available to us at this time lists 33 potential ITR's. Thirteen of those ITR's have been submitted to the NRC. We have presently completed review of seven ITR's and have initiated review of the remainder.
We have selected a group of the more significant ITP,'s to use as a vehicle for a continuing audit of the IDVP review process. We are also using the ITR reviews as a means of evaluating the Error and Open Item (E01) reports submitted over the course of the IDVP. The best of our knowledge all E01's will be treated in the ITR's.
, to this memo reflects the complete ITR review schedule now contemplated (.ITR 1 through 7 have been omitted from the chart since these reviews are already complete).
Note that the single or double digit designation (8 through 13) is used for reports that have been completed and issues by the IDVP. The 3 digit items (104 through 141) are listed in anticipated order of completion. As items 104 through 141 are completed by the IDVP they will be assigned the next 2 digit designations in succession; some may be combined and some may be deleted as the IDVP program progresses.
The second group of review tasks concerns the resolution of outstanding issues identified by Region V and listed in Enclosure 3 to SECY 82-414.
There are 13 specific tasks in this group. One task has been resolved and at least 3 of these can,be tied to designated ITR's and will be treated in conjunction with those ITR reviews.
p -
\\
LM' Y#
Vh3 2 L 5.\\
n y
ss
Darrell G. Eisenhut DEC 15 M82 The third group of tasks concern the our (counting the original containment annulus vertical analysi independent analyses now underway at Brookhaven National Laboratory (B
).
Based on the issuance of our request for information dated December 1,1982 and the cooperation received to date from PG&E in the supply of that infonnation we anticipate completion 'of these analyses within the time frame of the overall fuel load review. ' Residual matters concerning the results of these analyses may extend into the time period envisioned. for completion of Phase II.
The fourth group of tasks concerns the ongoing review of the PG&E Phase I final report, the review of the IDVP Phase I final report (and/or status reports) and the preparation of the SER (initial SER for fuel load and supplements as required).
Richard H. Vollmer, Director Division of Engineering Office of Nuclear Reactor Regulation cc:
H. Denton E. Case R. Mattson J. Knight J. Taylor IE R. Engelken, RV T. Novek F. Schauer H. Polk P. Kuo 4
1
l Enc 1:stre 1 ITR REVIEW REVIEW REVIEWER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH TASK 1 8 15 22 29 6 13 20 27 3 10 17 24 31 7 14 21 28 7 14 21 8
SEB 9
OAB 10 SEB audit corrective action 11 SEB/MEB/BNL
^
12 MEB/BNL corrective action 13 SEB 104 MER/BNL ccercetive action 105 MEB/BNL audit correctike action 107 MEB/BNL 108 MER/BNL audit 109 MEB/BNL 110 SEB/EQB 111 MEB/BNL audit 5
113 SEB 118 SEB audit corrective action 119 MEB/BNL audit 121 SEB/EQB audit 173 MEB/BNL 124 MEB/BNL 127 SEB 178 SEB/MER/E0B/QAB/BNL 129 SEB/HGEB 133 SER s 134 SER 135 SEB/BNL audit 141 BNL/MER carrective action
- - - No release schedules have been established by IDVP.
7.-
LIST OF ITRs ITR No. 1 Additional Vertf tcation and Sampling 2
QA Program 3
Tanks 4
Shake Table testing 5
Design Chain 6
Auxiliary Building 7
Electrical Equipment - Conduit Support 8
Verification Program for PG8E Corrective Action 9
Design Chain - Non Seismic Prior to 6/78 10 Hosgri Spectra 11 PG&E/NSSS Seismic Interface 12 Piping 13 Intake Structure 1 04 Initial Evaluation - Pipe Supports 105 Initial Evaluation - Small Bore Piping 107 Initial Evaluation - CCW Heat Exchanger 108 Initial Evaluation - Valves 109 Initial Evaluation - Pumps 110 Initial Evaluation - Electrical Equipment 111 Initial Evaluation - HVAC Components 113 Initial Evaluation - HVAC Duct Supports 118 Additional Activities - Buildings 11 9 Additional Activities - Piping 121 Additional Activities - Electrical Equipment 123 Additional Activities - Pumps 124 Additional Activities - HVAC Components 127 Containment Annulus Structure 128 Relative to Fuel Loading 129 Verification of Soils 133 Initial Evaluation - OWST 134 Initial Evaluation - Buried Tanks 135 Initial Evaluation - Buried Piping 141 Electrical Equipment - Conduit Support
Encloscre 2 RE50 Lilt 10N OF OUTSTANDING ISSUES ENCLOSURE 3 TO SECY-87-414 REVIEW REVIEWER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH TASK 1 8 15 22 29 6 13 20 27 3 10 17 24 31 7 14 21 28 7 14 21 1
SEB Sec ITR 118
,2 Reg V/MEB 3
NRR Resolved 4
Reg V/BNL/MEB 5
SEB See ITR 13 6
SEB 7
SEB 8
BNL/MEB 9
SER/EQB See ITR 110,121 10 BNL/SEB 11 BNL/SEB/MEB 12 SEB 13 SEB No schedules have been established by ITP.
t
DIABLO CANYON IDVP OPEN INSPECTION ITEMS 1.
. Auxiliary Building - Verify that the _ seismic analysis model adequately characterizes the seismic responses of the structure and the in-situ structure masses and stiftnesses. This matter will be resolved by the IDVP and the NRC staff.
2.
Criteria for Measurement Tolerances and Piping Supports - This matter will be resolved by the ITP and reviewed by the IDVP and the NRC staff.
3.
Examine Changes to IDVP - This matter will be resolved by the NRC staff.
4.
Piping As-Built Discrepancies - Verify the piping models reflect as-built configurations. This matter will be resolved IDVP and the NRC staff.
5.
Intake Structure - Verify that all safety related components were designed considering appropriate response spectra corresponding to their attachment points. This matter will be resolved by the IDVP and the NRC staff.
' 6.
Containment Polar Crane - Verify the structural integrity and response of the polar taking into account the 3-D seismic excitation of the crane This matter and the flexibility of the seismic stop support structures.
will be resolved by the ITP and reviewed by the IDVP and the NRC staff.
7.
Dome Service Crane - Verify the structural integrity of this crane considering appropriate response of the supporting polar crane. This matter will be resolved by the NRC staff.
Piping and Support - Verify that piping analysis procedures include 8.
the load combination or stress allowable criteria and that appropriate snubber flexibilities are included in the RCLA analyses. This matter will be resolved by the NRC staff.
Main Annunciator Cabinet - Verify the adequacy of RCLA equipment 9.
' calculations, the PGAE cabinet response calculations and the in-situ adequacy ofthe cabinet construction. This matter will be resolved by the IDVP and the NRC staff.
Flexibility of Certain Containment Structures,- Verify the adequacy'of 10.
the structures and the attached piping, equipment and components considering the flexibility of the steam generator and pressurizer This will be enclosures, containment pipeway and exhaust vent.
resolved by the IDVP and the NRC staff.
Annulus Spectra Revisions - Verify that piping attached to annulus have 11.
This matter will be been analyzed for appropriate response spectra.
resolved by the IDVP and the NRC staff.
- 12. Blume Internal Review - Followup - This matter will be resolved by the ITP, IDVP and the NRC staff.
~
- 13. Response Spectra Document Control Manual (DCM) Adequacy - This matter will be resolved by the IDVP and the NRC staff.
4 i
i i
I i
f f
n i
O J
)
1 i
l i
1 l
r 1
i
EJ:citstre 3 It! DEPENDENT ANALYSES RFVIEW REVIEWER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH TA5r 1 8 15 22 29 6 13 20 27 3 10 17 24 31 7 14 21 28 7 14 21 Annulus BNL/SER information obtained from PGE8E Structure Horizontal Analysis completed Analysis Final report Buried BNL/SER Information obtained Tank Analysis completed Final report Piping BNL/MER Information obtained Problems Analysis completed-Final reoort 9
.a
R Enclestre 4 REVIEW PEVIEWEP MOVEMBER
'DECEMRER JANUAPY FEBRUARY MAP.CH TASK 1 8 15 22 29 6 13 20 27 3 10 17 24 31 7 14 21 28
~7 14 21 PGAE SER/MER/EQB/QAR/BNL Audit Phase I Final Report IDVP.
SEB/MER/E06/QAB/BNL Phase I Final Peport 6
SER SEB/MEB/E0B/QAB/BNL Input 9