ML20209B544
Jump to navigation
Jump to search
| ML20209B544 | |
| Person / Time | |
|---|---|
| Site: | 05000000, Diablo Canyon |
| Issue date: | 05/18/1982 |
| From: | Sniezek J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Case E Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20209B155 | List:
|
| References | |
| FOIA-86-151 NUDOCS 8208040019 | |
| Download: ML20209B544 (1) | |
Text
- _ ____________
p * *
- c
,'o, oa 3
..,("t UNITED STATES NUCLEAR REGULATORY COMMISSION -
7
}
,,vg;f g> g j
. J*
,(
r.
WASHINGTON, D. C. 20555 g
'o,
,/
MAY 18133 l
- ((U NOTE TO: Ed Case,' NRR lj fSh d
~
FROM:
Jim Sniezek, IE y
g4 m. D~..R
SUBJECT:
DIABLO CANYON - UNDATED LETTER FROM A CONCERNED ENGINEER On'May 18, I received the enclosed letter from "a concerned engineer" stating several concerns regarding the seismic reanalysis being conducted at Diabl'o Canyon.
It appears appropriate that the concerns raised in the letter be factored into NRC review of the reverification effort.
G, %'
J m Sniezek, IE
Enclosure:
Undated Letter Received On May 18,1982 cc:
R. H. Engelken, RV E. L. Jordan, IE r
e t'2.0 % b % Ul ',
h,
\\
J
_ - -