Issue date | Title | Topic | |
---|---|---|---|
ML18153B041 | 11 August 1994 | NPDES Noncompliance Rept,Consisting of Initial Abatement Rept for SPS Petroleum Release Pc# 94-3824:on 940509,found Oil Sheen in Discharge Canal.Leaking Oil Line Taken Out of Svc & Interior of Pipe Inspected W/Boroscope | Hydrostatic |
ML18153A940 | 11 May 1994 | NPDES Noncompliance Notification:On 940509,oil Sheen Observed in Plant Discharge Canal.Hydrostatic Testing of Supply Lines to EDG Indicates Existence of Leak in One Line. Leaking Suppl Line Isolated Until Corrections Can Be Made | Time of Discovery Hydrostatic |
ML18153B436 | 27 December 1993 | Submits follow-up to Telephone Notification of Oil Discharge Rept 94-1332.On 931220,oil Found at Permanent Oil Boom in Discharge Canal | Time of Discovery |
ML18153C844 | 18 December 1991 | NPDES Noncompliance Notification:On 911126,discharges Made from Outfalls 141 (Waste Neutralization Sump 1A) & 171 (Waste Neutralization Sump 2B) W/O Performing Full Discharge Monitoring.Standing Order to Chemistry Dept Issues | |
ML18153C744 | 16 September 1991 | Confirms 910911 Unusual Discharge During Final Stages of Dewatering of High Level Intake Screen Well to Allow for Maint Operations.Solids from Bottom of Well Were Pumped Over to Storm Drain Leading to Outfall 001 | |
ML18153B726 | 10 May 1989 | NPDES Noncompliance Notification:In Apr 1989,plant Experienced Two NPDES Permit Exceptions Re Operation of New Ultraviolet Sewage Treatment Sys.Corrective Actions Will Continue to Include Supplemental Wasting of Uv Tubes | |
ML18153B676 | 3 April 1989 | NPDES Noncompliance Notification:Oil Spills Observed in Discharge Canal.Floating Containment Booms,Used to Contain Any Oil Discharges Permanently Installed Across Canal.Nrc to Be Notified If Release Escape Discrete Containment Area | |
ML18153B608 | 13 February 1989 | NPDES Noncompliance Notification:On 890208,small Oil Sheen Discovered in Upper End of Station Discharge Canal.Caused by Oil Collection Pan Beneath Crane Accidentally Tipped Over. Absorbent Boom Placed at Mouth of Storm Drain | |
ML18153B607 | 10 February 1989 | NPDES Noncompliance Notification:On 890119,average Permit Limit for Fecal Coliforms Exceeded 200 mpn/100 Milliliter. Util Will Keep State Informed of Status of Corrective Actions | |
ML18153B579 | 4 January 1989 | Informs That on 880102,oil Sheen in Upper End of Station Discharge Canal Discovered.Caused by Failure of Storm Drain Boom Which Allowed Runoff.Absorbent Pads Used to Clean Up & Storm Drain Boom Replaced | |
ML18153B567 | 30 December 1988 | NPDES Noncompliance Notification:On 881222,discovered Small Sheen of Oil in Condenser Cooling Water Discharge Canal. Caused by Oil Boom Around West Yard Coming Apart & Releasing Small Amount of Oil.Absorbent Matl Used to Clean Up Oil | |
ML18153B478 | 23 June 1988 | NPDES Noncompliance Notification:On 880619,station Security Personnel Reported Oil Sheen in Station Discharge Canal. Caused by Faulty Skimmer on Turbine Sump B.Spill Was Contained by Temporary Boom Placed in Discharge Canal | |
ML18152A994 | 13 June 1988 | NPDES Noncompliance Notification:On 880609,oil Sheen in Station Discharge Canal Discovered.Caused by Heavy Rainfall Making 5-10 Gallons of Oil to Overflow Through Storm Drain to Discharge Canal.Spill Contained W/Absorbent Boom | |
ML20205S590 | 5 June 1986 | NPDES Noncompliance Notification:On 860521,Package Boiler 'A' Blowdown Tank,Discharge 091,discovered Drained.No Effluent Sample Obtained.Caused by Improperly Seated Valve. Formal Work Request Submitted for Repair of Valve | |
ML20197D359 | 7 May 1986 | Noncompliance Notification:On 860429,composite Sample of Effluent from Outfall 011 Revealed Biological Oxygen Demand of 6.75 mg/1,exceeding Monthly Average Limit.Corrective Actions Successful | |
ML20197B602 | 2 May 1986 | NPDES Noncompliance Notification:On 860422,biological Oxygen Demand of Composite Effluent Sample Exceeded Permit Limits. Caused by Introduction of Foreign Substance.Max Air Input to Generation Tanks & Return Sludge Provided | |
ML18149A042 | 4 February 1986 | NPDES Noncompliance Notification:On 860121,composite Sample of Effluent Taken from Outfall 011,sewage Treatment Plant. Analytical Results Revealed Biological Oxygen Demand in Excess of Limits.Caused by Input of Clean Domestic Water | |
ML20136D233 | 6 November 1985 | NPDES Noncompliance Notification:On 851025,analysis of Grab Sample Taken from Outfall 081 (Turbine Sump) Revealed Oil & Grease Level of 32.7 Mg.Probably Caused by Water Transfer from Collection Pits.No Corrective Action Needed | Grab sample |
ML18143B649 | 4 October 1985 | NPDES Noncompliance Notification:Flow for Outfall 011 Sewage Treatment Plant Estimated for Sept Rather than Reflecting Recorded Results.On 850928,sample Taken from Outfall 002 Oil Tank Diked Area Discharge Exceeded Limits | |
ML20137W700 | 25 September 1985 | NPDES Noncompliance Notification:On 850907,chlorine Residual at Outfall 011 at Sewage Treatment Plant Exceeded Effluent Limitations.Subsequent Test Results within Limitations.No Corrective Action Planned | |
ML20137M823 | 6 September 1985 | NPDES Noncompliance Notification:On 850828,flow Recording Pen for Outfall 011 Sewage Treatment Plant Did Not Respond to Input Voltage.Caused by Malfunctioning Flow Integrator Part.Daily Estimate of Flow Continuing | |
ML20137B511 | 13 August 1985 | NPDES Noncompliance Notification:On 850810,analysis of Grab Sample Taken from Outfall 002 (Gas Turbine Oil Tank Dike), Revealed Ph Less than Allowed 6.0 Std Units.Probably Caused by Rainwater.No Corrective Actions Planned | Grab sample |
ML20133H239 | 31 July 1985 | NPDES Noncompliance Notification:On 850719,flow Recording Pen for Outfall 011 (Sewage Treatment Plant) Did Not Respond to Input Voltage.Caused by Malfunctioning Flow Integrator Parts.Parts Ordered & Nonrecording Meter Used | |
ML20128L912 | 12 July 1985 | Supplemental NPDES Noncompliance Notification:On 850710, Review of June 1985 Discharge Monitoring Rept for Outfall 002 Revealed Excessive Total Suspended Solid Levels. Rainwater in Dike Will Be Retained for Longer Period | |
ML20128L245 | 9 July 1985 | NPDES Noncompliance Notification:During June 1985,required Sampling of Process Stream 121 (Boron Recovery Sys),Not Taken,In Spite of 850601-03 Releases.Failure to Obtain Sample Discussed W/Personnel | |
ML18142A480 | 17 June 1985 | NPDES Noncompliance Notification:On 850613,grab Sample from Outfall 002,gas Turbine Oil Tank Dike,Registered Ph of 5.7, Lower than 6.0 Ph Allowed by Permit.Probably Caused by Acid Rain,As Oil Spill from Tank Never Occurred | Grab sample |
ML20127D033 | 12 June 1985 | NPDES Noncompliance Notification:On 850610,max Permit Limit of 20 Mg/L Exceeded.Grab Sample Revealed Oil & Grease Content of 57.4 Mg/L.No Immediate Corrective Action Taken Due to Sample Taken After Discharge Completed | Grab sample |
ML20127D046 | 10 June 1985 | NPDES Noncompliance Notification:On 850605,oil Spilled in Facility Water Discharge Canal.Caused by Oil Entering Storm Drain from Nearby Equipment & Running Off During Heavy Rainfall.Spill Cleaned.Floating Boom Placed Around Drain | |
ML20126C951 | 3 June 1985 | NPDES Noncompliance Notification:On 850529,oil Spill from Storm Drain Discovered.Caused by Surface Runoff Due to Rain. Oil Dispersed Before Cleanup Procedures Initiated | |
ML18142A388 | 2 May 1985 | NPDES Noncompliance Notification:On 850430,total Suspended Solid Level Calculated from Sewage Treatment Plant Outfall 008 Effluent Exceeded Max Monthly Average Limit.Synthetic Seed Promoting Bacterial Action Will Be Used | |
ML20115H329 | 9 April 1985 | NPDES Noncompliance Notification:On 850405,discovered Light Sheen of Oil 5x25 Ft in Station Discharge Canal.Caused by Failure of Oily Water Transfer Pump.Commercial Oil Sorbent Matl Used to Construct Containment & Pump Repaired | |
ML18142A337 | 11 March 1985 | NPDES Noncompliance Notification:On 850305,06 & 07,excessive Ph Levels Discovered in Grab Samples from Outfalls 101 & 601.Corrected Jan 1985 NPDES Discharge Monitoring Rept for Outfall 601 Encl.W/O Encl | Grab sample |
ML20106G939 | 1 February 1985 | NPDES Noncompliance Notification:On 850130,100 Gallons of 0.0003% Hegatreat Solution Entered Turbine Basement Sump A. Procedure Stopped & Personnel Involved Instructed Not to Allow Release of Matl in Future | |
ML20100P821 | 3 December 1984 | NPDES Noncompliance Notification:On 841130 & 1203,average Value of Total Suspended Solids & Average Value of BOD5 Exceeded Limit of 30 Mg/L,Respectively.Caused by Increased Hydraulic Load & Introduction of Foreign Substances | |
ML18142A128 | 14 November 1984 | NPDES Noncompliance Notification:On 841107,4 H Composite Sample for Total Suspended Solids Exceeded Permit Limit. Caused by Increased Hydraulic Load at Peak Flow Times.Daily Wasting of Clarifier Sludge Undertaken | |
ML18141A503 | 9 February 1984 | NPDES Noncompliance Notification:Updates Status of Chlorination Sys at Sewage Treatment Plant.Malfunctioning Gas Feed Sys Reported in 840201 Ltr Returned to Operation on 840203 | |
ML18141A494 | 3 February 1984 | NPDES Noncompliance Notification:On 840201,discovered That Chlorine Gas Feed Sys Failed to Supply Chlorine to Effluent. Caused by False Rate Meter Reading Due to Water Pressure. Hypochlorite Addition Method Substituted | |
ML18141A079 | 27 July 1983 | NPDES Noncompliance Notification:On 830715,grab Sample of Effluent from Sewage Treatment Plant Found Equal or Greater than 2,400 MPN/100 Ml.Caused by Foreign Substance in Sys. Foreign Substance Removed.No Adverse Impact Observed | Grab sample |