NPDES Noncompliance Notification:On 881222,discovered Small Sheen of Oil in Condenser Cooling Water Discharge Canal. Caused by Oil Boom Around West Yard Coming Apart & Releasing Small Amount of Oil.Absorbent Matl Used to Clean Up Oil
ML18153B567
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/30/1988
From: Marshall B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Ronaldo Jenkins
VIRGINIA, COMMONWEALTH OF
References
NUDOCS 8901100107
Download: ML18153B567 (1)


Text

! """'"'"II("'='"~

""'" "'"'"'" """,, ~,

December 30, 1988 Mr. R. R. Jenkins, Jr.

VIRGINIA POWER Virginia Water Control Board Piedmont Regional Office 2201 W. Broad Street Richmond, Virginia 23230

Dear Mr. Jenkins:

Re: Surry Power Sta ti on - Oi 1 Spi 11 This is to confirm our earlier report of an oil spill that occ~rred at Surry Power Station on December 22, 1988.

At approximately 3:35 p.m., station personnel discovered a very small sheen of oil in the condenser cooling water discharge canal. The source was discovered to be the west yard drain in the protected area. The oil boom around the yard drain came apart, releasing a small amount of oil.

Station personnel used absorbent material to clean up the oil in the discharge canal an~ storm drain. The oil boom was repaired to prevent a recurrence.

No apparent adverse environmental impact to state waters, wildlife or public property was observed to result from the spill. If you have any questions regarding this matter, please contact Mr. Glenn Bishop at 273-2988.

B. M. Marshall, Manager Water Quality cc: U.S.N.R.C., Atlanta, Georgia, Docket #50/280-50-281 U.S,f~~')WasMngton, D.C., Docket #50/280-50-281 U.S.N.R.C., Senior Resident Inspector, Surry Power Station

  • =:9011(l()107 :=:81230 F'[IR ADOCK t:>50002:30 PDC