 Issue dateTitleTopic
IR 05000324/19990066 October 1999Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant SupportLocked High Radiation Area
Siren
IR 05000369/19990064 October 1999Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support
IR 05000324/199900527 August 1999Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant SupportCondition Adverse to Quality
Foreign Material Exclusion
Feedwater Heater
Excess Flow Check Valve
Through-Wall Leak
Through Wall Leak
Loss of condenser vacuum
IR 05000369/199900526 August 1999Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant SupportHydrostatic
Probabilistic Risk Assessment
Time Critical Operator Action
Fire Protection Program
IR 05000324/199900419 July 1999Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program ReviewHigh Radiation Area
Locked High Radiation Area
Condition Adverse to Quality
Missed surveillance
Foreign Material Exclusion
Fuel cladding
Fire Watch
IR 05000369/199900413 July 1999Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant SupportSafe Shutdown
Unanalyzed Condition
Fire Barrier
Past operability
Probabilistic Risk Assessment
Job Performance Measure
Fire Watch
Unidentified leakage
IR 05000369/199901016 June 1999Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling OutageHigh Radiation Area
Locked High Radiation Area
IR 05000324/19990037 June 1999Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant SupportSafe Shutdown
Reactor Vessel Water Level
Non-Destructive Examination
Fire Barrier
Weld Overlay
Past operability
Emergency Lighting
Condition Adverse to Quality
Missed surveillance
Local Leak Rate Testing
Feedwater Heater
Fire Protection Program
Power Uprate
IR 05000369/19990032 June 1999Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant SupportUnanalyzed Condition
Coatings
Foreign Material Exclusion
Operability Determination
Earthquake
Pressure Boundary Leakage
Manual Operator Action
IR 05000324/199900226 April 1999Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant SupportSafe Shutdown
Fitness for Duty
High Radiation Area
Fire Barrier
Hydrostatic
Fire impairment
Missed surveillance
Coast down
IR 05000369/199900223 April 1999Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant SupportHydrostatic
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
IR 05000400/19990099 April 1999Partially Withheld Insp Rept 50-400/99-09 on 990308-12 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected: Aspects of Licensee Plant Support Re Physical Security Program for Power Reactors
IR 05000324/199801418 March 1999Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering ActivitiesSafe Shutdown
Stroke time
Operability Determination
Maintenance Rule Program
Power Uprate
Overspeed trip
Loss of condenser vacuum
Water hammer
IR 05000324/199900115 March 1999Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant SupportNon-Destructive Examination
Offsite Dose Calculation Manual
Nondestructive Examination
Annual Radiological Environmental Operating Report
Intergranular Stress Corrosion Cracking
Fire Protection Program
Power change
Downpower
Reverse polarity
Siren
Water hammer
IR 05000369/199900110 March 1999Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportSafe Shutdown
Fire Barrier
Rod Drop Event
Scaffolding
IR 05000324/199801128 January 1999Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant SupportHigh Radiation Area
Fire Protection Program
IR 05000324/199801021 December 1998Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics InspSafe Shutdown
Time of Discovery
Stroke time
Anchor Darling
Locked High Radiation Area
Feedwater Heater
Scaffolding
IR 05000369/199801018 December 1998Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportSafe Shutdown
Grab sample
Fire Barrier
Past operability
Annual Radiological Environmental Operating Report
Severe Accident Management Guideline
Rod Drop Event
Maintenance Rule Program
Fire Watch
Siren
IR 05000324/199801324 November 1998Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support
IR 05000324/19980099 November 1998Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant SupportOffsite Dose Calculation Manual
Stroke time
Past operability
Job Performance Measure
Operability Determination
Operability Assessment
IR 05000369/199800930 October 1998Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant SupportSafe Shutdown
Boric Acid
Shutdown Margin
Non-Destructive Examination
Safe Shutdown Earthquake
Fire impairment
Job Performance Measure
IR 05000324/199800828 September 1998Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportSafe Shutdown
Fire Barrier
Stroke time
Emergency Lighting
Missed surveillance
Fire Protection Program
Early Warning Fire Detection
Siren
IR 05000369/199800821 September 1998Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant SupportLoop seal
Stroke time
Past operability
Enforcement Discretion
Temporary Modification
Foreign Material Exclusion
Operability Determination
Overspeed trip
IR 05000369/199801127 August 1998Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser SystemUnanalyzed Condition
IR 05000324/199800711 August 1998Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportSafe Shutdown
Time of Discovery
High Radiation Area
Half scram
Stroke time
Past operability
Probabilistic Risk Assessment
Locked High Radiation Area
Condition Adverse to Quality
Local Leak Rate Testing
Foreign Material Exclusion
Eddy Current Testing
Operability Determination
Fire Protection Program
Scaffolding
IR 05000369/19980077 August 1998Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant SupportSafe Shutdown
Boric Acid
High Radiation Area
Non-Destructive Examination
Fire Barrier
Nondestructive Examination
Temporary Modification
Emergency Lighting
Locked High Radiation Area
Finite Element Analysis
Foreign Material Exclusion
Earthquake
Liquid penetrant
Pressure Boundary Leakage
Fire Protection Program
Dissimilar Metal Weld
Unidentified leakage
IR 05000324/19980066 July 1998Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportSafe Shutdown
Unanalyzed Condition
Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Hydrostatic
Past operability
Enforcement Discretion
Fire impairment
Locked High Radiation Area
Local Leak Rate Testing
Foreign Material Exclusion
Scram Discharge Volume
Eddy Current Testing
Earthquake
Liquid penetrant
Fire Protection Program
Dissimilar Metal Weld
IR 05000369/199800625 June 1998Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant SupportBoric Acid
Fitness for Duty
High Radiation Area
Probabilistic Risk Assessment
Coatings
Stress corrosion cracking
IR 05000369/19980044 June 1998Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportSafe Shutdown
Rod Drop Event
Exemption Request
IR 05000324/19980051 June 1998Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant SupportSafe Shutdown
Half scram
Fire Barrier
Coatings
Fire impairment
Operability Determination
Maintenance Rule Program
Fire Protection Program
Fire Watch
Scaffolding
Operability Assessment
IR 05000369/199800318 May 1998Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportUnanalyzed Condition
Safe Shutdown Earthquake
Post Accident Monitoring
Temporary Modification
Incorporated by reference
Operability Determination
Downpower
Water hammer
ML20216H44316 April 1998Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time TestingReactor Vessel Water Level
Enforcement Discretion
Nondestructive Examination
Through Wall Leak
IR 05000324/199800313 April 1998Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional InspectorsPacking leak
High Radiation Area
Stroke time
Locked High Radiation Area
Operability Determination
Earthquake
Power change
Weak link
Operability Assessment
ML20216H6176 April 1998Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant SupportUnanalyzed Condition
Boric Acid
Stroke time
Past operability
Rod Drop Event
Negative Flux Rate Trip
ML20217C80616 March 1998Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness ExerciseEarthquake
Minimum staff
Overspeed trip
ML20216B1742 March 1998Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant SupportNondestructive Examination
Foreign Material Exclusion
IR 05000369/199702023 February 1998Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical SecurityHigh Radiation Area
Hydrostatic
Past operability
Enforcement Discretion
Temporary Modification
Locked High Radiation Area
Foreign Material Exclusion
IR 05000369/199800117 February 1998Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier SysSafe Shutdown
ML20202D3165 February 1998Omitted Page 42 to Insp Repts 50-324/97-13 & 50-325/97-13 Transmitted on 980123Fire Protection Program
ML20199G75023 January 1998Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP InspsSafe Shutdown
Unanalyzed Condition
High Radiation Area
Fire Barrier
Stroke time
Locked High Radiation Area
High Energy Line Break
Excess Flow Check Valve
Operability Determination
Control of Heavy Loads
Fire Protection Program
Fire Watch
Scaffolding
Power Uprate
ML20198P37712 January 1998Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant SupportStroke time
Nondestructive Examination
Temporary Modification
Liquid penetrant
Backfit
Flow Induced Vibration
ML20199B1645 January 1998Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment BldgSafeguards Contingency Plan
ML20198N65630 December 1997Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt MeetingsHigh Radiation Area
Locked High Radiation Area
IR 05000324/199701430 December 1997Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt MeetingsHigh Radiation Area
Locked High Radiation Area
ML20197H1888 December 1997Insp Repts 50-324/97-12 & 50-325/97-12 on 970928-1108. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportContraband
Nondestructive Examination
Operability Determination
Power change
Downpower
Operability Assessment
Power Uprate
IR 05000369/19970171 December 1997Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportSafe Shutdown
Boric Acid
Non-Destructive Examination
Temporary Modification
Foreign Material Exclusion
Code Reconciliation
Control of Heavy Loads
Liquid penetrant
Scaffolding
Water hammer
IR 05000324/199701127 October 1997Insp Repts 50-324/97-11 & 50-325/97-11 on 970819-0927. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant SupportSafe Shutdown
High Radiation Area
Stroke time
Fire impairment
Local Leak Rate Testing
Scram Discharge Volume
Fire Protection Program
Scaffolding
Weak link
IR 05000369/199701520 October 1997Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportEddy Current Testing
IR 05000369/199701222 September 1997Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness ExerciseSiren
ML20211E79816 September 1997Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet DoorsGOTHIC