| | Start date | Site | Title |
|---|
| ML24016A070 | 8 March 2024 | Wolf Creek | Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications |
| ML24103A233 | 13 February 2024 | | Summary of the February 13, 2024 RG 1-183 Update Workshop (2 of 3) |
| ML24043A120 | 13 February 2024 | Nuclear Energy Institute | 2- CR Dose Presentation Workshop 2 |
| ML23292A151 | 12 October 2023 | Susquehanna | 1 to Updated Final Safety Analysis Report, Chapter 15, Section 15.4, Reactivity and Power Distribution Anomalies |
| ML23129A303 | 20 April 2023 | Cooper | 1 to Updated Safety Analysis Report, Section Xiv, Station Safety Analysis |
| ML22292A125 | 5 October 2022 | Nine Mile Point | 5 to Updated Final Safety Analysis Report, Chapter 15, Appendices |
| ML22165A105 | 12 July 2022 | Sequoyah | Issuance of Amendment Nos. 357 and 351 Regarding Revision to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation |
| CNL-21-001, Application to Modify the Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation (SQN-TS-21-01) | 29 November 2021 | Sequoyah | Application to Modify the Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation (SQN-TS-21-01) |
| ML21294A248 | 12 October 2021 | Susquehanna | 0 to Updated Final Safety Analysis Report, Section 15.4, Reactivity and Power Distribution Anomalies |
| ML21252A363 | 15 September 2021 | Sequoyah | Pre-Submittal Meeting for License Amendment Request to Eliminate the High Negative Flux Rate Trip |