August 2002 Monthly Operating Report for Seabrook Station
ML022630609
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/09/2002
From: St.Pierre G
North Atlantic Energy Service Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NYN-02087
Download: ML022630609 (3)


Text

North Atlantic North Atlantic Energy Service Corporation P.O. Box 300 Seabrook, NH 03874 (603) 474-9521 The Northeast Utilities System September 9, 2002 Docket No. 50-443 NYN-02087 U. S. Nuclear Regulatory Commission AMttention: D-oc-um-ent C-o-ntrol Des-k-Washington, DC 20555-0001 Seabrook Station August 2002 Monthly OveratinR Report Enclosed please find Monthly Operating Report 02-08. This report addresses the operating and shutdown experience' relating't6 Seabro6k Stati6riiUnit I for the month of August, 2002 and is submitted- --,'in --tccordafc with?,`the" rere4uiiemien'ts-of- -Seabrook Station Technical Specification,6.8.1.5. :._ " ;:

Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Manager - Reactor Engineering, at (603) 773-7776.

Very truly yours,`

NORTH ATLANTIC ENERGY SERVICE CORP.

Gene F., St. Pierre Station Director V

i cc:

H, J:Miller, NRC Region I Administrator R.:'D. Starkey, NR&Project.Mahaýfger *Poi Directorate 12' G.T. Dentel,'NRC S'ehior Residenit Ifispe6t6r '

,*o

OPERATING DATA REPORT DOCKET NO.

50-443 UNIT Seabrook I DATE September 1, 2002 COMPLETED BY J. L Dalton TELEPHONE (603) 773-7025 OPERATING STATUS

1.

Unit Name.

Seabrook Station Unit 1

2.

Reporting Period:

AUGUST 2002

3.

Licensed Thermal Power (MWt):

3411.0

4.

Design Electrical Rating (Net MWe):

1148.0

5.

Maximum Dependable Capacity (Net MWe):

1155.3

6.

If Changes Occur in Capacity Ratings (Items Number 3 through 5)

Not Applicable Since Last Report, Give Reasons:

This Month Yr-to-Date Cumulative

7.

Number of Hours Reactor Was Critical 744.0 5201.7 91705.6

8.

Hours Generator On-Line 744.0 5154.7 88863.4

9.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

10.

Net Electrical Energy Generated (MWH) 859222 5904743 99790274 1 of 2 OPERATING

SUMMARY

The unit operated at 100% Rated Thermal Power (RTP) for the entire month. This yielded an availability factor of 100%nCnd a 'i-paffiiy-fct-itoof 99.96bas-eb o-n thliMDC uvaltief 1155.3 Net MWe.

UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: AUGUST 2002 4

NO.

DATE TYPE' DURATION REASON 2 METHOD OF SHUTTING IHOURS)

D R

I I

DOWN REACTOR s DOCKET NO.

50-443 UNIT Seabrook I DATE September 1, 2002 COMPLETED BY J. L Dalton TELEPHONE (603) 773-7025 CAUSE / CORRECTIVE ACTIONS

'I COMMENTS his month.

F:

Forced Reason-Method:

S:

Scheduled A - Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain) 2 of 2 1