ML022630609
| ML022630609 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 09/09/2002 |
| From: | St.Pierre G North Atlantic Energy Service Corp |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NYN-02087 | |
| Download: ML022630609 (3) | |
Text
North Atlantic North Atlantic Energy Service Corporation P.O. Box 300 Seabrook, NH 03874 (603) 474-9521 The Northeast Utilities System September 9, 2002 Docket No. 50-443 NYN-02087 U. S. Nuclear Regulatory Commission AMttention: D-oc-um-ent C-o-ntrol Des-k-Washington, DC 20555-0001 Seabrook Station August 2002 Monthly OveratinR Report Enclosed please find Monthly Operating Report 02-08. This report addresses the operating and shutdown experience' relating't6 Seabro6k Stati6riiUnit I for the month of August, 2002 and is submitted- --,'in --tccordafc with?,`the" rere4uiiemien'ts-of- -Seabrook Station Technical Specification,6.8.1.5. :._ " ;:
Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Manager - Reactor Engineering, at (603) 773-7776.
Very truly yours,`
NORTH ATLANTIC ENERGY SERVICE CORP.
Gene F., St. Pierre Station Director V
i cc:
H, J:Miller, NRC Region I Administrator R.:'D. Starkey, NR&Project.Mahaýfger *Poi Directorate 12' G.T. Dentel,'NRC S'ehior Residenit Ifispe6t6r '
,*o
OPERATING DATA REPORT DOCKET NO.
50-443 UNIT Seabrook I DATE September 1, 2002 COMPLETED BY J. L Dalton TELEPHONE (603) 773-7025 OPERATING STATUS
- 1.
Unit Name.
Seabrook Station Unit 1
- 2.
Reporting Period:
AUGUST 2002
- 3.
Licensed Thermal Power (MWt):
3411.0
- 4.
Design Electrical Rating (Net MWe):
1148.0
- 5.
Maximum Dependable Capacity (Net MWe):
1155.3
- 6.
If Changes Occur in Capacity Ratings (Items Number 3 through 5)
Not Applicable Since Last Report, Give Reasons:
This Month Yr-to-Date Cumulative
- 7.
Number of Hours Reactor Was Critical 744.0 5201.7 91705.6
- 8.
Hours Generator On-Line 744.0 5154.7 88863.4
- 9.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 10.
Net Electrical Energy Generated (MWH) 859222 5904743 99790274 1 of 2 OPERATING
SUMMARY
The unit operated at 100% Rated Thermal Power (RTP) for the entire month. This yielded an availability factor of 100%nCnd a 'i-paffiiy-fct-itoof 99.96bas-eb o-n thliMDC uvaltief 1155.3 Net MWe.
UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: AUGUST 2002 4
NO.
DATE TYPE' DURATION REASON 2 METHOD OF SHUTTING IHOURS)
D R
I I
DOWN REACTOR s DOCKET NO.
50-443 UNIT Seabrook I DATE September 1, 2002 COMPLETED BY J. L Dalton TELEPHONE (603) 773-7025 CAUSE / CORRECTIVE ACTIONS
'I COMMENTS his month.
F:
Forced Reason-Method:
S:
Scheduled A - Equipment Failure (Explain)
I - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain) 2 of 2 1
I