June 2003 Monthly Operating Report for Seabrook Station, Unit 1
ML031990250
Person / Time
Site: Seabrook 
Issue date: 07/09/2003
From: Pierre G
Florida Power & Light Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NYN-03057
Download: ML031990250 (3)


Text

-

t FPL Energy FPL Energy Seabrook Station Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 July 9, 2003 Docket No. 50-443 NYN-03057 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station June 2003 Monthly Operating Report Enclosed please find Monthly Operating Report 03-06. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of June, 2003 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.

Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Manager, at (603) 773-7776.

Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Station Director cc:

H. J. Miller, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate I-2 G.T. Dentel, NRC Senior Resident Inspector

OPERATING DATA REPORT DOCKET NO.

50-443 UNIT Seabrook I DATE July 1, 2003 COMPLETED BY P. E. Nardone TELEPHONE (603) 773-7074 OPERATING STATUS I.

Unit Name:

Seabrook Station Unit I

2.

Reporting Period:

JUNE 2003

3.

Licensed Thermal Power (MWt):

3411.0

4.

Design Electrical Rating (Net MWe):

1148.0

5.

Maximum Dependable Capacity (Net MWe):

1155.3

6.

If Changes Occur in Capacity Ratings (Items Number 3 through 5)

Not Applicable Since Last Report, Give Reasons:

This Month Yr-to-Date Cumulative

7.

Number of Hours Reactor Was Critical 720.0 4343.0 98977.6

8. Hours Generator On-Line 720.0 4343.0 96135A
9.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

10.

Net Electrical Energy Generated (MWH) 834612 5028997 108207901 OPERATING

SUMMARY

The unit operated at 100% Rated Thermal Power (RTP) except for three hours this month. Power was reduced on two separate occasions (99.5% and 98.0% RTP) to facilitate corrective maintenance on Turbine Control and Nuclear Instrumentation power supplies, respectively. This yielded an availability factor of 100% and a capacity factor of 100.34% based on the MDC value of 1155.3 Net MWe.

1 of 2

4 I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-443 UNrr Seabrook I DATE July 1,2003 COMPLETED BY P. E. Nardone TELEPHONE (603) 773-7074 MONTH: JUNE 2003 NO.

DATE TYPE' DURATION REASON METHOD OF SHUTrING CAUSE / CORRECTIVE ACTIONS (HBOURS)

DON REACTOR3 COMMENTS No entries for this montlh 2

3 F:

Forced Reason:

Method:

S:

Scheduled A - Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 -Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 -Other (Explain)

F - Administrative o - Operational Error (Explain)

H -Other (Explain)

~__...____________________________

2 of 2