May 2003 Monthly Operating Report for Seabrook Station Unit 1
ML031630960
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 06/05/2003
From: St.Pierre G
Florida Power & Light Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NYN-03047 03-005
Download: ML031630960 (3)


Text

FPL Energy FPL Energy Seabrook Station Seabrook Station P.o. Box 300 Seabrook, NH 03874 (603) 773-7000 June 5, 2003 Docket No. 50-443 NYN-03047 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station May 2003 Monthly Operating Report Enclosed please find Monthly Operating Report 03-05. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of May, 2003 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.

Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Manager, at (603) 773-7776.

Very truly yours, FPL Energy Seabrook, LLC A

Gene F. St. Pierre Station Director cc:

H. J. Miller, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate I-2 G.T. Dentel, NRC Senior Resident Inspector

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-443 Seabrook I June 1, 2003 P. E. Nardone (603) 773-7074 OPERATING STATUS

1.

Unit Name:

Seabrook Station Unit I

2.

Reporting Period:

MAY 2003

3.

Licensed Thermal Power (MWt):

3411.0

4.

Design Electrical Rating (Net MWe):

1148.0

5.

Maxinmm Dependable Capacity (Net MWe):

1155.3

6.

If Changes Occur in Capacity Ratings (Items Number 3 through 5)

Not Applicable Since Last Report, Give Reasons:

This Month Yr-to-Date Cumulative

7.

Number of Hours Reactor Was Critical 744.0 3623.0 98257.6

8.

Hours Generator On-Line 744.0 3623.0 95415.4

9.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

10.

Net Electrical Energy Generated (MWH) 862268 4194386 107373289 OPERATING

SUMMARY

The unit operated at 100% Rated Thermal Power (RTP) for the entire month. This yielded an availability factor of 100% and a capacity factor of 100.32% based on the MDC value of 1155.3 Net MWe.

I of2

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-443 UNIT Seabrook I DATE June, 2003 COMPLETED BY P. E. Nardone TELEPHONE (603) 773-7074 MONTH: MAY 2003 2 of 2

-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

-~~~~~~~~~~~~~~~~~~~~~~~

NO.

DATE TYPE' DURATION REASON' METHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS (HOURS)

DOWN REACTOR COMMENTS No entries for this month.

2 3

F:

Forced Reason:

Method:

S:

Scheduled A - Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

-